Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- AECM-83-0724, Forwards Partial Response to Request for Addl Info Re Transamerica Delaval,Inc Diesel Generators Supplied to Facility.Steps Taken to Obtain More Detailed Info on Crankshaft Design Analyses & Testing Done by Lilco + (12:39:04, 14 December 2024)
- ML20081M221 + (12:39:34, 14 December 2024)
- ML20081M223 + (12:39:34, 14 December 2024)
- ML20081M215 + (12:39:39, 14 December 2024)
- ML20081M209 + (12:39:42, 14 December 2024)
- ML20081M207 + (12:39:43, 14 December 2024)
- ML20081M204 + (12:39:44, 14 December 2024)
- 05000249/LER-1983-037-03, 83-037/03L-0:on 831005,during Daily Battery Surveillance, 250-volt Battery Charger Float Voltage Indicated Improper Float Voltage.Caused by Defective Amplifier Board.Defective Board Replaced + (12:39:45, 14 December 2024)
- ML20081M197 + (12:39:47, 14 December 2024)
- 05000338/LER-1983-060-03, /03L-0:on 831011,carbon Dioxide for Fuel Oil Pump Room 1 Did Not Discharge Automatically When Temp Sensor Heated Above Setpoint During Periodic Test.Caused by Fouling of Pilot Control Valve.Valve Replaced + (12:39:49, 14 December 2024)
- ML20081M185 + (12:39:50, 14 December 2024)
- ML20081M178 + (12:39:51, 14 December 2024)
- ML20081M180 + (12:39:51, 14 December 2024)
- ML20081M172 + (12:39:52, 14 December 2024)
- ML20081M171 + (12:39:53, 14 December 2024)
- ML20081M152 + (12:39:54, 14 December 2024)
- ML20081M161 + (12:39:54, 14 December 2024)
- 05000387/LER-1983-142-03, /03L-0:on 830929,jumper Caused Short Circuit in Relay Logic Board Resulting in Loss of Radiation Monitor & Ventilation Sys Isolation.Caused by Alligator Clips Falling Off Jumper.Logic Board Repaired + (12:39:56, 14 December 2024)
- ML20081M145 + (12:39:57, 14 December 2024)
- ML20081M143 + (12:39:58, 14 December 2024)
- ML20081M140 + (12:39:59, 14 December 2024)
- ML20081M142 + (12:39:59, 14 December 2024)
- ML20081M138 + (12:40:00, 14 December 2024)
- ML20081M133 + (12:40:01, 14 December 2024)
- 05000328/LER-1983-144-03, /03L-0:on 831011,during 18-month Calibr of Reactor Trip Sys Instrumentation,One Channel of RCS Flow & Power Range Neutron Flux Found Out of Tolerance.Caused by Instrument Drift.Channels Recalibr + (12:40:03, 14 December 2024)
- ML20081M127 + (12:40:04, 14 December 2024)
- AECM-83-0705, Forwards Suppl 2 to Monthly Operating Rept for Sept 1983. Suppl Provides Detailed Descriptions & Justification for Changes to Offsite Dose Calculation Manual + (12:40:05, 14 December 2024)
- ML20081M125 + (12:40:05, 14 December 2024)
- 05000370/LER-1983-059-03, /03L-0:on 830929,during Safety Injection Sys (Ni) Valve Stroke Timing,Valve 2NI-267A Was in Intermediate Position.Caused by Closed Torque Switch,Prohibiting Full Valve Closure.Valve Actuator Adjusted + (12:40:07, 14 December 2024)
- L-83-553, Forwards Reponses to 830902 Request for Addl Info Re IE Bulletin 80-11 Masonry Wall Design. W/O Encls + (12:40:08, 14 December 2024)
- 05000327/LER-1983-139-03, /03L-0:on 831015,primary Containment Internal Pressure Exceeded + or -1.3 Psig Relative to Annulus for Approx 15 Minutes.Caused by Failure to Open Exhaust Fan Suction Isolation Valve During Valve Lineup + (12:40:10, 14 December 2024)
- ML20081M099 + (12:40:15, 14 December 2024)
- 05000328/LER-1983-145-03, /03L-0:on 831011,during Refueling Cycle Surveillance,Steam Generator Level Channels 2-LT-3-39 & 107 Found Out of Calibr.Probably Caused by Transmitter Drift. Transmitters Recalibr + (12:40:16, 14 December 2024)
- 05000327/LER-1983-134-03, /03L-0:on 831015 & 19,reactor Coolant Subcooling Margin Monitor for Accident Monitoring Instrumentation Declared Inoperable Due to Loss of Plant Computer.Computer Failure Caused by Parity Errors & Vibration + (12:40:19, 14 December 2024)
- 05000327/LER-1995-003-01, :on 950224,inadvertent MFW Isolation Occurred During Testing of Reactor Trip Bypass Breakers.Caused by Failure to Follow Procedures.Individual That Inadvertently Bumped Breaker Close Pushbutton Counseled + (12:40:21, 14 December 2024)
- ML20081M071 + (12:40:23, 14 December 2024)
- 05000251/LER-1983-018-03, /03L-0:on 831011,while Performing Routine Surveillance Test of RHR Pump 4B,416-volt Leads to Motor Failed.Caused by Water in Motor Lead Connection Box.Source of Water Eliminated + (12:40:25, 14 December 2024)
- 05000298/LER-1995-007, :on 950224,iodine Channel of CR Air Sampling Monitor RMV-RM-1 Failed to Meet Calibr Tolerance Required by Sp 6.4.6.3.1 Due to Inadequate Procedure.Sps 6.4.6.3.1 & 6.2.3.3.1 Will Be Revised by 950430 + (12:40:27, 14 December 2024)
- ML20081M031 + (12:40:28, 14 December 2024)
- ML20081M012 + (12:40:29, 14 December 2024)
- ML20081M003 + (12:40:30, 14 December 2024)
- ML20081M001 + (12:40:30, 14 December 2024)
- 05000255/LER-1983-066-03, /03L-0:on 831005,total Leakage from Penetrations & Isolation Valves Exceeded Tech Spec Limit.Caused by Degradation of Seals & Gaskets on Boundaries.Sealing Surfaces & Personnel Air Lock Seal Replaced + (12:40:32, 14 December 2024)
- 05000328/LER-1983-131-03, /03L-0:on 831012,condenser Vacuum Exhaust Flow Rate Monitor Failed to Meet Surveillance Requirements.Caused by Condensate in Sense Lines Giving Flow Transmitter High Readings.No Further Action Required + (12:40:34, 14 December 2024)
- 05000339/LER-1983-071-03, /03L-0:on 831017,control Room Bottled Air Pressurization Sys Fell Below Tech Spec Limit.Caused by Inadvertent Train B Safety Injection.Safety Injection Reset & Sys Repressurized + (12:40:36, 14 December 2024)
- ML20081L995 + (12:40:38, 14 December 2024)
- ML20081L988 + (12:40:39, 14 December 2024)
- ML20081L991 + (12:40:39, 14 December 2024)
- ML20081L986 + (12:40:41, 14 December 2024)
- ML20081L987 + (12:40:41, 14 December 2024)
- ML20081L976 + (12:40:43, 14 December 2024)
- ML20081L978 + (12:40:43, 14 December 2024)