Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- RBG-34-499, Revised Ro:From 901005-06,two 42X Relays in Div 1 Standby Cooling Tower Fans Experienced Failures,Rendering Fans Inoperable.Caused by Cracked Coils on Relays & Low Coil Resistance.Relays Replaced & Ventilation Sys Redesigned + (16:51:09, 16 December 2024)
- ML20066J688 + (16:51:10, 16 December 2024)
- ML20066J663 + (16:51:11, 16 December 2024)
- ML20066J667 + (16:51:11, 16 December 2024)
- ELV-02363, Provides Addl Info Re Application for Amend to Tech Spec Changes Associated W/Use of VANTAGE-5 Fuel,Per NRC Request + (16:51:12, 16 December 2024)
- ML20066J640 + (16:51:12, 16 December 2024)
- ML20066J633 + (16:51:13, 16 December 2024)
- ML20066J618 + (16:51:14, 16 December 2024)
- ML20066J628 + (16:51:14, 16 December 2024)
- ML20066J608 + (16:51:15, 16 December 2024)
- ML20066J609 + (16:51:15, 16 December 2024)
- A08915, Provides Addl Info Re Second ten-yr Inservice Test Program, Per NRC .Info Provided to Suppl & Clarify Info Identified in Subj Safety Evaluation & in App C of Technical Evaluation Rept + (16:51:16, 16 December 2024)
- ML20066J602 + (16:51:16, 16 December 2024)
- 0CAN029101, Application for Amends to Licenses DPR-51 & NPF-6,revising Tech Spec Table 6.2-1 to Increase Number of Licensed & Nonlicensed Operators Required When Plant in Mode Above Cold Shutdown + (16:51:17, 16 December 2024)
- ML20066J579 + (16:51:18, 16 December 2024)
- 05000316/LER-1982-085-03, /03L-0:on 821021,two Styluses on Containment Sump Level & Flow Monitoring Recorder Inoperable.Caused by Binding of Recorder Mechanism Causing Styluses to Remain in Slightly Raised Position + (16:51:20, 16 December 2024)
- ML20066J570 + (16:51:21, 16 December 2024)
- ML20066J566 + (16:51:22, 16 December 2024)
- 05000316/LER-1982-085, Forwards LER 82-085/03L-0 + (16:51:27, 16 December 2024)
- ML20066J550 + (16:51:27, 16 December 2024)
- ML20066J543 + (16:51:28, 16 December 2024)
- 05000331/LER-1982-072-03, /03L-0:on 821026,pressure Switches Controlling Reactor Bldg to Suppression Chamber Vacuum Breakers Tripped Conservatively.Caused by Instrument Drift Due to Large Range of Switches Resulting in Decreased Setpoint Accuracy + (16:51:30, 16 December 2024)
- ML20066J540 + (16:51:31, 16 December 2024)
- ML20066J535 + (16:51:31, 16 December 2024)
- ML20066J528 + (16:51:32, 16 December 2024)
- ML20066J530 + (16:51:32, 16 December 2024)
- 05000331/LER-1982-072, Forwards LER 82-072/03L-0 + (16:51:33, 16 December 2024)
- ML20066J524 + (16:51:33, 16 December 2024)
- ML20066J523 + (16:51:34, 16 December 2024)
- ML20066J520 + (16:51:35, 16 December 2024)
- ML20066J514 + (16:51:36, 16 December 2024)
- ML20066J517 + (16:51:36, 16 December 2024)
- ML20066J513 + (16:51:37, 16 December 2024)
- ML20066J507 + (16:51:39, 16 December 2024)
- ML20066J504 + (16:51:40, 16 December 2024)
- 05000374/LER-1990-001-01, :on 900206,reactor Scram Occurred During Instrument Surveillance.Cause of Spurious Spike of APRM E Unknown.Troubleshooting of APRM Continues Under Work Request L96857 & CRD Inspected & Rebuilt + (16:51:44, 16 December 2024)
- ML20066J496 + (16:51:45, 16 December 2024)
- ML20066J483 + (16:51:46, 16 December 2024)
- ML20066J494 + (16:51:46, 16 December 2024)
- ML20066J465 + (16:51:47, 16 December 2024)
- ML20066J479 + (16:51:47, 16 December 2024)
- ML20066J455 + (16:51:48, 16 December 2024)
- ML20066J451 + (16:51:50, 16 December 2024)
- ML20066J450 + (16:51:51, 16 December 2024)
- ML20066J446 + (16:51:52, 16 December 2024)
- ML20066J440 + (16:51:53, 16 December 2024)
- ML20066J428 + (16:51:55, 16 December 2024)
- NRC-91-3569, Forwards Proprietary SER Re Preliminary Design of Std Nuclear Steam Supply Ref Sys RESAR SP/90. Encl Withheld + (16:51:55, 16 December 2024)
- ML20066J422 + (16:51:56, 16 December 2024)
- ML20066J421 + (16:51:57, 16 December 2024)
- L-91-050, Forwards Response to Violations Noted in Insp Repts 50-250/90-45 & 50-251/90-45.Response Withheld + (16:51:58, 16 December 2024)
- ML20066J417 + (16:51:59, 16 December 2024)