Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20085G251 + (08:31:16, 14 December 2024)
- ML20085G242 + (08:31:17, 14 December 2024)
- ML20085G247 + (08:31:17, 14 December 2024)
- ML20085G239 + (08:31:18, 14 December 2024)
- ML20085G231 + (08:31:19, 14 December 2024)
- ML20085G229 + (08:31:19, 14 December 2024)
- ML20085G227 + (08:31:20, 14 December 2024)
- ML20085G226 + (08:31:20, 14 December 2024)
- ML20085G222 + (08:31:21, 14 December 2024)
- ML20085G221 + (08:31:21, 14 December 2024)
- 05000374/LER-1991-011, :on 910906,determined That Drywell Personnel Access Hatch Interlock Surveillance Not Performed Since 901215.Caused by Misinterpretation of TS & Failure to Use General Request Form.Test Performed + (08:31:23, 14 December 2024)
- ML20085G215 + (08:31:26, 14 December 2024)
- ML20085G216 + (08:31:26, 14 December 2024)
- ML20085G212 + (08:31:27, 14 December 2024)
- ML20085G210 + (08:31:28, 14 December 2024)
- ML20085G208 + (08:31:28, 14 December 2024)
- 05000305/LER-1995-003, :on 950516,failed to Adequately Assess Consequences During Recovery from Switch Misposition Resulted in Turbine/Rt.Reminded Nco of Importance of Self Checking + (08:31:30, 14 December 2024)
- 05000374/LER-1991-009, Corrected Ltr Forwarding LER 91-009-00.Original Ltr Contained Error in Rept Number + (08:31:33, 14 December 2024)
- ML20085G201 + (08:31:34, 14 December 2024)
- ML20085G189 + (08:31:35, 14 December 2024)
- ML20085G188 + (08:31:36, 14 December 2024)
- ML20085G186 + (08:31:36, 14 December 2024)
- RBG-41608, Monthly Operating Rept for May 1995 for River Bend Station Unit 1 + (08:31:37, 14 December 2024)
- ML20085G184 + (08:31:38, 14 December 2024)
- NLS9100661, Forwards Addenda to Rev 3 to NPPD Cooper Nuclear Station ISI Progam, Incorporating Exam of Selected Components Supports & Attachments of HPCI Sys Suction Line + (08:31:39, 14 December 2024)
- ML20085G180 + (08:31:39, 14 December 2024)
- NLS9100657, Forwards Addl Info in Response to Suppl 3 to Generic Ltr 89-10 Re motor-operated Valve,Per 911003 Telcon W/Nrc + (08:31:40, 14 December 2024)
- NLS9100667, Forwards Aug 1991 Addenda to Cooper Nuclear Station Inservice Testing Program for ASME Class 1,2 & 3 Components (Rev 6) + (08:31:40, 14 December 2024)
- ML20085G167 + (08:31:41, 14 December 2024)
- ML20085G160 + (08:31:42, 14 December 2024)
- ML20085G161 + (08:31:42, 14 December 2024)
- ML20085G159 + (08:31:43, 14 December 2024)
- ML20085G155 + (08:31:43, 14 December 2024)
- ML20085G153 + (08:31:44, 14 December 2024)
- ML20085G154 + (08:31:44, 14 December 2024)
- ML20085G152 + (08:31:45, 14 December 2024)
- ML20085G149 + (08:31:46, 14 December 2024)
- ML20085G150 + (08:31:46, 14 December 2024)
- HL-1854, Forwards Response to Generic Ltr 91-06, Resolution of Generic Issue A-30, Adequacy of Safety-Related DC Power Supplies + (08:31:47, 14 December 2024)
- ML20085G148 + (08:31:47, 14 December 2024)
- ML20085G145 + (08:31:50, 14 December 2024)
- 2CAN109104, Forwards Annual Rept of Steam Generator Tube Insps for 1991. No Defective Tubes & Less than 5% of Total Tubes Inspected in Steam Generator a Exhibited Any Degradation + (08:31:51, 14 December 2024)
- ML20085G142 + (08:31:52, 14 December 2024)
- ML20085G137 + (08:31:55, 14 December 2024)
- NRC-95-0060, Monthly Operating Rept for May 1995 for Fermi 2 + (08:31:56, 14 December 2024)
- ML20085G127 + (08:31:56, 14 December 2024)
- ML20085G126 + (08:31:57, 14 December 2024)
- 05000321/LER-1995-003-01, :on 950515,trip of Reactor Protection Sys Bus Power Supply Resulted in Actuation of Engineered Safety Features.Calibr Protective Relays in Affected Panel + (08:31:59, 14 December 2024)
- ML20085G122 + (08:31:59, 14 December 2024)
- ML20085G116 + (08:32:00, 14 December 2024)
- ML20085G112 + (08:32:01, 14 December 2024)
- ML20085G113 + (08:32:01, 14 December 2024)