Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20071K453 + (11:21:09, 15 December 2024)
- ML20071K446 + (11:21:10, 15 December 2024)
- 05000325/LER-1982-057, Forwards LER 82-057/03L-0 + (11:21:11, 15 December 2024)
- ML20071K430 + (11:21:11, 15 December 2024)
- ML20071K422 + (11:21:12, 15 December 2024)
- ML20071K411 + (11:21:13, 15 December 2024)
- ML20071K407 + (11:21:13, 15 December 2024)
- ML20071K392 + (11:21:15, 15 December 2024)
- 05000369/LER-1982-048-03, /03L-0:on 820605,after Receiving Battery Evcd Trouble Alarm,No Indication Received on Pressurized Power Operated Relief Valve NC-32 & Valve Not Operable.Caused by Ground Which Blew Fuse.Valve Repaired + (11:21:19, 15 December 2024)
- 05000325/LER-1982-074-03, /03L-0:on 820623,electrolyte Level in Pilot Cell of Div II Battery 1B-1 Found Higher than Max Level Mark on Cell.Caused by Battery Room Ambient Temp Increase Following Filling to Max Level Mark + (11:21:24, 15 December 2024)
- 05000369/LER-1982-048, Forwards LER 82-048/03L-0 + (11:21:25, 15 December 2024)
- ML20071K376 + (11:21:26, 15 December 2024)
- ML20071K372 + (11:21:26, 15 December 2024)
- ML20071K370 + (11:21:27, 15 December 2024)
- 05000325/LER-1982-074, Forwards LER 82-074/03L-0 + (11:21:28, 15 December 2024)
- 05000369/LER-1982-056-01, /01T-0:on 820705,during Shutdown for Steam Generator Insp,Sleeves for Reactor Coolant Loop B Found Not in Place.Caused by Welds Failing to Interface to Nozzle Wall.Loose Parts Monitoring Sys Installed + (11:21:29, 15 December 2024)
- ML20071K363 + (11:21:30, 15 December 2024)
- RC-94-0191, Forwards Rev of TS Page 3/4 3-56,encl in 931217 Submittal of TS Change TSP 930011,correcting Required Action to Restore One Inoperable Hydrogen Monitor Channel to Operable Status, W/Less than Min Number of Channels Operable + (11:21:34, 15 December 2024)
- LD-94-054, Forwards Errata to Sys 80+ Certified Design Matl,In Response to Editorial & Word Processing Errors + (11:21:35, 15 December 2024)
- 05000327/LER-1982-080, Forwards LER 82-080/01T-0 + (11:21:36, 15 December 2024)
- ML20071K347 + (11:21:36, 15 December 2024)
- 05000369/LER-1982-056, Forwards LER 82-056/01T-0 + (11:21:37, 15 December 2024)
- ML20071K341 + (11:21:37, 15 December 2024)
- 05000348/LER-1980-058, Submits Description of Actions Taken Subsequent to Initial 3-yr Containment post-tensioning Sys Testing & Insp,Per LER 80-058/03L-1.Sys Is Performing Design Function W/Margin of Safety,Therefore No Addl Action Necessary + (11:21:38, 15 December 2024)
- NRC-94-4208, Provides Advance Reactor Corp Technical Core Group Rept on Piping Initiatives,App G,Piping Design/Analyst Users Guide + (11:21:39, 15 December 2024)
- 05000416/LER-1982-006-01, /01T-0:on 820709,violation of Tech Spec 4.7.8 Identified Re Temp Monitoring of Specific safety-related Areas Every 12-h.Caused by Procedural Inadequacy & Personnel Error Re Operating Log Requiring Recording Once Every 24-h + (11:21:41, 15 December 2024)
- 05000416/LER-1982-006, Forwards LER 82-006/01T-0 + (11:21:42, 15 December 2024)
- ML20071K319 + (11:21:42, 15 December 2024)
- ML20071K313 + (11:21:43, 15 December 2024)
- ML20071K304 + (11:21:44, 15 December 2024)
- ML20071K300 + (11:21:44, 15 December 2024)
- ML20071K277 + (11:21:45, 15 December 2024)
- ML20071K263 + (11:21:45, 15 December 2024)
- ML20071K255 + (11:21:46, 15 December 2024)
- ML20071K195 + (11:21:46, 15 December 2024)
- BSEP-83-1207, Responds to NRC Re Violations Noted in IE Insp Repts 50-324/83-07 & 50-325/83-07.Corrective Actions: Procedure Revised & Accepted by QA Reflecting Actual Testing Method & Contractor Personnel Counseled + (11:21:47, 15 December 2024)
- PLA-1673, Forwards Response to Enforcement Action 83-26 & Payment of Civil Penalty.Supervisor of Operations Conducted Training Sessions W/Each Shift to Ensure All Significant Aspects of Event Understood + (11:21:47, 15 December 2024)
- ML20071K168 + (11:21:48, 15 December 2024)
- ML20071K159 + (11:21:48, 15 December 2024)
- 05000275/LER-1983-003-03, /03L-0:on 830414,control Operator Unable to Achieve Satisfactory Check Source Reading on Liquid Radwaste Discharge Line Radiation Monitor (RE-18).Caused by Missing Check Source from Monitoring Mechanism + (11:21:50, 15 December 2024)
- 05000244/LER-1982-009-03, /03L-0:on 820320,safeguard Bus 17 Was Out of Svc for More than 7 Days Due to Installation of New Undervoltage Sys on Buses 16 & 17.Buses Returned to Svc on 820326 & Motor Driven Fire Pump Returned to Operable Status + (11:21:52, 15 December 2024)
- ML20071K154 + (11:21:53, 15 December 2024)
- ML20071K152 + (11:21:54, 15 December 2024)
- ML20071K153 + (11:21:54, 15 December 2024)
- 05000244/LER-1982-009, Forwards LER 82-009/03L-0 + (11:21:55, 15 December 2024)
- ML20071K129 + (11:21:58, 15 December 2024)
- ML20071K123 + (11:21:59, 15 December 2024)
- ML20071K116 + (11:22:03, 15 December 2024)
- ML20071K114 + (11:22:03, 15 December 2024)
- ML20071K102 + (11:22:07, 15 December 2024)
- 05000316/LER-1983-044-03, /03L-0:on 830421,20 Psig Difference Between Pressurizer Pressure Channels Existed.Caused by Pressure Transmitters for NPP-152 & 153 Drifting.Transmitters Satisfactorily Calibr + (11:22:09, 15 December 2024)
- ML20071K093 + (11:22:10, 15 December 2024)