Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20073S782 + (08:17:14, 15 December 2024)
- ML20073S779 + (08:17:14, 15 December 2024)
- TXX-3664, Forwards Reactor Containment Bldg Unit 1 Preoperational Integrated Leak Rate Test,1983. Electrical Penetrations Leaked Excessively During Testing.Further Testing to Determine Cause of Leakage in Progress + (08:17:15, 15 December 2024)
- ML20073S776 + (08:17:16, 15 December 2024)
- ML20073S775 + (08:17:16, 15 December 2024)
- 05000280/LER-1983-019-03, /03L-0:on 830408,performance of Periodic Test 1-PT-39B-2 Revealed Snubbers 1-WFPD-HSS-15,1-RC-HSS-115, 1-SI-HSS-27A,1-RH-HSS-12 & 1-SI-HSS-28 Inoperable.Caused by Fluid Leaks & Loose Pipe Clamp.Snubbers Replaced + (08:17:18, 15 December 2024)
- PY-CEI-NRR-1820, Documents Deferral of Semiannual Health Physics Drill Described in Section 8.5.4.3 of Emergency Plan,Until No Later than 940831.Drill Was Scheduled to Be Conducted on 940630 + (08:17:19, 15 December 2024)
- PY-CEI-NRR-1824, Informs of Changes to Plant Operating Organization,Effective 940701 + (08:17:19, 15 December 2024)
- TXX-3662, Forwards Comments on Environ Qualification Correlation Between Installed & Qualified Components as Followup to 821014 Audit Trip Rept on Item Ii.A, Auxiliary Bldg Modular Train Filter + (08:17:20, 15 December 2024)
- ML20073S762 + (08:17:21, 15 December 2024)
- 05000280/LER-1983-018-03, /03L-0:on 830411,Type C Testing (PT-16.4 Containment Isolation Valve Leakage) Performed During Spring 1983 Refueling Outage Disclosed as-found Leakage Exceeding Allowable Rate.Caused by Normal Wear.Valves Repaired + (08:17:22, 15 December 2024)
- ML20073S756 + (08:17:23, 15 December 2024)
- LIC-94-0142, Forwards Rept of Changes,Tests & Experiments Performed,Per 10CFR50.59 & Summary of Updated Sar + (08:17:24, 15 December 2024)
- ML20073S754 + (08:17:24, 15 December 2024)
- ML20073S747 + (08:17:25, 15 December 2024)
- PLA-4138, Forwards Rev 10 to ISI-T-100.0 & Rev 7 to ISI-T-200.0 to, ISI Propram Plan for Pump & Valve Operational Testing for Units 1 & 2 + (08:17:26, 15 December 2024)
- 05000296/LER-1983-024, Forwards LER 83-024/01T-0 + (08:17:27, 15 December 2024)
- ML20073S731 + (08:17:27, 15 December 2024)
- ML20073S729 + (08:17:28, 15 December 2024)
- ML20073S722 + (08:17:29, 15 December 2024)
- ML20073S717 + (08:17:29, 15 December 2024)
- 05000352/LER-1994-008, :on 940530,reactor Recirculation Pump Seal Purge Block Valve Automatically Closed Due to Personnel Error.All Hands Meeting Was Conducted Which Discussed Event & re-emphasized to I&C Technicians + (08:17:31, 15 December 2024)
- 05000395/LER-1983-034-03, /03L-0:on 830409,motor Junction Box Cover on RHR Pump B Found W/Burned Area.Caused by Electrical Short to Ground Resulting from Insulation Failure.Termination Retaped & Pump Returned to Operable Status + (08:17:33, 15 December 2024)
- ML20073S713 + (08:17:34, 15 December 2024)
- 05000339/LER-1994-005-01, :on 940601,leakage Identified from Nozzle Weld on Small Diameter Seal Injection Line Associated W/B Reactor Coolant Pump.Caused by Seal Injection Line Nozzle Weld Failure.Unit Placed in Cold Shutdown + (08:17:35, 15 December 2024)
- 05000395/LER-1983-034, Forwards LER 83-034/03L-0.Detailed Event Analysis Encl + (08:17:36, 15 December 2024)
- L-83-275, Interim Deficiency Rept Re Failure of Two safety-related Agastat Relays to Time Out Properly & Installation of Incorrect Agastat Relay on Diesel Generator.Initially Reported on 830330.Investigation Ongoing + (08:17:37, 15 December 2024)
- ML20073S703 + (08:17:38, 15 December 2024)
- 05000260/LER-1983-015-03, /03L-0:on 830406,drywell Pressure Switch 2-PS-64-57A Found Operating Above Tech Spec Limit.Caused by Setpoint Drift.Static O-ring Switch,Model 12N-AA4,recalibr, Tested & Returned to Svc + (08:17:43, 15 December 2024)
- 05000260/LER-1983-015, Forwards LER 83-015/03L-0 + (08:17:44, 15 December 2024)
- 05000339/LER-1983-028-03, /03L-0:on 830402,emergency Diesel Generator 2J Tripped on High Crankcase Pressure After Emergency Start Signal,Initiated from ECCS Actuation,Reset.Cause Unknown. Generator Started & Tested Satisfactorily.Switch Calibr + (08:17:46, 15 December 2024)
- 05000339/LER-1983-028, Forwards LER 83-028/03L-0 + (08:17:47, 15 December 2024)
- ML20073S673 + (08:17:47, 15 December 2024)
- ML20073S672 + (08:17:48, 15 December 2024)
- ML20073S666 + (08:17:51, 15 December 2024)
- 05000348/LER-1983-016-03, /03L-0:on 830412,diesel Generator 1B Declared Inoperable Due to Start Failure Resulting in Inoperability of Train B Due to Loss of Emergency Power.Caused by Mechanical Binding of Fuel Filter Constant Vent Check Valve + (08:17:53, 15 December 2024)
- 05000348/LER-1983-016, Forwards LER 83-016/03L-0 + (08:17:54, 15 December 2024)
- ML20073S661 + (08:17:54, 15 December 2024)
- ML20073S657 + (08:17:55, 15 December 2024)
- 05000369/LER-1983-016-03, /03L-0:on 830327,hanger 1MCA-ND-H260 Discovered Pulled Loose from Wall Anchors & Snubbers 1MCA-ND-H177 & H317 Found Locked Up During Subsequent full-stroking.Caused by Water Hammer Event Resulting in Void Formation + (08:17:57, 15 December 2024)
- 05000369/LER-1983-016, Forwards LER 83-016/03L-0 + (08:17:58, 15 December 2024)
- ML20073S648 + (08:17:58, 15 December 2024)
- ML20073S639 + (08:17:59, 15 December 2024)
- ML20073S628 + (08:18:00, 15 December 2024)
- ML20073S619 + (08:18:00, 15 December 2024)
- ML20073S610 + (08:18:01, 15 December 2024)
- ML20073S585 + (08:18:01, 15 December 2024)
- ML20073S569 + (08:18:02, 15 December 2024)
- ML20073S542 + (08:18:03, 15 December 2024)
- ML20073S535 + (08:18:04, 15 December 2024)
- ML20073S520 + (08:18:05, 15 December 2024)