Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20073J305 + (08:40:58, 15 December 2024)
- ML20073J295 + (08:40:58, 15 December 2024)
- ML20073J286 + (08:40:59, 15 December 2024)
- SNRC-2185, Summarizes Results from Revised Exposure Pathway Analysis Using Corrected Dcf for External Exposure for Cs-137.Rev 1 to Analysis of Bulk Matl Reconcentration Potential & Possible Exposure Pathways Encl + (08:41:03, 15 December 2024)
- ML20073J275 + (08:41:04, 15 December 2024)
- ML20073J263 + (08:41:04, 15 December 2024)
- ML20073J262 + (08:41:05, 15 December 2024)
- ML20073J229 + (08:41:06, 15 December 2024)
- ML20073J237 + (08:41:06, 15 December 2024)
- ML20073J227 + (08:41:07, 15 December 2024)
- ML20073J214 + (08:41:13, 15 December 2024)
- AECM-83-0236, Interim Deficiency Rept PRD-83/07 Re Improperly Routed Div II Cables.Initially Reported on 830412.Also Reported Per Part 21 for Unit 1.Investigation in Progress to Determine Applicability to Unit 2.Final Rept Expected Prior to Heatup + (08:41:14, 15 December 2024)
- ML20073J213 + (08:41:14, 15 December 2024)
- ML20073J198 + (08:41:15, 15 December 2024)
- ML20073J181 + (08:41:21, 15 December 2024)
- ML20073J188 + (08:41:21, 15 December 2024)
- AECM-83-0237, RO 83-018/0:on 830307,fire Rated Doors OC202,OC105 & OC106 Blocked Open to Support Work Performed Under Design Change Package 82/5004.Hourly Fire Watch Established & Doors Restored to Operability on 830405 + (08:41:22, 15 December 2024)
- ML20073J171 + (08:41:22, 15 December 2024)
- ML20073J156 + (08:41:23, 15 December 2024)
- ML20073J152 + (08:41:23, 15 December 2024)
- ML20073J149 + (08:41:24, 15 December 2024)
- JPN-91-020, Advises That Facility Long Term Pipe Support Insp & Evaluation Program Completed During 1990 Refueling Outage. Program Goal of Ensuring That Pipe Supports Comply W/ Applicable Installation Criteria Met + (08:41:25, 15 December 2024)
- ML20073J143 + (08:41:25, 15 December 2024)
- ML20073J142 + (08:41:31, 15 December 2024)
- ML20073J138 + (08:41:32, 15 December 2024)
- LD-91-018, Forwards Response to NRC Request for Addl Info Re C-E SSAR Design Certification + (08:41:33, 15 December 2024)
- ML20073J134 + (08:41:36, 15 December 2024)
- ML20073J127 + (08:41:43, 15 December 2024)
- ML20073J130 + (08:41:43, 15 December 2024)
- ML20073J124 + (08:41:44, 15 December 2024)
- ML20073J120 + (08:41:44, 15 December 2024)
- ML20073J116 + (08:41:45, 15 December 2024)
- ML20073J112 + (08:41:46, 15 December 2024)
- ML20073J092 + (08:41:46, 15 December 2024)
- ML20073J089 + (08:41:47, 15 December 2024)
- BVY-91-049, Submits Corrective Actions Related to Unsatisfactory Performance of Licensed Operator Requalification Program,Per 910225 Exams.Root Cause Analysis Summary Encl + (08:41:53, 15 December 2024)
- ML20073J076 + (08:41:54, 15 December 2024)
- ML20073J073 + (08:42:01, 15 December 2024)
- ML20073J072 + (08:42:02, 15 December 2024)
- ML20073J064 + (08:42:03, 15 December 2024)
- RBG-14-819, Responds to Generic Ltr 82-33 Re Suppl 1 to NUREG-0737, Requirements for Emergency Response Capability. Status & Proposed Completion Schedule for Phased Implementation & Integration Plans Encl + (08:42:04, 15 December 2024)
- RBG-40914, Forwards Clarification of Independent Verifier Qualifications,Per NRC 940628 Request in Response to Insp Rept 50-458/94-13 + (08:42:04, 15 December 2024)
- ML20073J052 + (08:42:05, 15 December 2024)
- NRC-91-3571, Forwards Proprietary Presentation Matls Re Facility SG Tube Integrity Evaluation to Be Used at 910226 Meeting Between Vepco,Westinghouse & NRC + (08:42:06, 15 December 2024)
- ML20073J037 + (08:42:08, 15 December 2024)
- ML20073J025 + (08:42:14, 15 December 2024)
- ML20073J018 + (08:42:21, 15 December 2024)
- ML20073J014 + (08:42:21, 15 December 2024)
- ML20073J003 + (08:42:22, 15 December 2024)
- ML20073J010 + (08:42:22, 15 December 2024)
- ELV-02711, Application for Amends to Licenses NPF-68 & NPF-81 Revising TS 3.6.3 by Allowing Those Valves Associated W/Containment Hydrogen Monitors to Be Opened on Intermittent Basis Under Administrative Control + (08:42:23, 15 December 2024)