Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20079D596 + (04:48:56, 15 December 2024)
- ML20079D591 + (04:48:59, 15 December 2024)
- ML20079D581 + (04:49:00, 15 December 2024)
- 05000293/LER-1991-013, :on 910613,as-found Leak Test Results for Four Feedwater Check Valves Discovered to Be in Excess of TS Limits.Caused by Disc Misalignment,Resulting in Improper Valve Seating.Valve Internals Rebuilt + (04:49:01, 15 December 2024)
- 05000482/LER-1991-009, :on 910613,discovered That Surveillance Testing for Main Steam Loop 1 Low Point Drain Valve Not Performed at Required Frequency.Caused by Personnel Error.Clearance Order Procedure Revised + (04:49:03, 15 December 2024)
- 05000327/LER-1991-012-01, :on 910612,breach to Control Room Pressurization Boundary Discovered.Caused by Inappropriate Personnel Actions.Work Request Initiated to Seal Breach.W/ + (04:49:05, 15 December 2024)
- 05000327/LER-1991-014, :on 910610,fire Watches Required by Tech Spec LCOs 3.3.3.8 & 3.7.12 Were Not Performed.Caused by Airborne Radiological Conditions.Airborne & Contamination Conditions Corrected + (04:49:07, 15 December 2024)
- 05000325/LER-1991-015-01, :on 910612,CRD Hydraulic Control Unit Declared Inoperable.Caused by Simultaneous Inoperability of Two CRD Hydraulic Control Units.Unit Accumulator Recharged W/ Nitrogen & Repaired + (04:49:09, 15 December 2024)
- 05000423/LER-1991-014-01, :on 910609,reactor Trip Occurred Due to Switchyard Malfunction.Broken Screw & Affected Wiring Repaired & Pilot Wire Relay Returned to Svc + (04:49:11, 15 December 2024)
- 05000373/LER-1991-008-03, :on 910613,control Room Ventilation Emergency make-up Train Auto Started on Spurious Trip from Control Room Air Intake Radiation Monitor.Possibly Caused by Random Noise.Logic Modified + (04:49:13, 15 December 2024)
- 05000278/LER-1991-009-03, :on 910530,standby Liquid Control Sys Declared Inoperable.Caused by Reactor Operator Incorrectly Selecting Procedure Used to Initially Fill & Setup Sys.Individuals Involved Coached + (04:49:15, 15 December 2024)
- 05000348/LER-1991-002-01, :on 910408,temporary Strainer Discovered Installed in Pump Suction Piping of Charing Pumps 1B & 1C. Caused by Inadequate Planning & Documentation.Strainers Removed from Charging Pumps + (04:49:17, 15 December 2024)
- 05000352/LER-1991-016-01, :on 910610,reactor Pressure Increased Above 150 Psig W/Rcic Sys Inoperable.Caused by Main Control Room (MCR) Shift Supervisor Failure to Comply W/Startup Procedure GP-2. MCR Shift Supervisor Counseled + (04:49:23, 15 December 2024)
- 05000219/LER-1991-002-01, :on 910221,local Leak Rate Testing Identified MSIV W/Leak Rate in Excess of Limits Due Valve Degradation. Mfg,Atwood & Morrill Modified Original Design to Provide Assurance That MSIVs Would Meet Requirements + (04:49:25, 15 December 2024)
- 05000293/LER-1991-011, :on 910604,inadvertent Primary Containment & Secondary Containment Isolation Signal Occurred Due to Util Licensed Operator Error.Responsible Engineer Counseled + (04:49:27, 15 December 2024)
- 05000416/LER-1991-004-03, :on 910611,reactor Scram Occurred Due to Loss of Feedwater.Caused by Failed Pneumatic Relay Inside Valve Positioner.Positioner Replaced & Retested Satisfactorily.W/ + (04:49:29, 15 December 2024)
- 05000321/LER-1991-011-01, :on 910612,missed Tech Spec Surveillances Occurred.Caused by Inadequate Procedure.Revising Affected Procedure to Require Verification of Receipt of Samples & Evaluation of Analyses + (04:49:33, 15 December 2024)
- 05000293/LER-1991-012, :on 910607,inadvertent Automatic Start of EDG a Occurred During Scheduled Surveillance Test While Shutdown for Refueling Outage.Caused by non-licensed Personnel Error + (04:49:35, 15 December 2024)
- ML20079D430 + (04:49:36, 15 December 2024)
- TAC:79887 + (04:49:37, 15 December 2024)
- ML20079D428 + (04:49:38, 15 December 2024)
- 05000370/LER-1991-003-06, :on 910606,inadvertent Unit 2 Train B ESF Actuation Occurred.Caused by Inappropriate Action & Mgt Deficiencies.Appropriate Procedure Changes Implemented + (04:49:40, 15 December 2024)
- ML20079D404 + (04:49:41, 15 December 2024)
- 05000277/LER-1991-020, :on 910607,two Diesel Generators Discovered Inoperable Due to Mispositioned Valve.Caused by Personnel Error.Valve Immediately Restored & Involved Operator & Chemist Counseled + (04:49:42, 15 December 2024)
- 05000445/LER-1991-019, :on 910609,power from Preferred Offsite 345 Kv Transmission Line Momentarily Lost.Caused by Lightning Strike.Design Mod Made to Switchyard to Enhance Reliability of Offsite Power Sources + (04:49:44, 15 December 2024)
- 05000354/LER-1991-013-01, :on 910605,both Trains of Standby Liquid Control Discovered Inoperable During Performance of Inservice Testing.Caused by Procedural Deficiency.Procedures Modified + (04:49:46, 15 December 2024)
- ML20079D397 + (04:49:50, 15 December 2024)
- ML20079D396 + (04:49:51, 15 December 2024)
- ML20079D394 + (04:49:51, 15 December 2024)
- ML20079D392 + (04:49:52, 15 December 2024)
- ML20079D386 + (04:49:53, 15 December 2024)
- ML20079D390 + (04:49:53, 15 December 2024)
- ELV-02948, Responds to NRC Ltr Re Violations Noted in Insp Repts 50-424/91-09 & 50-425/91-09 on 910421-0525.Corrective Actions:Discharge Valve Closed to Restore Pump to Operable Status & Landed Wires Landed Correctly + (04:49:54, 15 December 2024)
- ML20079D379 + (04:49:54, 15 December 2024)
- U-601852, Forwards Rev 10A to Physical Security Plan in Response to NRC .Rev Withheld (Ref 10CFR73.21(C)(2)) + (04:49:55, 15 December 2024)
- 05000354/LER-1991-012-01, :on 910604,condition Requiring Entry Into Tech Spec 3.0.3 Occurred.Caused by Concurrent Inoperability of High Pressure Coolant Injection Sys for Surveillance & B Low Pressure Coolant Injection Sys for Maint + (04:49:56, 15 December 2024)
- ML20079D373 + (04:49:58, 15 December 2024)
- ML20079D375 + (04:49:58, 15 December 2024)
- PM-91-112, Monthly Operating Rept for Jun 1991 for Shoreham Nuclear Power Station + (04:49:59, 15 December 2024)
- ST-HL-AE-3805, Forwards 1RE03 Inservice Insp Summary Rept for Repairs & Replacement at South Texas Project Electric Generating Station Unit 1 + (04:49:59, 15 December 2024)
- ML20079D368 + (04:50:00, 15 December 2024)
- ML20079D363 + (04:50:01, 15 December 2024)
- ST-HL-AE-3806, Forwards 1RE03 Inservice Insp Summary Rept for Sys Pressure Tests at South Texas Project,Unit 1, Including Period from Second Refueling Outage 900621 to Completion of Third Refueling Outage 910404 + (04:50:01, 15 December 2024)
- ML20079D361 + (04:50:02, 15 December 2024)
- ELV-02950, Suppls 910703 Request for Regional Waiver of Compliance from Tech Spec 3.0.3 Re Pressurizer Pressure Low Pressure Safety Injection Setpoint.All Four Channels on Instrumentation on Each Unit Recalibr by 910704 + (04:50:03, 15 December 2024)
- ML20079D357 + (04:50:03, 15 December 2024)
- 05000259/LER-1991-007-02, :on 910531,EDG auto-started Due to Degraded Voltage Condition on 4 Kv Shutdown Board.Caused by Inadequate Procedure Control.Daily Electrical Log Revised + (04:50:05, 15 December 2024)
- ML20079D348 + (04:50:06, 15 December 2024)
- ML20079D347 + (04:50:07, 15 December 2024)
- ML20079D345 + (04:50:08, 15 December 2024)
- ML20079D328 + (04:50:13, 15 December 2024)