Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML031611052 + (14:28:32, 16 January 2025)
- ML031611053 + (14:28:32, 16 January 2025)
- ML031611051 + (14:28:34, 16 January 2025)
- IR 05000344/2003002 + (14:28:34, 16 January 2025)
- ML031611049 + (14:28:35, 16 January 2025)
- B18911, Answer, Response & Request for Clarification to Order for Compensatory Measures Related to Fitness-for-Duty Enhancements Applicable to Nuclear Facility Security Force Personnel Dated April 28, 2003 + (14:28:36, 16 January 2025)
- NG-03-0355, Ctr Technical Specification Change Request, Eliminate Requirements for Post Accident Sampling System Using Consolidated Line Item Improvement Process + (14:28:38, 16 January 2025)
- 05000413/LER-2003-003, For Catawba Unit 1, Failure of 4160 Volt Breaker Renders 1B1 Component Cooling Water Pump Inoperable for Longer than Technical Specifications Allow + (14:28:42, 16 January 2025)
- ML031611043 + (14:28:42, 16 January 2025)
- B18917, Changes to Reactor Pressure Vessel Surveillance Capsule Withdrawal Schedule + (14:28:46, 16 January 2025)
- ML031611037 + (14:28:48, 16 January 2025)
- ML031611035 + (14:28:49, 16 January 2025)
- ML031611034 + (14:28:49, 16 January 2025)
- ML031611033 + (14:28:50, 16 January 2025)
- ML031611030 + (14:28:51, 16 January 2025)
- ML031611031 + (14:28:51, 16 January 2025)
- ML031611029 + (14:28:52, 16 January 2025)
- ML031611027 + (14:28:53, 16 January 2025)
- ML031611026 + (14:28:53, 16 January 2025)
- ML031611020 + (14:28:54, 16 January 2025)
- ML031611018 + (14:28:55, 16 January 2025)
- ML031611011 + (14:28:55, 16 January 2025)
- ULNRC-04858, Answer, Response and Request for Clarification in Response to April 29, 2003, Order for Compensatory Measures Related to Training Enhancements on Tactical and Firearms Proficiency and Physical Fitness Applicable to Armed Nuclear Power Pl + (14:28:56, 16 January 2025)
- ML031611007 + (14:28:57, 16 January 2025)
- ULNRC-04854, Revision to TS 3.8.3, Diesel Fuel Oil, Lube Oil, & Starting Air + (14:28:57, 16 January 2025)
- 05000323/LER-2003-005, For Diablo Canyon Unit 2, Technical Specification 3.7.5.C Required Shutdown Due to Personnel Error + (14:29:01, 16 January 2025)
- HNP-03-061, Emergency Core Cooling System Evaluation Changes + (14:29:02, 16 January 2025)
- ML031611003 + (14:29:02, 16 January 2025)
- 05000397/LER-2003-001, For Columbia Residual Heat Removal (RHR) B Train Potentially Inoperable During a Design Basis Event Due to Apparent Inability of System to Adequately Maintain Pressure as Assumed in Appendix R Analysis + (14:29:05, 16 January 2025)
- L-PI-03-055, Response to Request for Additional Information Regarding the Application of Leak-Before-Break Technology to Replacement Steam Generator Design + (14:29:06, 16 January 2025)
- ML031610998 + (14:29:06, 16 January 2025)
- 05000324/LER-2003-003, Re Unit 2 Scram During Startup Due to Electro Hydraulic Control System Malfunction + (14:29:09, 16 January 2025)
- ML031610995 + (14:29:10, 16 January 2025)
- ML031610992 + (14:29:11, 16 January 2025)
- ML031610993 + (14:29:11, 16 January 2025)
- ML031610991 + (14:29:12, 16 January 2025)
- ULNRC-04859, Answer, Response and Request for Clarification in Response to April 29, 2003, Order for Compensatory Measures Related to Fitness-for-Duty Enhancements Applicable to Nuclear Facility Security Force Personnel (EA-03-038) + (14:29:16, 16 January 2025)
- CPSES-200301168, Day Response and Request for Clarification in Response to NRC Order Requiring Compliance with Revised Design Basis Threat (DBT) for Operating Power Reactors (EA-03-086) + (14:29:18, 16 January 2025)
- CPSES-200301186, 35 Day Response and Request for Clarification in Response to NRC Order for Compensatory Measures Related to Training Enhancements on Tactical and Firearm Proficiency and Physical Fitness Applicable to Armed Nuclear Power Plant Securi + (14:29:19, 16 January 2025)
- ML031610970 + (14:29:20, 16 January 2025)
- TXX-0309, Day Response to NRC Order Compensatory Measures Related to Fitness-for-Duty Enhancements Applicable to Nuclear Facility Security Force Personnel (EA-03-038) + (14:29:20, 16 January 2025)
- ML031610964 + (14:29:22, 16 January 2025)
- ML031610958 + (14:29:23, 16 January 2025)
- ML031610957 + (14:29:26, 16 January 2025)
- ML031610954 + (14:29:27, 16 January 2025)
- B18909, Answer, Response and Request for Clarification to Order for Compensatory Measures Related to Training Enhancements on Tactical and Firearms Proficiency and Physical Fitness Applicable to Armed Nuclear Power Plant Security Force Personnel Da + (14:29:28, 16 January 2025)
- ML031610949 + (14:29:30, 16 January 2025)
- ML031610942 + (14:29:31, 16 January 2025)
- ML031610934 + (14:29:32, 16 January 2025)
- ML031610933 + (14:29:32, 16 January 2025)
- L-MT-03-044, Response to Request for Additional Information Regarding Relief Request No. PR-04 + (14:29:33, 16 January 2025)
- B18908, License Basis Document Change Request (LBDCR) 2-18-02 Selective Implementation of the Alternative Source Term - Fuel Handling Accident Analyses Response to Request for Additional Information + (14:29:34, 16 January 2025)