Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- 05000302/LER-2002-002, For Crystal River Unit 3 Regarding Reactor Trip Due to Substation Generator Output Breaker Relay Mis-Operation + (18:38:48, 16 January 2025)
- ML023520156 + (18:38:48, 16 January 2025)
- ML023520153 + (18:38:49, 16 January 2025)
- ML023520151 + (18:38:50, 16 January 2025)
- ML023520131 + (18:38:51, 16 January 2025)
- ML023520116 + (18:38:52, 16 January 2025)
- ML023520113 + (18:38:53, 16 January 2025)
- ML023520103 + (18:38:53, 16 January 2025)
- ML023520097 + (18:38:54, 16 January 2025)
- ML023520094 + (18:38:55, 16 January 2025)
- CNRO-2002-00057, Entergy Operation, Inc., Request to Use Alternate Testing Frequency for Inservice Testing + (18:38:56, 16 January 2025)
- BYRON 2002-0129, Generator Inservice Inspection Summary Report + (18:38:57, 16 January 2025)
- ML023520075 + (18:38:58, 16 January 2025)
- ML023520071 + (18:38:59, 16 January 2025)
- ML023520068 + (18:39:00, 16 January 2025)
- ML023520067 + (18:39:01, 16 January 2025)
- 05000272/LER-2002-005, Re Unexpected auto-start of Turbine Driven Auxiliary Feedwater Pump at Start of Refueling Outage + (18:39:04, 16 January 2025)
- 05000219/LER-2002-002, Local Leak Rate Test Results in Excess of Technical Specification Limits + (18:39:07, 16 January 2025)
- ML023520062 + (18:39:07, 16 January 2025)
- IR 05000410/2002303 + (18:39:08, 16 January 2025)
- ML023520060 + (18:39:09, 16 January 2025)
- L-2002-239, Proposed License Amendments Request for Additional Information Response on Risk Informed One Time Increase in Integrated Leak Rate Test Surveillance Interval + (18:39:09, 16 January 2025)
- ML023520053 + (18:39:10, 16 January 2025)
- ML023520050 + (18:39:20, 16 January 2025)
- 0CAN120203, November 2002 Monthly Operating Report for Arkansas Nuclear One Units 1 & 2 + (18:39:21, 16 January 2025)
- ML023520049 + (18:39:21, 16 January 2025)
- 05000249/LER-2002-003, Reactor Recirculation Loop a Sensing Line Socket Weld Vibration Fatigue Failure + (18:39:25, 16 January 2025)
- WO 02-0061, November 2002 Monthly Operating Report for Wolf Creek Generating Station + (18:39:25, 16 January 2025)
- ML023520037 + (18:39:26, 16 January 2025)
- ML023520035 + (18:39:27, 16 January 2025)
- ML023520033 + (18:39:28, 16 January 2025)
- 05000316/LER-2002-007, Re Technical Specification 3.8.1.1 Allowed Outage Time Exceeded + (18:39:31, 16 January 2025)
- ML023520031 + (18:39:31, 16 January 2025)
- ML023520029 + (18:39:32, 16 January 2025)
- LR-N02-0413, Response to Request for Additional Information Regarding Integrated Leak Rate Test Interval Extension + (18:39:33, 16 January 2025)
- IR 05000020/2002203 + (18:39:34, 16 January 2025)
- ML023510613 + (18:39:36, 16 January 2025)
- ML023510620 + (18:39:36, 16 January 2025)
- ML023510589 + (18:39:37, 16 January 2025)
- LIC-02-0145, Transmittal of Boundary Drawings Referenced in Responses to Request for Additional Information (RAI) for Review of License Renewal Application for Fort Calhoun Station, Unit 1 + (18:39:38, 16 January 2025)
- ML023510553 + (18:39:40, 16 January 2025)
- ML023510521 + (18:39:41, 16 January 2025)
- ML023510516 + (18:39:42, 16 January 2025)
- ML023510509 + (18:39:44, 16 January 2025)
- ML023510446 + (18:39:45, 16 January 2025)
- NL-02-155, Proposed Changes to Technical Specifications: Measurement Uncertainty Recapture Power Uprate Increase of Licensed Thermal Power (1.4%) + (18:39:46, 16 January 2025)
- ML023510436 + (18:39:47, 16 January 2025)
- ML023510433 + (18:39:48, 16 January 2025)
- PNO-IV-02-077, Union Electric Co., Automatic Reactor Trip While Reducing Power Due to Condensate Pump Failure + (18:39:52, 16 January 2025)
- ML023510361 + (18:39:53, 16 January 2025)
- ML023510360 + (18:39:53, 16 January 2025)
- ML023510350 + (18:39:54, 16 January 2025)