Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20085F018 + (08:35:41, 14 December 2024)
- ML20085F009 + (08:35:41, 14 December 2024)
- ML20085E996 + (08:35:42, 14 December 2024)
- ML20085E998 + (08:35:42, 14 December 2024)
- BECO-LTR-91-132, Monthly Operating Rept for Sept 1991 for Pilgrim Nuclear Power Station + (08:35:43, 14 December 2024)
- ML20085E989 + (08:35:44, 14 December 2024)
- ST-HL-AE-3894, Monthly Operating Repts for Sept 1991 for South Texas Project Electric Generating Station,Units 1 & 2 + (08:35:44, 14 December 2024)
- NRC-91-0113, Monthly Operating Rept for Sept 1991 for Fermi 2 + (08:35:45, 14 December 2024)
- ML20085E985 + (08:35:45, 14 December 2024)
- ML20085E983 + (08:35:47, 14 December 2024)
- ML20085E982 + (08:35:47, 14 December 2024)
- ML20085E981 + (08:35:48, 14 December 2024)
- ML20085E978 + (08:35:49, 14 December 2024)
- ML20085E977 + (08:35:50, 14 December 2024)
- ML20085E976 + (08:35:50, 14 December 2024)
- ML20085E972 + (08:35:51, 14 December 2024)
- ML20085E963 + (08:35:51, 14 December 2024)
- ML20085E961 + (08:35:52, 14 December 2024)
- ML20085E956 + (08:35:53, 14 December 2024)
- ML20085E955 + (08:35:53, 14 December 2024)
- ML20085E954 + (08:35:54, 14 December 2024)
- ML20085E953 + (08:35:54, 14 December 2024)
- ML20085E938 + (08:35:55, 14 December 2024)
- ML20085E943 + (08:35:55, 14 December 2024)
- 1CAN039402, Application for Amend to License DPR-51,revising TS to Permit Spent Fuel Shipping Casks to Be Moved Using Auxiliary Bldg Crane.Evaluation of Worst Case Hypothetical 9 Inch Drop of 100 Ton Cask Encl + (08:35:56, 14 December 2024)
- ML20085E936 + (08:35:57, 14 December 2024)
- ML20085E934 + (08:35:58, 14 December 2024)
- PY-CEI-NRR-1400, Ack Request for Notification of Commencement of Program for Periodic Contact W/Vendors & Informs That Schedule for Implementation of Periodic Vendor Contact Program Extended Until 911220,per 900924 Response to Generic Ltr 90-03 + (08:35:58, 14 December 2024)
- ML20085E930 + (08:35:59, 14 December 2024)
- ML20085E929 + (08:36:00, 14 December 2024)
- ML20085E925 + (08:36:00, 14 December 2024)
- ML20085E922 + (08:36:01, 14 December 2024)
- ML20085E921 + (08:36:02, 14 December 2024)
- ML20085E899 + (08:36:02, 14 December 2024)
- ML20085E885 + (08:36:03, 14 December 2024)
- ML20085E886 + (08:36:03, 14 December 2024)
- ML20085E881 + (08:36:04, 14 December 2024)
- ML20085E875 + (08:36:04, 14 December 2024)
- ML20085E872 + (08:36:05, 14 December 2024)
- ML20085E871 + (08:36:06, 14 December 2024)
- 05000259/LER-1950-259-762, /762:on 760204,design Deficiency Found While Investigating LPCI Loop Selection Logic.Final Rept Will Be Submitted Per 10CFR50.55(e) + (08:36:07, 14 December 2024)
- ML20085E865 + (08:36:08, 14 December 2024)
- ML20085E864 + (08:36:09, 14 December 2024)
- ML20085E861 + (08:36:09, 14 December 2024)
- 05000255/LER-1975-011, LERs 75-011 & 75-012:on 751122,LPSI Pump Seal Leakage Noted During Periodic Test.Caused by Improper O-ring Clearance. Improved Seal Design & Repair Time Reduction Time Will Be Investigated + (08:36:11, 14 December 2024)
- ML20085E850 + (08:36:12, 14 December 2024)
- 05000255/LER-1975-013, :on 751122,passive Containment Sys Leakage at Sample Isolation Valve Found Greater than 1 Gpm.Caused by Valve SS-6H-9-RS-AI-NC Leakage.Valve Temporarily Capped + (08:36:13, 14 December 2024)
- ML20085E841 + (08:36:14, 14 December 2024)
- 05000259/LER-1950-259-763, /763T:on 760213.Condition Determined Not to Be Ro + (08:36:16, 14 December 2024)
- ML20085E833 + (08:36:17, 14 December 2024)
- 05000260/LER-1950-260-763, /763W:on 760412,five Reed Relays Failed.Four Reed Relays Permit Sequential Selection & Withdrawal of Control Rods & One Permits Two Control Rod Simultaneous Withdrawal. Caused by CP Claire Reed Relay Contact Failure + (08:36:18, 14 December 2024)
- ML20085E825 + (08:36:19, 14 December 2024)