Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20066A844 + (23:45:05, 16 December 2024)
- ML20066A838 + (23:45:06, 16 December 2024)
- ML20066A841 + (23:45:06, 16 December 2024)
- ML20066A835 + (23:45:07, 16 December 2024)
- 05000373/LER-1982-133, Forwards LER 82-133/03L-0 + (23:45:08, 16 December 2024)
- A820020, Forwards Revision to Inservice Testing Relief Requests Re Pump Vibration Testing + (23:45:08, 16 December 2024)
- NRC-90-0170, Responds to Violations Noted in Insp Rept 50-341/90-18. Corrective Actions:Personnel Assigned to Survey Radioactive Matl Shipments Will Receive Training on Revised Procedure 67.000.103 Re Survey of Radwaste Shipment Vehicles + (23:45:09, 16 December 2024)
- ML20066A826 + (23:45:09, 16 December 2024)
- NRC-90-0186, Submits Update to Simulator Upgrade Project Schedule. Exemption Request from 10CFR50.12, Specific Exemptions Will Be Submitted in Jan 1991 to Provide Required Simulator Certification to NRC Later in 1991 + (23:45:10, 16 December 2024)
- 05000373/LER-1982-112-03, /03L-0:on 820929,during Performance of LIS-NB-01, DPIS-1B21-N024D Setpoint for Reactor Vessel Low Water Level Scram Found Out of Calibr.Caused by Instrument Drift.Switch Recalibr.Revision in Progress to Change Tolerance Setp + (23:45:12, 16 December 2024)
- ML20066A816 + (23:45:13, 16 December 2024)
- ML20066A814 + (23:45:14, 16 December 2024)
- 05000311/LER-1982-114-03, /03L-0:on 820927,RMS Apd Filter Drive Unit Malfunctioned.Caused by Slipped Pin Attaching Solenoid Arm to Ratchet Cog.Pin Installed Through Bottom Instead of Top of Connecting Sleeve.Pin Reinstalled Correctly + (23:45:16, 16 December 2024)
- 05000373/LER-1982-112, Forwards LER 82-112/03L-0 + (23:45:17, 16 December 2024)
- ML20066A795 + (23:45:17, 16 December 2024)
- B10589, Informs of Integrated Leak Rate Testing Schedule.Test Will Be Performed at End of 1983 Refueling Outage + (23:45:18, 16 December 2024)
- 05000311/LER-1982-114, Forwards LER 82-114/03L-0.Detailed Event Analysis Encl + (23:45:19, 16 December 2024)
- ML20066A769 + (23:45:19, 16 December 2024)
- ML20066A768 + (23:45:20, 16 December 2024)
- ML20066A729 + (23:45:29, 16 December 2024)
- 05000317/LER-1982-060-04, /04X-0:on 820827,oyster Samples Showed Higher than Normal Concentration of Ag-110m.Caused by Natural Tendency of Oysters to Concentrate Environ Silver.All Releases in First Half of 1982 within Tech Spec Allowable Limits + (23:45:31, 16 December 2024)
- 05000237/LER-1982-019-03, Thermocouple on Electromatic Relief Valve 2-203-3D Failed Open.Caused by Broken Ceramic Insulator in Thermocouple Head & Twisted Wires Due to Improper Installation.Thermocouple Replaced + (23:45:34, 16 December 2024)
- 05000334/LER-1982-039-03, /03L-0:on 820912,control Rod H-14 Analog Position Found 15 Steps Below Group Step Counter Demand Position. Caused by Primary to Secondary Voltage Signal Conditioning Module Drift.Module Removed for Insp & Returned to Svc + (23:45:36, 16 December 2024)
- ML20066A711 + (23:45:37, 16 December 2024)
- ML20066A709 + (23:45:39, 16 December 2024)
- 05000318/LER-1982-004-01, During Surveillance Test, Steam Generator 22 Pressure Indication on Remote Shutdown Monitoring Instrumentation Panel Read High.Caused by Valve Packing Leak.Transmitter Recailbr + (23:45:42, 16 December 2024)
- 05000334/LER-1982-039, Forwards LER 82-039/03L-0 + (23:45:43, 16 December 2024)
- 05000237/LER-1982-019, Forwards Updated LER 82-019/03X-1 + (23:45:44, 16 December 2024)
- ML20066A696 + (23:45:44, 16 December 2024)
- 05000317/LER-1982-060, Forwards LER 82-060/04X-0 + (23:45:45, 16 December 2024)
- 05000272/LER-1982-042, Supplemental LER 82-042/03X-1:on 820628,valves 12AF10 & 12AF86 Discovered Open.Caused by Personnel Negligence in Failure to Notice That Chains on Valves Improperly Installed.Valve Operation & Tagging Lesson Plans Revised + (23:45:46, 16 December 2024)
- ML20066A688 + (23:45:46, 16 December 2024)
- 05000318/LER-1982-043-03, /03L-0:on 820929 & 1012,while Attempting to Parallel Emergency Diesel Generator 12 to 4-kV Bus,Generator Output Breaker Tripped,Rendering Generator Inoperable.Caused by Misaligned Contacts on Bus Disconnect Switch Key + (23:45:49, 16 December 2024)
- 05000333/LER-1982-048-03, /03L-0:on 821020,number 4 Plant 115-kV Lines Removed from Svc for 2-h.Caused by Extension Cord Being Dropped Across Two Phases of Line.Line de-energized,fault Cleared & Line re-energized + (23:45:54, 16 December 2024)
- RBG-13-650, Final Deficiency Rept DR-43 Re Unsatisfactory Insps Performed by Former Field QC Inspector.Insps Conducted by Inspector Reinspected.Problem Was Isolated Case.Increased Supervision Stressed + (23:45:55, 16 December 2024)
- 05000333/LER-1982-048, Forwards LER 82-048/03L-0 + (23:45:56, 16 December 2024)
- 05000318/LER-1982-043, Forwards LER 82-043/03L-0 + (23:45:56, 16 December 2024)
- 05000293/LER-1982-042-03, /03L-0:on 820929,during Timing Surveillance,Hpci Torus Suction Valve MO-2301-35 Failed to Operate.Caused by Open Field Winding on Operating Motor.Motor Rewound,Valve Tested for Binding & Returned to Svc + (23:45:58, 16 December 2024)
- ML20066A636 + (23:45:59, 16 December 2024)
- 05000311/LER-1982-118-03, /03L-0:on 820929,during Routine Surveillance, 2C Vital Bus Undervoltage Relay Failed to Drop Out on Decreasing Voltage.Caused by Out of Adjustment Relay Stop Lever.Lever Adjusted & Satisfactorily Tested + (23:46:00, 16 December 2024)
- 05000293/LER-1982-042, Forwards LER 82-042/03L-0 + (23:46:01, 16 December 2024)
- ML20066A607 + (23:46:02, 16 December 2024)
- 05000293/LER-1982-043-03, /03L-0:on 820930,during Surveillance Test,Position Indication Lost for Motor Operated Valve 1301-25 RCIC Torus Suction Valve.Caused by Sticky Contacts on Motor Controller. Relay Cleaned,Valve Cycled,Test Completed & Shutdown + (23:46:04, 16 December 2024)
- B13688, Responds to NRC Re Violations Noted in Insp Rept 50-423/90-19.Corrective Actions:Fire Door Placed in Closed Position & Vendor Fire Watch Supervisor Control Responsibilities Reemphasized + (23:46:05, 16 December 2024)
- 05000333/LER-1982-046-03, /03L-0:on 821007,intermediate Range Monitor B Inoperative Trip Function Did Not Trip B Side RPS Logic on Simulated Downscale Signal.Caused by Failed Diode in Mean Squared Analog Mondule.Diode Replaced + (23:46:07, 16 December 2024)
- 05000311/LER-1982-118, Forwards LER 82-118/03L-0.Detailed Event Analysis Encl + (23:46:08, 16 December 2024)
- 05000333/LER-1982-046, Forwards LER 82-046/03L-0 + (23:46:09, 16 December 2024)
- ML20066A588 + (23:46:09, 16 December 2024)
- ML20066A581 + (23:46:10, 16 December 2024)
- ML20066A579 + (23:46:10, 16 December 2024)
- 05000293/LER-1982-043, Forwards LER 82-043/03L-0 + (23:46:14, 16 December 2024)