Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML091740450 + (16:15:59, 14 January 2025)
- ML091740456 + (16:15:59, 14 January 2025)
- ML091740447 + (16:16:04, 14 January 2025)
- ML091740446 + (16:16:05, 14 January 2025)
- ML091740445 + (16:16:05, 14 January 2025)
- ML091740396 + (16:16:06, 14 January 2025)
- ML091740391 + (16:16:07, 14 January 2025)
- 05000457/LER-2009-001, Regarding Reactor Trip in Over Temperature Delta Temperature Due to a Signal Spike on One Channel with Another Channel Placed in the Tripped Condition for Surveillance Testing + (16:16:10, 14 January 2025)
- ML091740317 + (16:16:11, 14 January 2025)
- RBG-46922, Request for Alternative - Implementation of a Risk-Informed Inservice Inspection Program Based on ASME Code Case N-716 + (16:16:12, 14 January 2025)
- ML091740255 + (16:16:13, 14 January 2025)
- ML091740283 + (16:16:13, 14 January 2025)
- NRC-09-0042, Submittal of Report on Blind Sample Test Reporting Error + (16:16:14, 14 January 2025)
- ML091740231 + (16:16:15, 14 January 2025)
- ML091740225 + (16:16:16, 14 January 2025)
- ML091740220 + (16:16:16, 14 January 2025)
- ML091740212 + (16:16:17, 14 January 2025)
- IR 05000298/2009011 + (16:16:19, 14 January 2025)
- ML091740201 + (16:16:20, 14 January 2025)
- ML091740164 + (16:16:21, 14 January 2025)
- ML091740160 + (16:16:23, 14 January 2025)
- ML091740145 + (16:16:24, 14 January 2025)
- ML091740144 + (16:16:25, 14 January 2025)
- LR-N09-0126, Relief Requests to Extend the Inservice Interval for Reactor Vessel Weld Examination + (16:16:26, 14 January 2025)
- LR-N09-0133, Response to Request for Additional Information Regarding Relief Request for Examinations and Tests of Snubbers + (16:16:26, 14 January 2025)
- 05000305/LER-2009-006, Protection Instruments Not Calibrated to Individual Technical Specification Set Point Limits + (16:16:29, 14 January 2025)
- RBG-46923, Request for Alternative RBS-ISI-012 Request to Extend the Second ASME Inservice Inspection Interval + (16:16:30, 14 January 2025)
- ML091740135 + (16:16:31, 14 January 2025)
- NG-09-0442, Startup Test Report for Extended Power Uprate - Phase IV (Final Report) + (16:16:32, 14 January 2025)
- ML091740132 + (16:16:33, 14 January 2025)
- ML091740128 + (16:16:34, 14 January 2025)
- ML091740125 + (16:16:37, 14 January 2025)
- ML091740111 + (16:16:41, 14 January 2025)
- ML091740108 + (16:16:45, 14 January 2025)
- ML091740105 + (16:16:48, 14 January 2025)
- IR 05000271/2009302 + (16:16:51, 14 January 2025)
- ML091740103 + (16:16:51, 14 January 2025)
- ML091740070 + (16:16:53, 14 January 2025)
- RS-09-078, Response to Request for Additional Information Related to Technical Specification 3.3.6.1, Primary Containment and Drywell Isolation Instrumentation + (16:16:53, 14 January 2025)
- 05000261/LER-2009-001, Regarding Emergency Diesel Generator Inoperable in Excess of Technical Specifications Allowed Completion Time + (16:16:58, 14 January 2025)
- 05000334/LER-2009-004, Regarding Two Ultrasonic Indications Found in Reactor Coolant System Drain Pipe + (16:17:02, 14 January 2025)
- 05000334/LER-2009-003, Regarding Containment Liner Through Wall Defect Due to Corrosion + (16:17:05, 14 January 2025)
- 05000334/LER-2009-002, Regarding Feedwater Isolation Initiates Auxiliary Feedwater System During Refueling Shutdown + (16:17:07, 14 January 2025)
- ML091740042 + (16:17:08, 14 January 2025)
- ML091740033 + (16:17:09, 14 January 2025)
- ML091740040 + (16:17:09, 14 January 2025)
- ML091740032 + (16:17:10, 14 January 2025)
- ML091740029 + (16:17:11, 14 January 2025)
- ML091740028 + (16:17:11, 14 January 2025)
- ML091740027 + (16:17:12, 14 January 2025)
- TAC:ME0248 + (16:17:12, 14 January 2025)