Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- 05000483/LER-1998-005, :on 980430,mispositioning of warm-up Steam Supply Valves to Tdafwp Results in TS 3.0.4 Violation During Refuel 9.Caused by ABHV0048 & ABHV0049 Not Being Opened Upon Sys Restoration.Revised Procedures + (18:08:54, 16 March 2025)
- TXX-8918, Advises That Case Documented Request for Action Re Facility Unit 1 1982 RCS Cold Hydrostatic Test Extended to 890424 + (18:08:59, 16 March 2025)
- IR 05000369/1998002 + (18:09:04, 16 March 2025)
- L-89-004, Forwards Response to NRC Re Violations Noted in Insp Rept 70-1151/88-19 on 881226-28.Response Withheld (Ref 10CFR2.790) + (18:09:07, 16 March 2025)
- NPL-98-0459, Responds to NRC Re Violations Noted in Insp Repts 50-266/98-06 & 50-301/98/06.Corrective Actions:Individual Involved in Event Was Immediately Counseled on Appropriate Procedure Use & Adherence Requirements + (18:09:30, 16 March 2025)
- IR 05000327/1998003 + (18:09:45, 16 March 2025)
- 05000324/LER-1989-005-02, :on 890313,HPCI Removed from Svc Due to Limitorque Torque Switches Set Too High.Caused by Software Error Which Caused Indicated Output Torque to Read High. Setting Adjusted.Also Reported Per Part 21 + (18:09:53, 16 March 2025)
- 05000322/LER-1989-002, :on 890309,full Reactor Protection Sys (RPS) Actuation Occurred While Attempting to Restore Power to RPS Bus B,Causing Reactor Trip.Caused by Personnel Error While Troubleshooting.Trip Setpoints Adjusted + (18:09:59, 16 March 2025)
- ML20248J677 + (18:10:02, 16 March 2025)
- IR 05000245/1996009 + (18:10:03, 16 March 2025)
- ML20248J673 + (18:10:05, 16 March 2025)
- ML20248J669 + (18:10:08, 16 March 2025)
- IR 05000312/1989004 + (18:10:14, 16 March 2025)
- IR 05000483/1998006 + (18:10:17, 16 March 2025)
- NSD-NRC-98-5646, Forwards Proprietary Results of AP600 Design Assurance Review,Per Commitment Contained in W Response to Violations Noted in Insp Rept 99900404/97-02. Proprietary Portion of Document Was Sent to Westinghouse + (18:10:18, 16 March 2025)
- ML20248J635 + (18:10:24, 16 March 2025)
- IR 05000458/1998005 + (18:10:26, 16 March 2025)
- ML20248J626 + (18:10:30, 16 March 2025)
- IR 05000445/1997018 + (18:10:31, 16 March 2025)
- ML20248J622 + (18:10:34, 16 March 2025)
- IR 05000327/1998001 + (18:10:35, 16 March 2025)
- ML20248J609 + (18:10:39, 16 March 2025)
- IR 05000298/1998012 + (18:10:43, 16 March 2025)
- 05000220/LER-1998-011-01, :on 980503,inadvertent Actuation of RPS Circuitry Occurred Due to Personnel Error.Fuse Was Replaced & SDC Was Placed Into Svc + (18:10:55, 16 March 2025)
- TAC:L32014 + (18:11:16, 16 March 2025)
- NRC-89-0052, Supplemental Reload Licensing Submittal for Fermi Plant Unit 2,Reload 1,Cycle 2 + (18:11:21, 16 March 2025)
- IR 05000331/1998004 + (18:11:35, 16 March 2025)
- 05000341/LER-1989-007, :on 890307,increasing Trend Observed in Vibration of Number 8 Bearing on Main Turbine Generator. Cause Undetermined.Turbine Balanced in Subsequent Outage. Disassembly &/Or Insp of Portions Planned + (18:11:39, 16 March 2025)
- IR 05000482/1998007 + (18:11:49, 16 March 2025)
- ML20248J413 + (18:11:56, 16 March 2025)
- IR 05000395/1998003 + (18:12:26, 16 March 2025)
- 05000313/LER-1998-002-03, :on 980505,automatic Actuation of CREVS Occurred Due to Higher than Normal Radiation at Detector When Filtration/Vacuum Assembly Was Moved in Adjacent Area. Revised Procedures to Add Noted Precautions + (18:12:33, 16 March 2025)
- ML20248J283 + (18:12:47, 16 March 2025)
- TAC:M98441 + (18:12:57, 16 March 2025)
- 05000313/LER-1989-008, :on 890122,determined That When Bypass Valve GCH-29 Normally Open,Ability of Radiation Monitors to Perform Required Functions Not Ensured.Caused by Error in Design Change in Bypass Line & Valve + (18:13:00, 16 March 2025)
- TAC:67016 + (18:13:01, 16 March 2025)
- ML20248J228 + (18:13:06, 16 March 2025)
- ML20248J224 + (18:13:10, 16 March 2025)
- ML20248J217 + (18:13:14, 16 March 2025)
- ML20248J215 + (18:13:16, 16 March 2025)
- NUREG-0683, Provides EPA W/Final Suppl 3 to Programmatic EIS Which Addresses Environ Considerations Under Natl Environ Policy Act of 1969 + (18:13:17, 16 March 2025)
- ML20248J207 + (18:13:23, 16 March 2025)
- ML20248J198 + (18:13:32, 16 March 2025)
- 05000361/LER-1998-009, :on 980429,discovered That CST Was Outside Design Basis Due to Procedure Error.Caused by Individual Error.Replaced Steps That Had Been Inadvertently Deleted from Aoi + (18:13:36, 16 March 2025)
- 05000361/LER-1996-012, :on 960229,discovered That CST Was Outside Design Basis.Cause Under Investigation.Compensatory Measures Were Put in Place to Administratively Increase Tanks Water Volume & to Procedularize Operator Actions + (18:13:42, 16 March 2025)
- ML20248J097 + (18:14:06, 16 March 2025)
- 05000324/LER-1989-014-02, :on 890910,primary Containment Local Leak Rate Testing Revealed Leakage Which Degraded Primary Containment Safety Barrier.Cause Under Investigation for Root Cause Determination.Leak Rate Testing Continuing + (18:14:10, 16 March 2025)
- 05000220/LER-1998-007-02, :on 980424,SRO Was Not in CR for Two Minutes. Caused by Insufficient Awareness of Assistant Station SS Role & Actions on Nuclear Safety.Counseled Assistant Station SS & Relieved Supervisor of Licensed Duties + (18:14:21, 16 March 2025)
- ML20248J060 + (18:14:29, 16 March 2025)
- 05000395/LER-1998-005, :on 980430,inadequate ASME Code Relief Valve Surveillance Testing Was Determined.Caused by Failure to Upgrade IST Implementing Procedures to Address Addl Test Requirements.Initiated Review + (18:14:36, 16 March 2025)
- 05000271/LER-1998-012, :on 980430,six Primary Containment Isolation Valves Were Declared Inoperable.Caused by Failure to Adequately Define Standards for Reducing Contact Forces Caused by Sharp Edges.Event Rept Initiated + (18:14:45, 16 March 2025)