Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20077H422 + (06:30:44, 15 December 2024)
- ML20077H413 + (06:30:45, 15 December 2024)
- ML20077H400 + (06:30:46, 15 December 2024)
- ML20077H412 + (06:30:46, 15 December 2024)
- ML20077H391 + (06:30:47, 15 December 2024)
- ML20077H342 + (06:30:48, 15 December 2024)
- 05000387/LER-1983-092-03, /03L-0:on 830624,one Offsite Power Supply Lost When Transformer Failed.Cause Unknown.Final Determinations to Be Made Following Investigation of Transformer Internals by Vendor.Transformer Replaced + (06:30:50, 15 December 2024)
- ML20077H328 + (06:30:51, 15 December 2024)
- ML20077H319 + (06:30:52, 15 December 2024)
- TXX-4016, Final Deficiency Rept Re HVAC Hangers Fabricated at Variance W/Design Documents.Investigation Concluded Matter Not Reportable Per 10CFR50.55(e).Records Supporting Determination Available at Site + (06:30:53, 15 December 2024)
- ML20077H304 + (06:30:54, 15 December 2024)
- ML20077H305 + (06:30:54, 15 December 2024)
- ML20077H299 + (06:30:55, 15 December 2024)
- RBG-15-560, Interim Deficiency Rept DR-122 Re Undocumented Weld Filler Matl in Bf Shaw Shop Welds of RHR Pipe Spool.Investigation Incomplete.Interim or Final Status Rept Will Be Provided by 830916 + (06:30:56, 15 December 2024)
- 05000311/LER-1983-029-99, /99L-0:on 830617,pressurizer Overpressure Protection Sys Actuated Due Pressure Transient Resulting from Compressed Pressurizer Bubble.Caused by Personnel Leaving Charging Pump in Svc + (06:30:57, 15 December 2024)
- ML20077H289 + (06:30:59, 15 December 2024)
- ML20077H292 + (06:30:59, 15 December 2024)
- RBG-15-559, Interim Deficiency Rept DR-110 Re Possible Contamination of Stainless Steel W/Ultrasonic Couplant Failing to Meet Chemical Analysis Requirement.Lab Results Awaited.Interim or Final Status Rept Will Be Provided by 830908 + (06:31:00, 15 December 2024)
- ML20077H281 + (06:31:01, 15 December 2024)
- ML20077H251 + (06:31:02, 15 December 2024)
- ML20077H260 + (06:31:02, 15 December 2024)
- ML20077H244 + (06:31:03, 15 December 2024)
- ML20077H242 + (06:31:04, 15 December 2024)
- ML20077H243 + (06:31:04, 15 December 2024)
- ML20077H240 + (06:31:05, 15 December 2024)
- W3P83-2583, Forwards Rev 1 to Procedure NE-5-301, Technical Procedure - Prediction of Core Damage, Per TMI Action Item II.B.3 + (06:31:08, 15 December 2024)
- ML20077H232 + (06:31:09, 15 December 2024)
- 05000285/LER-1983-005-03, /03L-0:on 830709,channel B of Reactor Protective Sys Axial Power Distribution Negative Setpoint Observed Fluctuating in Nonconservative Direction.Caused by Failed Bell & Howell Potentiometer Module 384612-001 + (06:31:10, 15 December 2024)
- 05000318/LER-1983-034-03, /03L-0:on 830622,containment Atmosphere Particulate Radioactivity Monitor Inoperable Due to Torn & Wrinkled Filter Paper.Caused by Normal Air Sample Moisture & Air Flow.Mod to Prevent Tearing Designed + (06:31:12, 15 December 2024)
- ML20077H229 + (06:31:13, 15 December 2024)
- 05000219/LER-1983-015-03, /03L-0:on 830609,electricians Found Wire Wrapped Around Armature of Undervoltage Trip Device.Caused by Personnel Error in Installation of Wire Gag.Tripcoil,Blown Fuses & Static Time Delay Box Replaced + (06:31:15, 15 December 2024)
- 05000318/LER-1983-035-03, /03L-0:on 830623,main Steam Supply Valve to steam- Driven Auxiliary Feedwater Pumps Failed Open,Causing Auxiliary Feedwater Pump 21 to Start.Caused by Diaphragm Failure Due to Inadvertent Overpressurization + (06:31:17, 15 December 2024)
- AECM-83-0346, Reponds to IE Bulletin 79-18, Audibility Problems Encountered on Evacuation of Personnel from High Noise Areas. Evacuation Alarm Sys Installed.Full Testing Will Be Completed During Power Ascension + (06:31:18, 15 December 2024)
- PLA-1754, Final Deficiency Rept Re Improperly Torqued Shock Suppressor Screws on Piping Sys.Initially Reported on 830622.Screws Retorqued.Bechtel Field Procedure FP-P-20 Revised to Delineate Torque Values.Also Reported Per Part 21 + (06:31:18, 15 December 2024)
- W3P83-2540, Provides Details of Program to Conduct Periodic Survey of Industrial & Transportation Activities in Vicinity of Site for Chemical Inventory Changes Which May Require Mods to Existing Toxic Gas Protection Sys + (06:31:19, 15 December 2024)
- ML20077H211 + (06:31:20, 15 December 2024)
- 05000368/LER-1983-031-03, /03L-0:on 830713,control Room Emergency Air Conditioner 2VE-1B Observed Tripping Due to Low Freon. Caused by Leak in Liquid Line Serving Core Protection Calculator Room Air Conditioner.Leak Repaired + (06:31:22, 15 December 2024)
- ML20077H184 + (06:31:23, 15 December 2024)
- ML20077H191 + (06:31:23, 15 December 2024)
- ML20077H177 + (06:31:24, 15 December 2024)
- 05000277/LER-1983-017-03, /03L-0:on 830620,offsite Electrical Source Taken Out of Svc Due to Defective Transformer Relief Device.Relief Device Replaced & Electrical Sys Returned to Normal Configuration + (06:31:25, 15 December 2024)
- ML20077H172 + (06:31:26, 15 December 2024)
- ML20077H167 + (06:31:27, 15 December 2024)
- 05000387/LER-1983-097-03, /03L-0:on 830624,reactor Recirculation Sys Shutdown,Reactor Water Cleanup Sys Isolated & Cooldown Rate of Idle Loops Exceeded Tech Specs.Engineering Evaluation of Monitoring Techniques Requested + (06:31:28, 15 December 2024)
- ML20077H161 + (06:31:29, 15 December 2024)
- ML20077H159 + (06:31:30, 15 December 2024)
- ML20077H155 + (06:31:30, 15 December 2024)
- ML20077H140 + (06:31:31, 15 December 2024)
- ML20077H151 + (06:31:31, 15 December 2024)
- ML20077H138 + (06:31:32, 15 December 2024)
- ML20077H127 + (06:31:32, 15 December 2024)