Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- IR 05000254/2020401 + (10:45:43, 14 December 2024)
- ML20083H622 + (10:45:43, 14 December 2024)
- ML20083H614 + (10:45:44, 14 December 2024)
- ML20083H619 + (10:45:44, 14 December 2024)
- ML20083H608 + (10:45:45, 14 December 2024)
- ML20083H601 + (10:45:46, 14 December 2024)
- ML20083H605 + (10:45:46, 14 December 2024)
- ML20083H595 + (10:45:48, 14 December 2024)
- ML20083H594 + (10:45:48, 14 December 2024)
- ML20083H591 + (10:45:49, 14 December 2024)
- RBG-16-630, Interim Deficiency Rept DR-128 Re Stainless Steel Tubing Supplied by Gulfalloy,Hub,Inc & Capital Pipe & Steel. Investigation Incomplete.Interim or Final Status Rept Expected by 840315 + (10:45:50, 14 December 2024)
- ML20083H588 + (10:45:50, 14 December 2024)
- ML20083H578 + (10:45:51, 14 December 2024)
- 05000387/LER-1983-163-03, /03L-0:on 831120,repeated Emergency Outside Air Intake High Radiation Alarms Occurred Contrary to Tech Specs.Caused by Failure of Gm Tube.Tube Replaced,Calibr, Retested & Channel Returned to Svc + (10:45:53, 14 December 2024)
- ML20083H571 + (10:45:54, 14 December 2024)
- ML20083H572 + (10:45:54, 14 December 2024)
- ML20083H570 + (10:45:55, 14 December 2024)
- 05000272/LER-1983-060-03, /03L-0:on 831203,during Routine Surveillance,Vital Heat Trace Channel 602B Failed to Draw Greater than 0.5 Amps as Required.Caused by Connections Exhibiting High Resistance.Terminals Cleaned & Tightened + (10:45:57, 14 December 2024)
- 05000325/LER-1983-062-03, /03L-0:on 831206,exhaust Ventilation Radiation High Instrument 1-D12-RM-N010B Actuated at Setpoint of 13 M/H.Caused by Instrument Setpoint Drift.Adjustments Made + (10:45:58, 14 December 2024)
- 05000370/LER-1983-080-03, /03L-0:on 831122,during Investigation of High Sump Level Alarm,Rcs Valve 2NC-56B Found Leaking Between Body & Diaphragm.Caused by Loosened Valve Bonnet.Valve Diassembled & Valve Diaphragm Replaced + (10:46:00, 14 December 2024)
- ML20083H558 + (10:46:01, 14 December 2024)
- 3F1283-29, Responds to NRC Re Violations Noted in IE Insp Rept 50-302/83-26.Corrective Actions:Review of Tech Spec Amends Expanded to Include Operations Qualified Reviewer & Immediate Temporary Change Issued on 830911 + (10:46:02, 14 December 2024)
- ML20083H557 + (10:46:02, 14 December 2024)
- ML20083H551 + (10:46:03, 14 December 2024)
- ML20083H546 + (10:46:04, 14 December 2024)
- ML20083H548 + (10:46:04, 14 December 2024)
- AECM-84-0029, Forwards Mods to FSAR Chapter 14 Re Startup Test Program. Startup Test 25 on MSIV Function Testing Requires Specific Change to Fsar.Review & Approval Requested by 840127 + (10:46:05, 14 December 2024)
- ML20083H540 + (10:46:05, 14 December 2024)
- ML20083H529 + (10:46:06, 14 December 2024)
- 05000338/LER-1983-084-03, /03L-0:on 831202,fire Door Between Clean Charge Room & Auxiliary Bldg Would Not Latch Automatically.Caused by Loose & Missing Screws on Door Hinges.Screws Tightened & Missing Screws Replaced + (10:46:07, 14 December 2024)
- 05000275/LER-1983-026-03, /03L-0:on 831114,prior to Fuel Load,Power Switch to Plant Vent Iodine Sampler RE-24 Found in Off Position. Caused by Personnel Error During Heavy Const Period. Protective Cover Will Be Placed Over Switch + (10:46:09, 14 December 2024)
- ML20083H523 + (10:46:10, 14 December 2024)
- 05000237/LER-1983-081-03, /03L-0:on 831210,west Side Torus Bulkhead Door Found Open.Caused by Contractor in Area.Operator Immediately Closed & Locked Door,Station Dept Heads Reminded to Inform Personnel & Memo Issued + (10:46:12, 14 December 2024)
- ML20083H520 + (10:46:13, 14 December 2024)
- ML20083H518 + (10:46:14, 14 December 2024)
- 05000366/LER-1983-142-03, /03L-0:on 831208,during Performance of MSIV Leakage Control Sys Operability Procedure,Msiv B Leakage Control Sys Isolation Valve Failed to Complete Full Operating Cycle.Caused by Short in Motor + (10:46:15, 14 December 2024)
- 05000395/LER-1983-133-03, /03L-0:on 831123,boron Injection Tank (Bit) Inadvertently Diluted to 19,700 Ppm While Performing Surveillance Testing.Caused by Lifting of Relief Valve XVR-8925.Boron Concentration Restored + (10:46:17, 14 December 2024)
- 0CAN128309, Informs That Core Damage Estimate Procedure Will Be Developed as Result of Review to Satisfy NUREG-0737,Item II.B.3 Re post-accident Sampling Sys & Address Concerns Raised in 830714 & 1031 Ltrs.Schedule Expected by 840131 + (10:46:18, 14 December 2024)
- 05000370/LER-1983-081-03, /03L-0:on 831125,fire Alarm for Fire Detection Zone Efa 188 Received in Control Room & Would Not Reset. Efa 188 Declared Inoperable.Caused by Dirt Accumulation in One Ionization Type Detector.Detector Replaced + (10:46:21, 14 December 2024)
- ML20083H495 + (10:46:22, 14 December 2024)
- FVY-83-126, Responds to NRC 831115 Request for Util Plans & Schedule to Resolve Outstanding Concerns Re IE Bulletin 80-14 Concerning Facility.Results of Reanalysis Effort & Schedule Will Be Provided by 840315 + (10:46:23, 14 December 2024)
- ML20083H486 + (10:46:23, 14 December 2024)
- ML20083H485 + (10:46:24, 14 December 2024)
- RBG-16-669, Forwards Responses to Draft SER Open Items Identified by Core Performance Branch,Per a Schwencer 831206 Request.Ltr Suppls Info Contained in .Attachment 1 Summarizes Open Items & Indicates Changes to Be Made in FSAR + (10:46:24, 14 December 2024)
- RBG-16-607, Interim Deficiency Rept DR-147 Re Weld at End Attachments of Pipe Support Component Supplied by Bergen-Paterson. Investigation Incomplete.Interim or Final Rept Will Be Submitted by 840223 + (10:46:25, 14 December 2024)
- RBG-16-623, Interim Deficiency Rept DR-148 Re Procurement Document Control of Spare Parts.Investigation Incomplete.Next Rept Expected by 840215 + (10:46:25, 14 December 2024)
- 05000313/LER-1983-028-03, /03L-0:on 831130,during Radwaste Processing,Crack Discovered in Discharge Piping of Clean Waste Transfer Pump P-47B.Probably Caused by Overheating of Pipe During Installation of Valve Along W/Piping Stresses + (10:46:27, 14 December 2024)
- 05000272/LER-1983-062-99, /99X-0:on 831122,triaxial time-history Accelograph Inside Bioshield on 81-ft Elevation of Containment Bldg Failed.Cause Not Stated.Accelerometer Will Be Replaced During Next Outage + (10:46:29, 14 December 2024)
- ML20083H466 + (10:46:30, 14 December 2024)
- ML20083H463 + (10:46:30, 14 December 2024)
- 05000317/LER-1983-062-03, /03L-0:on 831129,post-accident Monitoring Instrumentation Channel X Found Inoperable.Caused by Leaking Variable Leg Drain Valve on Pressurizer Level Transmitter. Bonnet & Plug Assembly Replaced + (10:46:32, 14 December 2024)
- ML20083H458 + (10:46:33, 14 December 2024)