Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML051660133 + (23:16:08, 15 January 2025)
- ML051660089 + (23:16:12, 15 January 2025)
- ML051660081 + (23:16:13, 15 January 2025)
- ML051660075 + (23:16:14, 15 January 2025)
- ML051660078 + (23:16:14, 15 January 2025)
- ML051660073 + (23:16:15, 15 January 2025)
- ML051660069 + (23:16:16, 15 January 2025)
- ML051660071 + (23:16:16, 15 January 2025)
- IR 05000346/2005004 + (23:16:23, 15 January 2025)
- ML051660042 + (23:16:24, 15 January 2025)
- ML051650511 + (23:16:25, 15 January 2025)
- ML051650556 + (23:16:25, 15 January 2025)
- ML051650505 + (23:16:26, 15 January 2025)
- ML051650462 + (23:16:27, 15 January 2025)
- ML051650473 + (23:16:27, 15 January 2025)
- ML051650449 + (23:16:28, 15 January 2025)
- ML051650406 + (23:16:32, 15 January 2025)
- ML051650421 + (23:16:32, 15 January 2025)
- ML051650371 + (23:16:33, 15 January 2025)
- 05000255/LER-2005-004, Regarding Fuel Handling Area Ventilation System Not Properly Aligned During Movement of Irradiated Fuel Assemblies + (23:16:36, 15 January 2025)
- 3F0605-03, Service List Update and Signature Authorization + (23:16:37, 15 January 2025)
- 05000311/LER-2005-002, Regarding Reactor Coolant Instrument Line Through-Wall Leak + (23:16:40, 15 January 2025)
- ML051650338 + (23:16:40, 15 January 2025)
- ML051650335 + (23:16:41, 15 January 2025)
- ML051650324 + (23:16:42, 15 January 2025)
- GO2-05-099, License Amendment Request to Technical Specifications Associated with AC and DC Electrical Power + (23:16:44, 15 January 2025)
- L-PI-05-054, Unit 2 Steam Generator Inspection Results - 15-Day Report + (23:16:45, 15 January 2025)
- ML051650308 + (23:16:46, 15 January 2025)
- ML051650307 + (23:16:47, 15 January 2025)
- NRC 2005-0070, Response to Request for Additional Information Regarding Request for Exigent Review of Heavy Load Analysis + (23:16:47, 15 January 2025)
- ML051650293 + (23:16:48, 15 January 2025)
- ML051650291 + (23:16:49, 15 January 2025)
- 05000254/LER-2005-003, Re Three Main Steam Safety Valves Outside of Technical Specification Allowed Tolerance + (23:16:52, 15 January 2025)
- ML051650282 + (23:16:53, 15 January 2025)
- VPN-020-200, PGE-1061, Trojan Nuclear Plant Defueled Safety Analysis Report and License Termination Plan (PGE-1078), Revision 22, and Subsequent Deletion as an Active Topical Report and Licensing Basis Document + (23:16:53, 15 January 2025)
- ML051650278 + (23:16:55, 15 January 2025)
- ML051650273 + (23:16:56, 15 January 2025)
- ML051650266 + (23:16:57, 15 January 2025)
- BVY 05-059, Revised Response to Request for Additional Information Regarding Relief Request RI-01 + (23:17:00, 15 January 2025)
- ML051650258 + (23:17:01, 15 January 2025)
- 05000336/LER-2005-002, Re Reactor Coolant System Pressure Boundary Leakage from PWSCC in a Pressurizer Heater Sleeve + (23:17:04, 15 January 2025)
- 05000324/LER-2005-002, Re Automatic Shutdown Due to Condensate System Transient + (23:17:07, 15 January 2025)
- 05000324/LER-2005-001, Re Operation Prohibited by Technical Specification -Inoperable Feedwater and Main Turbine High Water Level Trip + (23:17:09, 15 January 2025)
- 05000388/LER-2005-002, Re Degraded 125 Vdc Battery Charger Results in Technical Specification Required Shutdown + (23:17:12, 15 January 2025)
- ML051650234 + (23:17:13, 15 January 2025)
- ML051650190 + (23:17:14, 15 January 2025)
- ML051650191 + (23:17:14, 15 January 2025)
- 05000306/LER-2005-002, Praised Island, Unit 2 Regarding Unit 2 Shutdown Required by Technical Specifications Due to Inoperable Emergency Diesel Generator + (23:17:18, 15 January 2025)
- ML051650170 + (23:17:19, 15 January 2025)
- RC-05-0088, Virgil C Summer, Operating License - 2004 Annual Financial Reports + (23:17:20, 15 January 2025)
- ML051650157 + (23:17:21, 15 January 2025)