Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20070W130 + (13:55:06, 16 December 2024)
- ML20070W125 + (13:55:07, 16 December 2024)
- 05000316/LER-1983-011-03, /03L-0:on 830108,pressurizer PORV NRV-152 Drifted Closed & NRV-153 Drifted Part Way Closed.Caused by Low Pressure on Outlet of Emergency Air Regulators.Regulators Adjusted & Evaluation of PORV Emergency Air Initiated + (13:55:08, 16 December 2024)
- 05000387/LER-1983-008-03, /03L-0:on 830107,during Startup Test Program,Both Control Structure Chlorine Detectors Declared Inoperable Due to Failure of Constant Drip Feature.Caused by Contaminated Wick.Wick Replaced + (13:55:10, 16 December 2024)
- 05000316/LER-1983-011, Forwards LER 83-011/03L-0 + (13:55:12, 16 December 2024)
- ML20070W106 + (13:55:12, 16 December 2024)
- 05000387/LER-1983-008, Forwards LER 83-008/03L-0 + (13:55:13, 16 December 2024)
- ML20070W099 + (13:55:13, 16 December 2024)
- ML20070W091 + (13:55:18, 16 December 2024)
- ML20070W088 + (13:55:19, 16 December 2024)
- ML20070W085 + (13:55:19, 16 December 2024)
- ML20070W083 + (13:55:20, 16 December 2024)
- ML20070W082 + (13:55:20, 16 December 2024)
- ML20070W062 + (13:55:23, 16 December 2024)
- ML20070W067 + (13:55:23, 16 December 2024)
- PLA-1527, Forwards Change B to Security Training & Qualification Plan. Change Withheld (Ref 10CFR2.790) + (13:55:27, 16 December 2024)
- ML20070W051 + (13:55:28, 16 December 2024)
- ML20070W054 + (13:55:28, 16 December 2024)
- PLA-1500, Suppl to Final Deficiency Rept Re Vertically Installed Anchor-Darling Check Valves.Satisfactory Testing Completed on 10 of 12 Valves + (13:55:29, 16 December 2024)
- 05000368/LER-1991-009, :on 910311,containment Ventilation Sys Effluent Pathway Not Being Monitored for Particulate & Iodine Activity Due to Personnel Error.Disciplinary Action Taken Against Responsible Individual + (13:55:31, 16 December 2024)
- ML20070W042 + (13:55:32, 16 December 2024)
- ML20070W037 + (13:55:33, 16 December 2024)
- 05000361/LER-1983-005-03, /03L-0:on 830109,failure of Core Protection Calculator Channel D Indicated by Lights on Channel D DNBR Trip & Linear Power Density Trip & Alarm.Cause Unknown. Channel D Returned to Svc + (13:55:35, 16 December 2024)
- ML20070W032 + (13:55:36, 16 December 2024)
- 05000316/LER-1983-016-03, /03L-0:on 830113,several Valves Exhibited Excessive Leakage Causing Total Leak Rate to Exceed Limit. Caused by Dirt & Scale Deposits on Seating Surfaces & Erosion of Valve Seats.Valves Cleaned & Components Replaced + (13:55:38, 16 December 2024)
- 05000361/LER-1983-005, Forwards LER 83-005/03L-0.Detailed Event Analysis Submitted + (13:55:39, 16 December 2024)
- ML20070W023 + (13:55:40, 16 December 2024)
- ML20070W027 + (13:55:40, 16 December 2024)
- 05000361/LER-1983-012-03, /03L-0:on 830108,emergency Chiller E-336 Failed to Start & Declared Inoperable.Caused by Faulty Program Timer.Timer Replaced + (13:55:42, 16 December 2024)
- ML20070W019 + (13:55:43, 16 December 2024)
- ML20070W016 + (13:55:44, 16 December 2024)
- ML20070W014 + (13:55:44, 16 December 2024)
- 05000361/LER-1983-012, Forwards LER 83-012/03L-0.Detailed Event Analysis Submitted + (13:55:45, 16 December 2024)
- 05000316/LER-1983-015-03, /03L-0:on 830113,contractor Personnel within Reactor Cable Tunnel Area W/O Required Number of Fire Watches.Area Vacated Until Proper Number of Fire Watches Established.Procedure Requirements Reviewed + (13:55:47, 16 December 2024)
- 05000316/LER-1983-015, Forwards LER 83-015/03L-0 & 83-016/03L-0 + (13:55:48, 16 December 2024)
- ML20070W002 + (13:55:48, 16 December 2024)
- ML20070W001 + (13:55:49, 16 December 2024)
- ML20070V996 + (13:55:49, 16 December 2024)
- 0CAN028313, Requests That 830216 Appeal Meeting Be Rescheduled,Since NRC Handling of Partial Suppression Sys as Generic Issue Does Not Relieve Utils of Having to Address Issue on Individual Basis.Fire Protection Remains Highest Priority + (13:55:50, 16 December 2024)
- ML20070V990 + (13:55:50, 16 December 2024)
- 0CAN049105, Provides Historical Info Re Fitness for Duty Actions & Drug Testing Statistics for Four Previous Years + (13:55:54, 16 December 2024)
- ML20070V980 + (13:55:54, 16 December 2024)
- B13790, Forwards Engineering Evaluation of 910323 Overpressurization Event.Util Concludes That Integrity of Affected Components Was Not Compromised + (13:55:55, 16 December 2024)
- 05000266/LER-1983-001-03, /03L-0:on 830104,during Normal Operation,Panel D-400 Became Inoperable.Caused by Failed Power Supply.Power Supply Replaced W/Upgraded Components + (13:55:57, 16 December 2024)
- ML20070V949 + (13:56:01, 16 December 2024)
- 05000266/LER-1983-001, Forwards LER 83-001/03L-0 + (13:56:02, 16 December 2024)
- ML20070V947 + (13:56:02, 16 December 2024)
- PLA-1509, Final Deficiency Rept Re Inadequate Restraint Provided by Pipe Friction Clamp Anchors.Initially Reported on 820723. Drawings Revised & Previously Accepted Friction Clamps to Be Reinspected & Reworked.Also Reported Per Part 21 + (13:56:03, 16 December 2024)
- ML20070V917 + (13:56:03, 16 December 2024)
- ML20070V901 + (13:56:04, 16 December 2024)
- 05000275/LER-1983-001-03, /03L-0:on 830107,during Recorder Check Prior to Fuel Load,Steam Generator Blowdown Multipoint Flow Recorder 1-71 Discovered Inoperable.Caused by Broken Print Head Drive String.String Replaced + (13:56:05, 16 December 2024)