Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- IR 05000327/1988029 + (22:59:02, 16 March 2025)
- IR 05000324/1988200 + (22:59:10, 16 March 2025)
- ML20246H581 + (23:00:34, 16 March 2025)
- ML20246H528 + (23:00:44, 16 March 2025)
- IR 05000445/1989057 + (23:01:05, 16 March 2025)
- ML20246H376 + (23:02:02, 16 March 2025)
- CLI-88-10, Forwards Safety Evaluation Accepting Licensee Decommissioning Funding Assurance Plan.Plan Provides Necessary Assurance & Satisfies Requirements in Decision CLI-88-10 + (23:02:09, 16 March 2025)
- 05000293/LER-1981-036-03, /03X-01:on 810709,trip Points for Pressure Switche Higher than Tech Specs Limit Found During Surveillance Test. Caused by Drifting of Trip Point of Switches.Switches Replaced W/Rosemount Transmitters + (23:04:54, 16 March 2025)
- 05000293/LER-1980-049-03, /03X-01:on 800810 & 11,thermal Overload Relay Associated W/Breaker Tripped Resulting in Loss of Salt Svc Water Pump.Caused by Actuation of Thermal Overload Devices. Biofouling Control Improved + (23:05:01, 16 March 2025)
- ML20246H105 + (23:05:06, 16 March 2025)
- ML20246H075 + (23:05:15, 16 March 2025)
- IR 05000266/1998002 + (23:05:26, 16 March 2025)
- IR 05000440/1997016 + (23:05:30, 16 March 2025)
- IR 05000373/1997021 + (23:05:33, 16 March 2025)
- ML20246G981 + (23:05:48, 16 March 2025)
- ML20246G957 + (23:05:53, 16 March 2025)
- PMNS20200994, NRC Staff Questions on GE-Hitachi Topical Reports for the BWRX-300 Small Modular Reactor Design + (23:06:16, 16 March 2025)
- PMNS20200991, NRC Staff Questions on GE-Hitachi Topical Reports for the BWRX-300 Small Modular Reactor Design + (23:06:18, 16 March 2025)
- PMNS20200992, NRC Staff Questions on GE-Hitachi Topical Reports for the BWRX-300 Small Modular Reactor Design + (23:06:18, 16 March 2025)
- PMNS20200990, NRC Staff Questions on GE-Hitachi Topical Reports for the BWRX-300 Small Modular Reactor Design + (23:06:25, 16 March 2025)
- ML20246G701 + (23:06:29, 16 March 2025)
- PMNS20200987, NRC Staff Questions on GE-Hitachi Topical Reports for the BWRX-300 Small Modular Reactor Design + (23:06:31, 16 March 2025)
- PMNS20200985, NRC Staff Questions on GE-Hitachi Topical Reports for the BWRX-300 Small Modular Reactor Design + (23:06:33, 16 March 2025)
- PMNS20200986, NRC Staff Questions on GE-Hitachi Topical Reports for the BWRX-300 Small Modular Reactor Design + (23:06:33, 16 March 2025)
- PMNS20200984, NRC Staff Questions on GE-Hitachi Topical Reports for the BWRX-300 Small Modular Reactor Design + (23:06:38, 16 March 2025)
- PMNS20200983, NRC Staff Questions on GE-Hitachi Topical Reports for the BWRX-300 Small Modular Reactor Design + (23:06:39, 16 March 2025)
- PMNS20200982, NRC Staff Questions on GE-Hitachi Topical Reports for the BWRX-300 Small Modular Reactor Design + (23:06:40, 16 March 2025)
- PMNS20200981, NRC Staff Questions on GE-Hitachi Topical Reports for the BWRX-300 Small Modular Reactor Design + (23:06:40, 16 March 2025)
- PMNS20200980, NRC Staff Questions on GE-Hitachi Topical Reports for the BWRX-300 Small Modular Reactor Design + (23:06:42, 16 March 2025)
- PMNS20200979, NRC Staff Questions on GE-Hitachi Topical Reports for the BWRX-300 Small Modular Reactor Design + (23:06:44, 16 March 2025)
- IR 05000313/1989002 + (23:06:59, 16 March 2025)
- NUREG-0313, Safety Evaluation Supporting Amend 133 to License DPR-59 + (23:07:13, 16 March 2025)
- IR 05000440/1989017 + (23:07:51, 16 March 2025)
- IR 05000029/1989003 + (23:08:37, 16 March 2025)
- IR 05000317/1989017 + (23:08:52, 16 March 2025)
- ML20246F965 + (23:09:30, 16 March 2025)
- AECM-89-0044, Forwards Summary of Operating Experience - 1988. No Main Steam Line Safety Relief Valve Challenges Experienced or Failed Fuel Indications/Insps Occurred During 1988 + (23:11:04, 16 March 2025)
- 05000213/LER-1989-012, :on 890728,internal Audit Disclosed That Surveillance Procedures Re Weighing of C02 Bottles Not Done. Caused by Administrative Breakdown of Surveillance Tracking Sys.Maint Dept Instruction Being Developed + (23:11:16, 16 March 2025)
- NUREG-0040, Forwards NUREG-0040,Vol 11,Number 3 & Vol 13 Number 1 Re Quarterly Publication of Vendor Insps.W/O Encls + (23:13:38, 16 March 2025)
- 05000440/LER-1989-024, :on 890723,entry Into Operational Condition 2 Completed W/Suppression Pool Makeup Sys Inoperable.On 890725,vent Valve Found Open & Uncapped.Caused by Personnel Errors.Technicians Involved W/Event Counselled + (23:14:05, 16 March 2025)
- ML20246F579 + (23:14:08, 16 March 2025)
- NUREG-0881, Safety Evaluation Accepting Licensee Submittals & Addl Info on Environ Qualification & Design for Instrumentation,Per Reg Guide 1.97 + (23:14:24, 16 March 2025)
- ML20246F444 + (23:14:37, 16 March 2025)
- IR 05000213/1989010 + (23:15:59, 16 March 2025)
- ML20246F341 + (23:16:11, 16 March 2025)
- ML20246F242 + (23:16:34, 16 March 2025)
- 05000352/LER-1989-039, :on 890601,util Identified Deficiencies in Safe Shutdown Capabilities of Facility in Event of Fire.Caused by Lack of Detailed Procedures Used in Performing Safe Shutdown Analysis.Various Mods Completed Prior to Startup + (23:18:13, 16 March 2025)
- ML20246F043 + (23:18:37, 16 March 2025)
- ML20246E877 + (23:19:12, 16 March 2025)
- ML20246E855 + (23:19:20, 16 March 2025)
- ML20246E757 + (23:19:55, 16 March 2025)
- ML20246E748 + (23:19:58, 16 March 2025)