Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20070A561 + (15:08:56, 16 December 2024)
- ML20070A560 + (15:08:56, 16 December 2024)
- ML20070A559 + (15:08:57, 16 December 2024)
- NRC-91-0002, Monthly Operating Rept for Fermi 2 for Dec 1990 + (15:08:57, 16 December 2024)
- LIC-94-0141, Discusses Investigation Re 940422 Discrepancy in Potentiometer & Attachable Switches + (15:08:58, 16 December 2024)
- AECM-82-424, Responds to NRC Re Violation Noted in IE Insp Rept 50-416/82-58-02.Corrective actions:10CFR50.59 Safety Evaluation of Chem-Nuclear Solidification Sys Performed & Personnel Instructed to Perform Evaluation Prior to Mod + (15:09:06, 16 December 2024)
- 1CAN019106, Monthly Operating Rept for Dec 1990 for a Arkansas Nuclear One Unit 1 + (15:09:06, 16 December 2024)
- BSEP-82-2365, Responds to NRC Re Violations Noted in IE Insp Repts 50-324/82-37 & 50-325/82-37.Corrective Actions:Eight Addl Spare Cylinders Purchased & Weekly Review to Be Conducted to Ensure Fire Brigade Training Current + (15:09:07, 16 December 2024)
- PY-CEI-NRR-1289, Monthly Operating Rept for Perry Nuclear Power Plant Unit 1 for Dec 1990 + (15:09:07, 16 December 2024)
- ML20070A545 + (15:09:08, 16 December 2024)
- ML20070A543 + (15:09:09, 16 December 2024)
- 05000339/LER-1982-013-03, During Periodic Surveillance Test,One Diesel Generator & One Offsite Power Supply for Emergency Bus 2H Became Temporarily Inoperable. Caused by Deficiency in Procedure.Periodic Test Changed + (15:09:11, 16 December 2024)
- ML20070A539 + (15:09:12, 16 December 2024)
- ML20070A529 + (15:09:13, 16 December 2024)
- ML20070A535 + (15:09:13, 16 December 2024)
- RBG-34337, Monthly Operating Rept for Dec 1990 for River Bend Station, Unit 1 + (15:09:14, 16 December 2024)
- ML20070A525 + (15:09:14, 16 December 2024)
- ML20070A521 + (15:09:15, 16 December 2024)
- ML20070A518 + (15:09:16, 16 December 2024)
- 05000499/LER-1994-002-02, :on 940302,Piston 4R Was Discovered Damaged During Insp Due to Piston Failure Foreign Material or Trapped Wear Particles Between Piston & Liner.Piston & Cylinder Liner for Cylinder 4R Were Replaced + (15:09:20, 16 December 2024)
- ML20070A458 + (15:09:25, 16 December 2024)
- ML20070A422 + (15:09:27, 16 December 2024)
- RBG-40684, Responds to NRC Re Violations Noted in Insp Rept 50-458/94-10.Corrective actions:re-examined Two Welds + (15:09:30, 16 December 2024)
- 05000395/LER-1982-036-03, /03L-0:on 821103,plant Entered Mode 3 W/Control Room Evacuation Panel Pressurizer Relief Tank Level Indicator LI-470A Inoperable.Caused by Level Transmitter Being Out of Calibr.Transmitter Calibr + (15:09:32, 16 December 2024)
- 05000416/LER-1994-006-02, :on 940528,scram Time Testing of Control Rods, Plant Personnel Identified That Scram Times for Two Control Rods Were Not Acceptable.Caused by Defect in Seating Material.Rods Were Retested & Returned to Svc + (15:09:34, 16 December 2024)
- ML20070A402 + (15:09:35, 16 December 2024)
- 05000366/LER-1982-123, Forwards LER 82-123/03L-0 + (15:09:36, 16 December 2024)
- 05000395/LER-1982-036, Forwards LER 82-036/03L-0.Detailed Event Analysis Encl + (15:09:36, 16 December 2024)
- ST-HL-AE-4819, Forwards Summary File for Pressurized Thermal Shock for Entry Into Reactor Vessel Integrity Database,In Response to Rev 1 to GL 92-01 + (15:09:37, 16 December 2024)
- ML20070A369 + (15:09:38, 16 December 2024)
- ML20070A371 + (15:09:38, 16 December 2024)
- ML20070A366 + (15:09:39, 16 December 2024)
- ML20070A364 + (15:09:39, 16 December 2024)
- L-94-141, Forwards Response to Concerns Identified in NRC Re Operational Safeguards Response Evaluation Conducted at Facilities on 940110-13 + (15:09:40, 16 December 2024)
- ML20070A363 + (15:09:40, 16 December 2024)
- NRC-94-4177, Informs That Licensees Review Indicates That Requests for Addl Info on AP600 Contains No Info Westinghouse Considers Proprietary + (15:09:41, 16 December 2024)
- ML20070A356 + (15:09:41, 16 December 2024)
- ML20070A343 + (15:09:42, 16 December 2024)
- ML20070A350 + (15:09:42, 16 December 2024)
- ML20070A336 + (15:09:43, 16 December 2024)
- 05000287/LER-1982-012-01, /01T-0:on 821117,steam Generator Tube Leak of 0.5 Gpm Indicated by Condensate Steam Air Ejector Offgas Radiation Monitor.Caused by Cracks in Tubes 65-1,68-4,78-4, 78-8 & 83-5.Tubes Removed from Svc for Lab Analysis + (15:09:47, 16 December 2024)
- 05000287/LER-1982-012, Forwards LER 82-012/01T-0.Detailed Event Analysis Encl + (15:09:48, 16 December 2024)
- ML20070A290 + (15:09:49, 16 December 2024)
- 05000321/LER-1982-085-03, /03L-0:on 821103,walkdown of TIP Withdrawal LSFT Logic Relay Wiring Revealed Two Wires Installed Onto Wrong Relay.Caused by Incorrect Relay Connection Diagram.Wires Will Be Terminated to Correct Terminal Relays + (15:09:51, 16 December 2024)
- ML20070A277 + (15:09:52, 16 December 2024)
- ML20070A282 + (15:09:52, 16 December 2024)
- 05000321/LER-1982-085, Forwards LER 82-085/03L-0 + (15:09:53, 16 December 2024)
- NG-94-2047, Responds to NRC Bulletin 93-002,suppl 1, Debris Plugging of ECCS Strainers + (15:09:53, 16 December 2024)
- ML20070A248 + (15:09:54, 16 December 2024)
- W3P82-3850, Confirms 821202 Telcon Re 820128 Response to Generic Ltr 81-10 Re Permanent Backup & Interim Emergency Operations Facilities (Eof).Interim EOF Approved in NRC + (15:09:58, 16 December 2024)
- ML20070A242 + (15:09:58, 16 December 2024)
- ML20070A224 + (15:09:59, 16 December 2024)