Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- 05000336/LER-1995-012, :on 950313,determined That RPS RCS Low Flow Trip Setting May Not Satisfy Assumptions in Sa.Caused by Excessive Component (Transmitter) Drift & Inadequate Design Review.Rcs Flow Transmitter Recalibrated + (07:23:59, 14 December 2024)
- ML20086E032 + (07:23:59, 14 December 2024)
- 05000271/LER-1975-012, :on 750609,standby Liquid Control Pump B Delivered Flow Rate Above Tech Spec Max.Caused by Failure of Crosby Valve & Gage Relief Valve Model 1x2 to Seat Properly Due to Scored Surfaces.Valve Replaced + (07:24:01, 14 December 2024)
- 05000327/LER-1995-006, :on 950606,determined That Wga (Which Monitors Hydrogen Concentrations) Being Operated Incorrectly.Caused by Design Limitations.Alarm Logic Will Be Reconfigured to Ensure TS Compliance + (07:24:03, 14 December 2024)
- ML20086E018 + (07:24:04, 14 December 2024)
- ML20086E021 + (07:24:04, 14 December 2024)
- 05000328/LER-1995-004-02, :on 950525,observed That Containment Purge Air Inboard Isolation Valve May Not Have Sufficient Clearance for Actuator Proper Function During Loca.Caused by Personnel Error.Clearance Deficiency Corrected + (07:24:06, 14 December 2024)
- PY-CEI-NRR-1416, Responds to Open/Unresolved Items Noted in Insp Rept 50-440/91-13 on 910819-30.Corrective Actions:Labeling Issue Will Be Resolved Via Rev to OAP-0507 & Design Change Will Be Pursued to Install Permanent Storage for Ladders + (07:24:07, 14 December 2024)
- ML20086E015 + (07:24:07, 14 December 2024)
- ML20086E009 + (07:24:08, 14 December 2024)
- 05000498/LER-1991-023, :on 911011,discovered Motor Lead Insulation Cracking on RHR Pumps in Trains a & C.Caused by Differences in Flexibility of Motor Lead Between Original Insulation & Insulation W/Raychem Sleeve.Cracks Repaired + (07:24:10, 14 December 2024)
- ML20086E001 + (07:24:11, 14 December 2024)
- ML20086D999 + (07:24:12, 14 December 2024)
- ML20086D998 + (07:24:12, 14 December 2024)
- ML20086D992 + (07:24:13, 14 December 2024)
- ML20086D990 + (07:24:14, 14 December 2024)
- ML20086D991 + (07:24:14, 14 December 2024)
- ML20086D988 + (07:24:15, 14 December 2024)
- ML20086D981 + (07:24:15, 14 December 2024)
- ML20086D979 + (07:24:16, 14 December 2024)
- ML20086D978 + (07:24:16, 14 December 2024)
- ML20086D972 + (07:24:17, 14 December 2024)
- ML20086D967 + (07:24:17, 14 December 2024)
- ML20086D966 + (07:24:18, 14 December 2024)
- ML20086D965 + (07:24:18, 14 December 2024)
- 05000498/LER-1991-024, :on 911031,discovered That Updated Fsar,Chapter 15 Safety Analysis Did Not Consider Pressurizer Safety Relief Valve Loop Seal Delay Time.Caused by NSSS Vendor Error.Jco Issued on 911105 + (07:24:20, 14 December 2024)
- ML20086D958 + (07:24:21, 14 December 2024)
- TXX-9135, Final Deficiency Rept CP-89-31 Re Tornado Dampers Unable to Travel to Full Open Position Due to Interference from thermolag-installed Adjacent Fire Dampers.Initially Reported on 891030.Condition Not Reportable for Unit 2 + (07:24:21, 14 December 2024)
- 0CAN119103, Submits Results of Review of Exams of Aerosol Cans of Fluorescent Magnetic Particle Prepared Bath,Per NRC Info Notice 91-031.Three Reactor Pressure Vessel Studs & Two Vessel Nuts Examined Using Cans from Recalled Batch + (07:24:22, 14 December 2024)
- ML20086D950 + (07:24:23, 14 December 2024)
- ML20086D953 + (07:24:23, 14 December 2024)
- ML20086D946 + (07:24:25, 14 December 2024)
- ML20086D945 + (07:24:25, 14 December 2024)
- ML20086D940 + (07:24:26, 14 December 2024)
- ML20086D939 + (07:24:27, 14 December 2024)
- ML20086D935 + (07:24:28, 14 December 2024)
- U-602458, Responds to Ltr of 950503 Re Implementation of Access Authorization Program at Plant & Concludes That Concern Not Substantiated .Forwards Investigation Summary & Requests Witholding from Public Disclosure.W/O Encl + (07:24:28, 14 December 2024)
- ML20086D932 + (07:24:29, 14 December 2024)
- ML20086D926 + (07:24:30, 14 December 2024)
- ML20086D923 + (07:24:30, 14 December 2024)
- ML20086D914 + (07:24:31, 14 December 2024)
- ML20086D920 + (07:24:31, 14 December 2024)
- 05000414/LER-1991-012-02, :on 911017,unexpected ESF Actuation Occurred, Resulting in Partial Actuation of ATWS Mitigation Sys & Actuation Circuit.Caused by Functional Design Deficiency in Circuit.Pump 2B Secured & Sys Realigned + (07:24:34, 14 December 2024)
- ML20086D908 + (07:24:35, 14 December 2024)
- ML20086D910 + (07:24:35, 14 December 2024)
- RC-95-0178, Comment on Proposed Review of NRC Insp Rept Content,Format & Style + (07:24:36, 14 December 2024)
- ML20086D903 + (07:24:37, 14 December 2024)
- ML20086D905 + (07:24:37, 14 December 2024)
- ML20086D897 + (07:24:38, 14 December 2024)
- ML20086D899 + (07:24:38, 14 December 2024)
- ML20086D892 + (07:24:39, 14 December 2024)
- ML20086D895 + (07:24:39, 14 December 2024)