Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20076C429 + (08:00:28, 15 December 2024)
- ML20076C428 + (08:00:29, 15 December 2024)
- ML20076C427 + (08:00:30, 15 December 2024)
- ML20076C424 + (08:00:30, 15 December 2024)
- ML20076C423 + (08:00:31, 15 December 2024)
- ML20076C419 + (08:00:38, 15 December 2024)
- ML20076C415 + (08:00:39, 15 December 2024)
- JPN-91-033, Suppl to 900531 Application for Amend to License DPR-59, Consisting of Suppl a to Holtec Rept HI-89399 Re Expansion of Storage Capacity of Spent Fuel Pool.Analysis Indicates That No rack-to-rack Impacts Would Occur W/Reduced Spacing + (08:00:41, 15 December 2024)
- ML20076C409 + (08:00:42, 15 December 2024)
- ML20076C403 + (08:00:43, 15 December 2024)
- ML20076C401 + (08:00:44, 15 December 2024)
- ML20076C400 + (08:00:44, 15 December 2024)
- ML20076C394 + (08:00:45, 15 December 2024)
- 05000315/LER-1983-064-03, /03L-0:on 830707,east Component Cooling Water Miscellaneous Header Isolation Valve CMO-415 Would Not Close Completely from Control Room.Cause Unidentified.Valve Operated Satisfactorily During Retest + (08:00:47, 15 December 2024)
- ML20076C386 + (08:00:49, 15 December 2024)
- ML20076C391 + (08:00:49, 15 December 2024)
- ML20076C385 + (08:00:50, 15 December 2024)
- 05000373/LER-1983-076-03, /03L-0:on 830709,during LIS-R1-01,RCIC Steam Line High Flow Isolation Calibr & Functional Test,Dpis 1E31-N013B Low Setpoint Found Out of Tolerance.Cause Not Determined. Setpoints Recalibr + (08:00:51, 15 December 2024)
- 05000354/LER-1990-014, :on 900817,discovered Tech Spec Limit for Ultimate Heat Sink Established Unconservatively High. Caused by Design Calculation Error.Design Change Request Initiated + (08:00:53, 15 December 2024)
- ML20076C378 + (08:00:54, 15 December 2024)
- 05000313/LER-1991-007-02, :on 910614,during Insp,Fuse Discovered Inadequate.Caused by Design Inadequacies.Firewatches Posted in Areas of Common Vulnerability & Fuses for Emergency Batteries Replaced + (08:00:56, 15 December 2024)
- ML20076C374 + (08:00:59, 15 December 2024)
- RBG-15-639, Interim Deficiency Rept R-117 Re Unanalyzed Scenario Which Could Result in Containment Negative Pressure Beyond Design Negative Pressure.Initially Reported on 830517.Util Awaiting Addl Info from Ae.Next Rept by 830930 + (08:01:00, 15 December 2024)
- ML20076C373 + (08:01:00, 15 December 2024)
- ML20076C369 + (08:01:01, 15 December 2024)
- 05000458/LER-1991-002, :on 910216,ESF Actuation Occurred When Reactor Water Sample Containment Isolation Valve.Caused by Failure of Fuse Pressure High.Replacing Fuse & Reopening Reactor Water Sample Valve + (08:01:02, 15 December 2024)
- ML20076C365 + (08:01:03, 15 December 2024)
- ML20076C364 + (08:01:04, 15 December 2024)
- ML20076C351 + (08:01:05, 15 December 2024)
- ML20076C354 + (08:01:05, 15 December 2024)
- 05000373/LER-1983-075-03, /03L-0:on 830709,while Conducting LOS-PF-Q1, Quarterly Watertight Door Surveilance,Water Tight Door 17 Found Open & Broken.Caused by Broken Shear Pin in Gear Mechanism.Door Repaired + (08:01:07, 15 December 2024)
- ML20076C347 + (08:01:08, 15 December 2024)
- 05000373/LER-1983-080-03, /03L-0:on 830707,LPCS Water Leg Pump & Discharge Pressure Low Alarm Tripped.Caused by Frozen Pump W/Outboard Bearing Locked on Pump.Shaft,Bearings,Oil Seals & Mechanical Seal Replaced + (08:01:09, 15 December 2024)
- AECM-83-0470, Commits to Supply Addl Info Addressing NRC Concerns Re Revised Control Room Inleakage Dose Assessment & Modified Meteorological Assumptions within 6 Months.Discussion of Conservatisms in Revised X/Q Methodology Encl + (08:01:10, 15 December 2024)
- ML20076C329 + (08:01:11, 15 December 2024)
- ML20076C331 + (08:01:11, 15 December 2024)
- ML20076C326 + (08:01:12, 15 December 2024)
- ML20076C327 + (08:01:12, 15 December 2024)
- ML20076C325 + (08:01:13, 15 December 2024)
- ML20076C321 + (08:01:14, 15 December 2024)
- ML20076C322 + (08:01:14, 15 December 2024)
- 05000443/LER-1991-007, :on 910615,actuation of Control Room Emergency Air Cleanup & Filtration Subsystems Occurred.Caused by Personnel Error Due to Lack of Attention to Detail.Event Will Be Discuss W/Respective Operating Crews + (08:01:16, 15 December 2024)
- 05000316/LER-1983-064-03, /03L-0:on 830717,computer P-250 Which Logs Axial Flux Difference Failed.Caused by Personnel Error.Personnel Counseled + (08:01:18, 15 December 2024)
- A16764, Radiochemical Analysis of First Plateout Probe from Fort St Vrain High-Temp Gas-Cooled Reactor + (08:01:19, 15 December 2024)
- ML20076C314 + (08:01:20, 15 December 2024)
- 05000316/LER-1983-063-03, /03L-0:on 830709,steam Generator 2 Stop Valve MRV-220 Drifted Off Open Detents.Cause Not Stated.Detents Spring Tension Adjusted + (08:01:22, 15 December 2024)
- ML20076C310 + (08:01:23, 15 December 2024)
- ML20076C308 + (08:01:24, 15 December 2024)
- 05000366/LER-1983-062-03, /03L-0:on 830720 & 25,core Max Fraction of Limiting Power Density Exceeded Fraction of Rated Thermal Power.Caused by Peaks in Core Flux.Average Power Range Monitor Adjusted + (08:01:25, 15 December 2024)
- 05000316/LER-1983-062-03, /03L-0:investigation Determined 830616 & 24 Events Re Control Room Cable Vault Fire Detection Instrumentation Reportable.Events Caused by Pyralarm Detectors Alarming W/ No Adverse Conditions.Fire Watch Established + (08:01:27, 15 December 2024)
- ML20076C299 + (08:01:28, 15 December 2024)