Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20067E574 + (16:23:50, 16 December 2024)
- ML20067E570 + (16:23:50, 16 December 2024)
- ML20067E569 + (16:23:51, 16 December 2024)
- 05000321/LER-1991-001-01, :on 910118,reactor Scrammed Due to Remote Transmission Line Failure Coupled W/Switchyard Breaker Failure.Failed Power Line & Breaker Repaired & Failed HPCI Speed Controller Replaced + (16:23:53, 16 December 2024)
- ML20067E560 + (16:23:54, 16 December 2024)
- ML20067E559 + (16:23:55, 16 December 2024)
- ML20067E558 + (16:23:56, 16 December 2024)
- ML20067E554 + (16:23:57, 16 December 2024)
- ML20067E556 + (16:23:57, 16 December 2024)
- ML20067E548 + (16:23:58, 16 December 2024)
- ML20067E552 + (16:23:58, 16 December 2024)
- 05000374/LER-1991-001-04, :on 910110,three Open Conduit Penetrations Discovered on 687 Ft Elevation of Diesel Generator Bldg Fire Rated Barriers,Which Could Render HPCS Inoperable.Caused by Personnel Error.Fire Watch Initiated + (16:24:00, 16 December 2024)
- ML20067E530 + (16:24:01, 16 December 2024)
- B13736, Forwards Addl Info Re 901025 Application for Amend to License NPF-49,deleting Surveillance Requirements in TS Section 4.5.2.d.1 Re RHR Autoclosure Interlock Concurrent W/ Removal of Autoclosure Interlock Circuitry + (16:24:02, 16 December 2024)
- ML20067E527 + (16:24:02, 16 December 2024)
- ML20067E515 + (16:24:03, 16 December 2024)
- ML20067E521 + (16:24:03, 16 December 2024)
- ML20067E511 + (16:24:06, 16 December 2024)
- 3F0291-04, Monthly Operating Rept for Jan 1991 for Crystal River Unit 3 + (16:24:07, 16 December 2024)
- ML20067E509 + (16:24:10, 16 December 2024)
- ML20067E508 + (16:24:14, 16 December 2024)
- ML20067E507 + (16:24:16, 16 December 2024)
- ML20067E501 + (16:24:19, 16 December 2024)
- ML20067E468 + (16:24:25, 16 December 2024)
- ML20067E466 + (16:24:32, 16 December 2024)
- NRC-91-0014, Contests Fee Charged Re Tech Spec Change Which Added Valve T50-F458 to List of Remote Manual Isolation Valves in Table 3.6.3-1,per NRC + (16:24:33, 16 December 2024)
- ML20067E458 + (16:24:43, 16 December 2024)
- ML20067E454 + (16:24:47, 16 December 2024)
- ML20067E443 + (16:24:52, 16 December 2024)
- ML20067E440 + (16:24:53, 16 December 2024)
- ML20067E438 + (16:24:59, 16 December 2024)
- ML20067E427 + (16:25:00, 16 December 2024)
- ML20067E424 + (16:25:00, 16 December 2024)
- ML20067E400 + (16:25:02, 16 December 2024)
- ML20067E389 + (16:25:05, 16 December 2024)
- ML20067E381 + (16:25:06, 16 December 2024)
- L-91-026, Provides Evaluation of 901203 Fire in Drywell Personnel Airlock Identified in LER 1-90-026.Assessment Covers Fire & Effect on Plant Sys/Components + (16:25:07, 16 December 2024)
- ML20067E372 + (16:25:08, 16 December 2024)
- ML20067E358 + (16:25:09, 16 December 2024)
- ML20067E361 + (16:25:09, 16 December 2024)
- ML20067E351 + (16:25:11, 16 December 2024)
- BECO-91-012, Proposed Tech Specs Re Limiting Conditions for Operation & Surveillance Requirements for Primary Containment Integrity & Primary Containment Isolation Valves + (16:25:12, 16 December 2024)
- ML20067E345 + (16:25:12, 16 December 2024)
- ML20067E337 + (16:25:13, 16 December 2024)
- ML20067E340 + (16:25:13, 16 December 2024)
- ML20067E332 + (16:25:14, 16 December 2024)
- ML20067E335 + (16:25:14, 16 December 2024)
- ML20067E323 + (16:25:16, 16 December 2024)
- ML20067E288 + (16:25:18, 16 December 2024)
- 05000416/LER-1982-149-03, /03L-0:on 821129,QA Audit Revealed That Beginning on 820923,during Periods When Plant in Hot Shutdown, Containment to Auxiliary Bldg Differential Pressure Verified Every 24 H Instead of Every 12 H.Caused by Personnel Error + (16:25:20, 16 December 2024)
- ML20067E275 + (16:25:22, 16 December 2024)