Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20069P406 + (15:16:11, 16 December 2024)
- ML20069P402 + (15:16:12, 16 December 2024)
- ML20069P398 + (15:16:13, 16 December 2024)
- ML20069P390 + (15:16:14, 16 December 2024)
- ML20069P385 + (15:16:14, 16 December 2024)
- ML20069P382 + (15:16:15, 16 December 2024)
- NPL-94-0237, Forwards Response to NRC 940524 RAI Re Installation of Two Addl EDGs + (15:16:16, 16 December 2024)
- 05000333/LER-1994-003-01, :on 940518,identified That TS Requirement to Visually Inspect Battery Cell Plates Removed from Procedure. Caused by Personnel Error.Ts Interpretation Written to Describe How to Conduct Cell Plate Insp + (15:16:18, 16 December 2024)
- ML20069P342 + (15:16:18, 16 December 2024)
- ST-HL-AE-4815, Forwards Description of Util Review of NRC Accident Sequence Precursor Analysis W/Results of Util IPE Analysis + (15:16:19, 16 December 2024)
- ST-HL-AE-4814, Forwards Revised Emergency Procedures,Including Rev 7 to 0ERP01-ZV-SH01, Shift Supervisor & Rev 3 to 0ERP01-ZV-TP01, Offsite Dose Calculations. W/O Encls + (15:16:20, 16 December 2024)
- ML20069P322 + (15:16:20, 16 December 2024)
- ML20069P277 + (15:16:21, 16 December 2024)
- ML20069P270 + (15:16:22, 16 December 2024)
- ML20069P271 + (15:16:22, 16 December 2024)
- ML20069P238 + (15:16:23, 16 December 2024)
- ML20069P261 + (15:16:23, 16 December 2024)
- A820022, Responds to NRC 821202 Telcon Request for Info Re Emergency Operation Facility.Permanent Backup Facility Presently Available + (15:16:27, 16 December 2024)
- TXX-3596, Responds to 821202 Request Re Generic Ltr 81-10, Emergency Operations Facility Survey. Emergency Operations Facility Const Completed Aug 1982.Protection Factor Upgraded. Equipment Will Be Installed Prior to Fuel Load + (15:16:27, 16 December 2024)
- 05000361/LER-1982-128-03, /03L-0:on 821021,while in Mode 2,control Element Assembly Slipped & Dropped in Excess of 7 Inches.Caused by Slow Operation of Grippers.Gripper Actuation Voltage & Duration of Application Increased.Sys Tested Successfully + (15:16:29, 16 December 2024)
- ML20069P179 + (15:16:30, 16 December 2024)
- 05000361/LER-1982-132-03, /03L-0:on 821023,during Turbine Generator Voltage Regulator Testing,Turbine Stop Valve 2UV-2200E Failed to Close.Caused by Faulty electro-hydraulic servo-mechanism Which Controls Valve Actuation.Assembly Replaced + (15:16:31, 16 December 2024)
- 05000361/LER-1982-128, Forwards LER 82-128/03L-0.Detailed Event Analysis Submitted + (15:16:32, 16 December 2024)
- 05000361/LER-1982-132, Forwards LER 82-132/03L-0.Detailed Event Analysis Submitted + (15:16:33, 16 December 2024)
- ML20069P160 + (15:16:34, 16 December 2024)
- 05000361/LER-1982-140-03, /03L-0:on 821025,mismatch in Power Indication Found Between Channel B & Channels A,C & D Indicating Circuitry Failure Associated W/Channel B Calculation.Caused by Gain Drifting in Linear Amplifier.Board Replaced + (15:16:37, 16 December 2024)
- 05000361/LER-1982-140, Forwards LER 82-140/03L-0.Detailed Event Analysis Submitted + (15:16:39, 16 December 2024)
- ML20069P139 + (15:16:39, 16 December 2024)
- ML20069P132 + (15:16:40, 16 December 2024)
- 05000361/LER-1982-138-01, /01T-0:on 821109,during Momentary Loss of Power to Feedwater Control Sys,Reactor Manually Tripped & ECCS Automatically Initiated.Caused by Dislodging of Power Cord. Control Cabinets Secured W/Tie Wraps & Training Updated + (15:16:42, 16 December 2024)
- ML20069P124 + (15:16:43, 16 December 2024)
- 05000336/LER-1994-015-01, :on 940519,revealed Automatic Auxiliary Feedwater Initiation Control Circuit Does Not Meet Single Failure Criterion Due to Inadequate Interface of Design & Equipment Condition.Design Change Evaluated + (15:16:44, 16 December 2024)
- ML20069P116 + (15:16:45, 16 December 2024)
- 05000361/LER-1982-138, Forwards LER 82-138/01T-0.Detailed Event Analysis Submitted + (15:16:46, 16 December 2024)
- ML20069P106 + (15:16:46, 16 December 2024)
- ML20069P068 + (15:16:47, 16 December 2024)
- 05000361/LER-1982-141-03, /03L-0:on 821027,during Mode 2,condensate Storage Tank T-120 Water Fell Below Tech Spec Limit.Caused by Inadequate Makeup Water Control to Tank Due to Misalignment of Valves.Engineering Evaluation Underway + (15:16:49, 16 December 2024)
- 05000361/LER-1982-141, Forwards LER 82-141/03L-0.Detailed Event Analysis Submitted + (15:16:50, 16 December 2024)
- ML20069P035 + (15:16:50, 16 December 2024)
- ML20069P011 + (15:16:51, 16 December 2024)
- ML20069P033 + (15:16:51, 16 December 2024)
- ML20069P010 + (15:16:52, 16 December 2024)
- 05000361/LER-1982-134-03, /03L-0:on 821024,during Mode 1,containment Airborne Monitor 2RT-7804-1 Failed to Meet Surveillance Requirements of Tech Specs.Caused by Instrument Drift in Sample Pump Flow Controller.Controller Adjusted + (15:16:57, 16 December 2024)
- 05000361/LER-1982-134, Forwards LER 82-134/03L-0.Detailed Event Analysis Submitted + (15:16:58, 16 December 2024)
- ML20069N999 + (15:16:58, 16 December 2024)
- ML20069N989 + (15:16:59, 16 December 2024)
- 05000361/LER-1982-133-03, /03L-0:on 821021,during Mode 2,hot Leg Sample Isolation Valve 2HV-0509 Observed W/Simultaneous Open & Closed Position Indication When Actually Closed.Caused by Loose Actuator Bar on Limit Switch Assembly.Bar Tightened + (15:17:01, 16 December 2024)
- 0CAN118225, Forwards Summary of Analysis of Pressurizer Safety & Relief Valve Discharge Piping,As Required by NUREG-0737,Item II.D.1.Piping Stresses & Support Loads Do Not Meet Code, However,Piping & Valves Will Remain Operable + (15:17:01, 16 December 2024)
- 05000361/LER-1982-133, Forwards LER 82-133/03L-0.Detailed Event Analysis Submitted + (15:17:02, 16 December 2024)
- 05000361/LER-1982-137, Forwards LER 82-137/03L-0.Detailed Event Analysis Submitted + (15:17:03, 16 December 2024)
- ML20069N957 + (15:17:03, 16 December 2024)
- ML20069N950 + (15:17:04, 16 December 2024)