Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- 0CAN048302, Forwards Addl Clarification Re Spent Fuel Pool Cooling Sys. Revised Pages 6 & 7 of Attachment to Util Encl + (09:16:47, 15 December 2024)
- ML20072T713 + (09:16:51, 15 December 2024)
- ML20072T719 + (09:16:51, 15 December 2024)
- ML20072T703 + (09:16:52, 15 December 2024)
- BECO-94-094, Provides Semiannual long-term Program Udate in Accordance W/ Section V.A of Plan for Long Term Program - Pilgrim Nuclear Power Plant, Reflecting Completion of GL 88-20,Suppl Item & Scheduled Revs for Physical Security Improvements + (09:16:53, 15 December 2024)
- ML20072T701 + (09:16:53, 15 December 2024)
- ML20072T697 + (09:16:54, 15 December 2024)
- ML20072T692 + (09:16:55, 15 December 2024)
- ML20072T695 + (09:16:55, 15 December 2024)
- ML20072T691 + (09:16:56, 15 December 2024)
- ML20072T683 + (09:16:57, 15 December 2024)
- ML20072T679 + (09:16:58, 15 December 2024)
- ML20072T674 + (09:16:59, 15 December 2024)
- ML20072T673 + (09:16:59, 15 December 2024)
- ML20072T668 + (09:17:00, 15 December 2024)
- ML20072T672 + (09:17:00, 15 December 2024)
- 05000335/LER-1983-013-03, /03L-0:on 830302,during Refueling Outage,Charging Sys Common Header Isolation Valve V2429 Tagged Closed to Facilitate Work on Seal Water Injection Sys to Reactor Coolant Pumps Resulting in Loss of Boration Flow Path + (09:17:02, 15 December 2024)
- ML20072T665 + (09:17:03, 15 December 2024)
- ML20072T662 + (09:17:03, 15 December 2024)
- ML20072T657 + (09:17:04, 15 December 2024)
- ML20072T649 + (09:17:05, 15 December 2024)
- RBG-34-747, Forwards Rev 1 to Sasr 91-16, Bounding Evaluation for River Bend 1 Heatup Rate Event. Describing 901130 Reactor Vessel Heatup of 119 F in 1 H Period + (09:17:05, 15 December 2024)
- 05000335/LER-1983-013, Forwards LER 83-013/03L-0 + (09:17:06, 15 December 2024)
- ML20072T644 + (09:17:06, 15 December 2024)
- ML20072T642 + (09:17:07, 15 December 2024)
- 05000289/LER-1983-005-01, /01T-0:on 830321,manual Sampling of Waste Gas Sys Revealed Concentration of 9%,exceeding 2% Tech Spec Limit. Caused by Maint Activities.Nitrogen Purge Initiated & Concentration Reduced in 9.5 H.Tech Spec Change Submitted + (09:17:09, 15 December 2024)
- 2CAN049109, Forwards Monthly Operating Rept for Mar 1991 for Arkansas Nuclear One Unit 2 & Corrected Repts for Aug & Sept 1990 + (09:17:10, 15 December 2024)
- ML20072T628 + (09:17:10, 15 December 2024)
- ML20072T620 + (09:17:11, 15 December 2024)
- ML20072T624 + (09:17:11, 15 December 2024)
- 05000289/LER-1983-005, Forwards LER 83-005/01T-0 + (09:17:12, 15 December 2024)
- 2CAN038314, Submits Proposed Course of Action to Address Generic Ltr 83-10B Re Item II.K.3.5, Reactor Coolant Pump Trip Criteria. Plan for Resolution Will Be Issued 3 Months Prior to Implementation of Emergency Operating Procedures + (09:17:12, 15 December 2024)
- ML20072T606 + (09:17:13, 15 December 2024)
- ML20072T583 + (09:17:14, 15 December 2024)
- 05000334/LER-1991-009, :on 910314,portion of Chemical & Vol Control Sys Piping Not Hydrostatically Tested in Accordance W/Asme Xi.Caused by Program Deficiency.Line Will Be Hydrostatically Tested During Current Insp Interval + (09:17:15, 15 December 2024)
- ML20072T577 + (09:17:16, 15 December 2024)
- ML20072T567 + (09:17:17, 15 December 2024)
- ML20072T569 + (09:17:17, 15 December 2024)
- ML20072T563 + (09:17:18, 15 December 2024)
- ML20072T566 + (09:17:18, 15 December 2024)
- 05000382/LER-1991-003-01, :on 861126,improper Testing of Main Steam Safety Valves Noted.Caused by Incorrect Vendor Supplied Data & Procedural Inadequacy.Procedure MM-007-015 Revised & Other Surveillance Procedures Reviewed + (09:17:20, 15 December 2024)
- ML20072T556 + (09:17:21, 15 December 2024)
- ML20072T555 + (09:17:22, 15 December 2024)
- ML20072T553 + (09:17:22, 15 December 2024)
- ML20072T549 + (09:17:23, 15 December 2024)
- ML20072T546 + (09:17:27, 15 December 2024)
- ML20072T541 + (09:17:28, 15 December 2024)
- ML20072T540 + (09:17:28, 15 December 2024)
- ST-HL-AE-3739, Special Rept:On 910402,during Low Power Physics Testing, Positive Moderator Temp Coefficient Measured.High Critical Boron Concentration in Reactor Coolant Sys at Beginning of 18 Month Fuel Cycle Caused Mtc to Be Positive + (09:17:29, 15 December 2024)
- BECO-91-052, Revised Application for Amend to License DPR-35,changing Tech Spec Re Reactor Coolant Leakage Detection Sys at Plant + (09:17:30, 15 December 2024)
- ML20072T534 + (09:17:30, 15 December 2024)
- NRC-94-4285, Forwards Proprietary Addl Info on AP600 Testing Being Performed at AP600 Low Pressure Integral Sys Test at or State Univ,In Support of Westinghouse Response to RAI 952.92.Info Withheld (Ref 10CFR9.17(a)(4)) + (09:17:31, 15 December 2024)