- ML20073B525 + (09:04:42, 15 December 2024)
- ML20073B519 + (09:04:43, 15 December 2024)
- ML20073B511 + (09:04:48, 15 December 2024)
- 05000412/LER-1994-009, :on 940812,unit 2 at 100% Power a RSS Pump Was Inoperable.Caused by Scaling of Flow Transmitters/ Indicators Were Not Matched to Characteristics of Flow Elements + (09:04:49, 15 December 2024)
- ML20073B507 + (09:04:50, 15 December 2024)
- 05000423/LER-1991-008, :on 910318,two Channels Inoperable Causing Pressurizer Level Indicator Errors.Caused by Inadequate Design.Design Change During Refueling Outage,Condensate Pots Removed & Proper Temp Measurements + (09:04:52, 15 December 2024)
- ML20073B504 + (09:04:53, 15 December 2024)
- ML20073B501 + (09:04:54, 15 December 2024)
- ML20073B500 + (09:04:54, 15 December 2024)
- ML20073B492 + (09:04:55, 15 December 2024)
- ML20073B479 + (09:04:56, 15 December 2024)
- ML20073B485 + (09:04:56, 15 December 2024)
- W3P83-1117, Forwards Addl Info to Be Included in FSAR Amend 32 Re Fuel Assembly Mod Necessary to Increase Shoulder Gap Spacing + (09:04:57, 15 December 2024)
- 05000321/LER-1991-008, :on 910321,channels Checks Not Performed within Frequency Required by Tech Spec.Caused by Inadequate Procedures.Procedures Revised + (09:04:59, 15 December 2024)
- ML20073B466 + (09:05:00, 15 December 2024)
- ML20073B464 + (09:05:01, 15 December 2024)
- 05000318/LER-1983-018-03, /03L-0:on 830303,high Pressure Safety Injection Header Relief Valve RV-417 Declared Inoperable When Evaluation Revealed Support Needed for Header Integrity During Seismic Event.Caused by Inadequate Work Package + (09:05:02, 15 December 2024)
- ML20073B458 + (09:05:03, 15 December 2024)
- ML20073B453 + (09:05:04, 15 December 2024)
- ML20073B452 + (09:05:04, 15 December 2024)
- 05000318/LER-1983-018, Forwards LER 83-018/03L-0 + (09:05:05, 15 December 2024)
- ML20073B446 + (09:05:05, 15 December 2024)
- ELV-02735, Forwards Nonproprietary & Proprietary Responses to NRC Request for Addl Info Re Sensitivity Factors for Application of Revised Thermal Design Procedure at Facility.Encl Withheld (Ref 10CFR2.790) + (09:05:06, 15 December 2024)
- ML20073B442 + (09:05:07, 15 December 2024)
- W3P83-1078, Informs That Description of C-E Owners Group Program & Schedule for Completion of plant-specific Activities Resolving NUREG-0737,Item II.K.3.5, Automatic Trip of Reactor Coolant Pumps, Will Be Provided by 830701 + (09:05:07, 15 December 2024)
- 05000373/LER-1983-020-03, /03L-0:on 830305,pressure Switches 1E31-N022A,B,C & D Setpoints Found Out of Tolerance.Cause of Setpoint Drift Undetermined.Switches Recalibr & Returned to Svc + (09:05:09, 15 December 2024)
- PY-CEI-NRR-1859, Monthly Operating Rept for Aug 1994 for Perry Unit 1 + (09:05:10, 15 December 2024)
- ML20073B429 + (09:05:10, 15 December 2024)
- 05000265/LER-1983-005-03, /03L-0:on 830316,while Performing Routine Reactor low-low Water Level Functional Test Procedure Q1S 11-2, Level Switch LIS-2-263-72C Failed to Operate.Caused by Misalignment of mercury-wetted Switch.Switch Realigned + (09:05:12, 15 December 2024)
- ML20073B419 + (09:05:13, 15 December 2024)
- ML20073B418 + (09:05:13, 15 December 2024)
- ML20073B416 + (09:05:14, 15 December 2024)
- ML20073B413 + (09:05:15, 15 December 2024)
- 05000265/LER-1983-005, Forwards LER 83-005/03L-0 + (09:05:16, 15 December 2024)
- NRC-94-4229, Forwards Proprietary Rev 0 to MT01-T2R-010, Quick Look Rept AP600 Core Makeup Tank (Cmt) Test Program - Series 100 Matrix Tests. Proprietary Rev 0 to MT01-T2R-010 Rept Withheld (Ref 10CFR2.790) + (09:05:17, 15 December 2024)
- ML20073B401 + (09:05:18, 15 December 2024)
- 05000373/LER-1983-020, Forwards LER 83-020/03L-0 + (09:05:19, 15 December 2024)
- ML20073B397 + (09:05:19, 15 December 2024)
- ML20073B394 + (09:05:20, 15 December 2024)
- ML20073B395 + (09:05:20, 15 December 2024)
- B14950, Informs NRC Staff That Commitment Made by Util Associated W/ Mnps Unit 2 to Replace X-182 HX Not Completed as Planned. Discusses Actions Util Taking + (09:05:21, 15 December 2024)
- ML20073B388 + (09:05:21, 15 December 2024)
- B14977, Requests Relief from ASME Code Section XI Requirements to Make Interim Noncode Repairs on Leak in SWS Piping Line 3SWP-150-072-3,consistent W/Gl 90-05 + (09:05:23, 15 December 2024)
- ML20073B387 + (09:05:23, 15 December 2024)
- ML20073B384 + (09:05:24, 15 December 2024)
- ML20073B373 + (09:05:25, 15 December 2024)
- ELV-02741, Responds to Violations Noted in Insp Repts 50-424/91-04 & 50-425/91-04 on 910218-22.Corrective Actions:Historical Review of Plant Management Info Sys Database Conducted & Emergency Response Facilities Reemphasized + (09:05:26, 15 December 2024)
- ML20073B359 + (09:05:28, 15 December 2024)
- ML20073B358 + (09:05:29, 15 December 2024)
- ML20073B354 + (09:05:30, 15 December 2024)
- ML20073B355 + (09:05:30, 15 December 2024)
- ML20073B350 + (09:05:31, 15 December 2024)