Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- 05000260/LER-1982-038, Forwards LER 82-038/03L-0 + (14:26:20, 16 December 2024)
- ML20070L682 + (14:26:20, 16 December 2024)
- ML20070L680 + (14:26:21, 16 December 2024)
- 05000366/LER-1991-005-01, :on 910224,reactor Scrammed on APRM High Flux. Caused by Personnel Error.Personnel Counseled & Positioner on Valve 2N21-F165 Replaced + (14:26:22, 16 December 2024)
- ML20070L677 + (14:26:24, 16 December 2024)
- ML20070L676 + (14:26:24, 16 December 2024)
- ML20070L673 + (14:26:28, 16 December 2024)
- 05000328/LER-1982-134-03, /03L-0:on 821124,while in Mode 5,refueling Water Storage Tank Level Channel LT-63-52 Declared Inoperable Due to Failure to Meet Surveillance Requirements.Caused by Transmitter Drift.Loop Recalibr & Returned to Svc + (14:26:30, 16 December 2024)
- ML20070L668 + (14:26:31, 16 December 2024)
- ML20070L667 + (14:26:31, 16 December 2024)
- 05000328/LER-1982-134, Forwards LER 82-134/03L-0 + (14:26:34, 16 December 2024)
- ML20070L661 + (14:26:35, 16 December 2024)
- ML20070L652 + (14:26:36, 16 December 2024)
- 05000362/LER-1982-002-03, /03L-0:on 821119,during Fuel Loading Operations, Water Observed Leaking Through Equipment Hatch Seal Into Containment.Caused by Existing Gap Around Perimeter of Hatch.Bolts Retightened + (14:26:37, 16 December 2024)
- 05000362/LER-1982-002, Forwards LER 82-002/03L-0.Detailed Event Analysis Submitted + (14:26:39, 16 December 2024)
- ML20070L632 + (14:26:40, 16 December 2024)
- ML20070L633 + (14:26:40, 16 December 2024)
- ML20070L631 + (14:26:41, 16 December 2024)
- ML20070L629 + (14:26:41, 16 December 2024)
- ML20070L628 + (14:26:42, 16 December 2024)
- ML20070L596 + (14:26:46, 16 December 2024)
- 05000361/LER-1982-146-03, /03L-0:on 821116,while in Mode 1,auxiliary Feedwater Pump 2P-140 Declared Inoperable.Caused by Loosening of Switch Assembly 2ZL4705-2 from Valve Stem. Switch Assembly Realigned & Tightened + (14:26:47, 16 December 2024)
- 05000361/LER-1982-146, Forwards LER 82-146/03L-0.Detailed Event Analysis Submitted + (14:26:48, 16 December 2024)
- ML20070L588 + (14:26:49, 16 December 2024)
- 05000361/LER-1982-144-03, /03L-0:on 821111,control Element Assembly (CEA) 68 Slipped & Dropped 19 Inches & CEA 87 Slipped Into Fully Inserted Position.Caused by Overheating of CEA Mechanism Control Sys Due to Const Activities + (14:26:50, 16 December 2024)
- 05000361/LER-1982-144, Forwards LER 82-144/03L-0.Detailed Event Analysis Submitted + (14:26:51, 16 December 2024)
- 05000361/LER-1982-136-01, /01T-0:on 821109,while in Mode 1,momentary Loss of Power of Feedwater Control Sys Experienced.Caused by Inadvertent Dislodging of Power Cord.Reactor Manual Trip Initiated + (14:26:53, 16 December 2024)
- 05000361/LER-1982-136, Forwards LER 82-136/01T-0.Detailed Event Analysis Submitted + (14:26:54, 16 December 2024)
- ML20070L570 + (14:26:54, 16 December 2024)
- 05000361/LER-1982-160-01, /01T-0:on 821201,while in Mode 1,temporary Mod in Turbine Bldg Sump Water Flow Path Rendered Radiation Monitor 2RT-7821 Inoperable.Caused by Administrative Failure. Instructions Given to Operators + (14:26:56, 16 December 2024)
- ML20070L560 + (14:26:57, 16 December 2024)
- ML20070L557 + (14:26:57, 16 December 2024)
- 05000361/LER-1982-160, Forwards LER 82-160/01T-0.Detailed Event Analysis Submitted + (14:26:58, 16 December 2024)
- ML20070L550 + (14:26:58, 16 December 2024)
- ML20070L547 + (14:26:59, 16 December 2024)
- ML20070L549 + (14:26:59, 16 December 2024)
- ML20070L543 + (14:27:00, 16 December 2024)
- ML20070L545 + (14:27:00, 16 December 2024)
- ML20070L541 + (14:27:01, 16 December 2024)
- ML20070L539 + (14:27:02, 16 December 2024)
- ML20070L534 + (14:27:04, 16 December 2024)
- 05000311/LER-1982-141-03, /03L-0:on 821121 & 1204,RCS Subcooling Monitor Declared Inoperable.Caused by Parity Error in R-250 Computer Due to Insufficient Ventilation.Computer Reprogrammed & Temporary Fan Installed + (14:27:06, 16 December 2024)
- 05000361/LER-1982-156-03, /03L-0:on 821130,review of Operational Surveillance Records Revealed That RCS Water Inventory Balance Due 821128 Had Been Missed Contrary to Tech Spec. Caused by Unstable Plant Conditions + (14:27:11, 16 December 2024)
- 05000361/LER-1982-145-03, /03L-0:on 821115,review of Operational Surveillance Records Revealed That RCS Water Inventory Balance Had Not Been Performed in 157 H Per Tech Spec.Caused by Unstable Plant condition.Sign-off Sys Initiated + (14:27:13, 16 December 2024)
- W3P82-4063, Advises of Need to Reanalyze Limiting Large Break LOCA Re Containment Purge Data & Safety Injection Tank Flow Testing. C-E ECCS Evaluation Flow Blockage Model Used to Perform Reanalysis.Draft Analysis Results Expected by 830304 + (14:27:14, 16 December 2024)
- ML20070L510 + (14:27:14, 16 December 2024)
- ML20070L508 + (14:27:15, 16 December 2024)
- ML20070L506 + (14:27:15, 16 December 2024)
- ML20070L498 + (14:27:16, 16 December 2024)
- ML20070L499 + (14:27:16, 16 December 2024)
- ML20070L492 + (14:27:17, 16 December 2024)