Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- 05000298/LER-1994-022, :on 940919,TS Maximum Flow Limitation for LPCI Sys Were Not Proven by Existing Sp 6.3.5.1.Caused by non-compliance W/Ts Surveillance Requirements.Design Change Acceptance Testing Performed + (05:57:28, 15 December 2024)
- ML20078B519 + (05:57:29, 15 December 2024)
- ML20078B508 + (05:57:32, 15 December 2024)
- ML20078B504 + (05:57:33, 15 December 2024)
- ML20078B498 + (05:57:34, 15 December 2024)
- ML20078B497 + (05:57:35, 15 December 2024)
- ML20078B481 + (05:57:36, 15 December 2024)
- ML20078B483 + (05:57:36, 15 December 2024)
- ML20078B478 + (05:57:38, 15 December 2024)
- ML20078B479 + (05:57:38, 15 December 2024)
- ML20078B471 + (05:57:39, 15 December 2024)
- ML20078B467 + (05:57:39, 15 December 2024)
- BECO-LTR-94-110, Forwards Responses to Questions Raised by NRC During 941004 Meeting Re Pilgrim Shroud Safety Assessment + (05:57:40, 15 December 2024)
- ML20078B463 + (05:57:40, 15 December 2024)
- 05000461/LER-1994-009, :on 941220,operator Failed to Initiate Operability of Offsite Ac Power Sources within One H After Declaring Div 3 EDG Inoperable Due to Oversight.Event Reviewed & Findings Discussed + (05:57:42, 15 December 2024)
- ML20078B447 + (05:57:43, 15 December 2024)
- ML20078B439 + (05:57:44, 15 December 2024)
- ML20078B435 + (05:57:44, 15 December 2024)
- PY-CEI-NRR-1836, Provides Description of Incident & Investigation Conclusions Re 940615 Telephone Rept Made to Region III Concerning Finding of Incorrect Info in Util ,Reporting Completion of Ipe.Rept Made on 940615 Withdrawn + (05:57:45, 15 December 2024)
- ML20078B419 + (05:57:48, 15 December 2024)
- LD-83-103, Amends Re Route for Irradiated Reactor Fuel Shipments Between West Valley,Ny & Facility.Approval of Alternative Route Requested + (05:57:49, 15 December 2024)
- ML20078B415 + (05:57:49, 15 December 2024)
- GO2-83-837, Revised Final Deficiency Rept 271 Re Anchor Darling Valves W/Antirotation Collars (LPCS-V-121).Startup Problem Rept M-2720 Issued to Document deficiency.L-shaped Key Used for Valves Subj to Heavy Vibration + (05:57:50, 15 December 2024)
- ML20078B398 + (05:57:50, 15 December 2024)
- 05000306/LER-1994-004-02, :on 941220,discovered That CWS Snubber Was Not Tested as Required.Caused by Oversight by Project Engineer. Removed Snubber for Further Testing & Installed Replacement Snubber + (05:57:52, 15 December 2024)
- PY-CEI-NRR-1876, Responds to NRC Re Violations Noted in Insp Rept 50-440/94-11 on 940707-0818.Corrective Actions:Event Has Been Reviewed W/I&C Personnel Involved W/Planning of Work Order Package + (05:57:56, 15 December 2024)
- LD-83-143, Responds to NRC Re Violations Noted in IE Insp Rept 50-528/83-31.Corrective Actions:Startup Personnel to Ensure All Procedure Action Statements Complete.Const Power Cable Removed & Returned to Const for Disposition + (05:57:57, 15 December 2024)
- ML20078B381 + (05:57:57, 15 December 2024)
- 05000321/LER-1994-011, :on 940930,unplanned Automatic Start of EDG Occurred Due to Personnel Error.Involved Electrician Made Aware of Mistake & Consequences + (05:57:59, 15 December 2024)
- ML20078B362 + (05:58:00, 15 December 2024)
- ML20078B356 + (05:58:01, 15 December 2024)
- ML20078B359 + (05:58:01, 15 December 2024)
- 05000301/LER-1994-002-01, :on 940713,quarterly TS Test of PORV Block Valve Not Performed.Caused by Improper Temporary Change to IST Procedure IT-25.Temporary Change Approved on 940707 + (05:58:03, 15 December 2024)
- ML20078B345 + (05:58:04, 15 December 2024)
- ML20078B348 + (05:58:04, 15 December 2024)
- ML20078B344 + (05:58:05, 15 December 2024)
- ML20078B342 + (05:58:06, 15 December 2024)
- ML20078B341 + (05:58:07, 15 December 2024)
- ML20078B337 + (05:58:07, 15 December 2024)
- NRC-94-0095, Confirms All Actions in Response to NRC Bulletin 93-002, Suppl 1 Completed + (05:58:08, 15 December 2024)
- ML20078B331 + (05:58:08, 15 December 2024)
- ML20078B321 + (05:58:09, 15 December 2024)
- 05000454/LER-1994-014-04, :on 940915,declared DG Inoperable in Mode 5 Due to Misinterpretation of TS Requirements.Revised Procedures & Electronic Work Control Sys + (05:58:11, 15 December 2024)
- 05000325/LER-1994-012-01, :on 940922,declared HPCI Inoperable Due to Failure of Lube Oil Cooling Water Supply Valve Control Power Fuse.Caused by Inadequate self-checking & Job Scope Walkdown.Disciplined Involved Workers + (05:58:13, 15 December 2024)
- ML20078B307 + (05:58:14, 15 December 2024)
- ML20078B304 + (05:58:14, 15 December 2024)
- BSEP-95-0012, Forwards Nonproprietary Version of Brunswick Steam Electric Plant,Unit 1 Feedwater Nozzle Fracture Mechanics Analysis, NEDC-30634,Rev 1.Requests That Copies of Document Originally Submitted by Util Be Destroyed + (05:58:15, 15 December 2024)
- 05000457/LER-1994-006-09, :on 940920,chemical & Volume Control Sys Snubber Was Removed in Order to Work on Adjacent Containment Spray Valve.Caused by Programmatic Deficiency. Work Control Procedure Will Be Revised + (05:58:16, 15 December 2024)
- HL-4716, Submits Proposed Operator Licensing Examination Schedule for FY95-98 + (05:58:17, 15 December 2024)
- ML20078B244 + (05:58:22, 15 December 2024)
- 3F1094-02, Forwards Crystal River Unit 3 Operational Safeguards Response Evaluation Rept.Rept Withheld + (05:58:23, 15 December 2024)
- 05000354/LER-1994-013-01, :on 940915,control Room Shift Manning Requirements of TS 6.2.2.a Were Not Met.Caused by Personnel Error.Administrative Procedure Revised & Operators Trained + (05:58:24, 15 December 2024)