Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- L-08-157, Rtl A9.690E, 2007 Radioactive Effluent Release Report and 2007 Annual Radiological Environmental Operating Report, Enclosure 3 + (07:36:36, 13 March 2020)
- NOC-AE-08002298, Transmittal of Annual Environmental and Annual Radiological Environmental Operating Reports for 2007 + (07:41:21, 13 March 2020)
- NL-08-0551, Final Supplemental Response to NRC Generic Letter 2004-02 + (08:00:11, 13 March 2020)
- LR-N08-0074, Three-Month Response to NRC Generic Letter 08-001, Managing Gas Accumulation in Emergency Core Cooling, Decay Heat Removal, and Containment Spray Systems. + (08:18:43, 13 March 2020)
- LR-N08-0073, Transmittal of Three Month Response to NRC Generic Letter 2008-01, Managing Gas Accumulation in Emergency Core Cooling, Decay Heat Removal, and Containment Spray Systems + (08:20:33, 13 March 2020)
- ML081090479 + (08:31:09, 13 March 2020)
- L-08-133, Three Month Response to NRC GL-08-001, Managing Gas Accumulation in Emergency Core Cooling, Decay Heat Removal, and Containment Spray Systems. + (08:34:12, 13 March 2020)
- GO2-08-054, Three Month Response to NRC Generic Letter 2008-01, Managing Gas Accumulation in Emergency Core Cooling, Decay Heat Removal, and Containment Spray Systems + (08:35:40, 13 March 2020)
- NOC-AE-08002286, Response to Request for Additional Information for Request for Exemption from 10 CFR 50.82(a)(8) (TAC No. MD6869/MD6870) + (08:38:01, 13 March 2020)
- L-08-132, Three Month Response to NRC Generic Letter 2008-01, Managing Gas Accumulation in Emergency Core Cooling, Decay Heat Removal, and Containment Spray Systems + (08:40:33, 13 March 2020)
- L-08-131, Three Month Response to NRC Generic Letter 2008-01, Managing Gas Accumulation in Emergency Core Cooling, Decay Heat Removal and Containment Spray Systems + (08:40:44, 13 March 2020)
- L-2008-076, Extension Request Regarding the Three Month Response to NRC Generic Letter 2008-01, Managing Gas Accumulation in Emergency Core Cooling, Decay Heat Removal, and Containment Spray Systems + (08:43:02, 13 March 2020)
- RS-08-050, Amergen Energy Co, Llc., Three Month Response to Generic Letter 2008-01, Managing Gas Accumulation in Emergency Core Cooling, Decay Heat Removal, and Containment Spray Systems. + (08:46:10, 13 March 2020)
- ML081010150 + (08:49:53, 13 March 2020)
- ULNRC-05481, Response to Request for Additional Information Regarding Response for NRC Generic Letter 2004-002, Potential Impact of Debris Blockage on Emergency Recirculation During Design Basis Accidents at Pressurized-Water Reactors. + (09:35:45, 13 March 2020)
- LR-N08-0043, Supplemental Response to NRC Generic Letter 2004-02, Potential Impact of Debris Blockage on Emergency Recirculation During Design Basis Accidents at Pressurized-Water Reactors. + (09:38:32, 13 March 2020)
- ML080790255 + (09:42:01, 13 March 2020)
- NOC-AE-08002255, Transmittal of Proposed Amendment to Technical Specification 3.8.3.1 + (09:50:19, 13 March 2020)
- RNP-RA/08-0026, Supplemental Response to GL-04-002, Potential Impact of Debris Blockage on Emergency Recirculation During Design Basis Accidents at Pressurized-Water Reactors + (09:52:35, 13 March 2020)
- L-2008-033, Supplemental Response to NRC Generic Letter 2004-02, Potential Impact of Debris Blockage on Emergency Recirculation During Design Basis Accidents at Pressurized-Water Reactors. + (09:58:36, 13 March 2020)
- NL-08-025, Supplemental Response to GL-04-002, Potential Impact of Debris Blockage on Emergency Recirculation During Design Basis Accidents at Pressurized-Water Reactors + (10:07:22, 13 March 2020)
- NL-08-0300, Response to NRC Request for Additional Information Regarding License Amendment Request to Revise Technical Specification (TS) 3.3.2, ESFAS Instrumentation, and TS 3.5.4, Refueling Water Storage Tank (Rwst). + (10:10:14, 13 March 2020)
- L-2008-030, Supplemental Response to NRC Generic Letter 2004-02, Potential Impact of Debris Blockage on Emergency Recirculation During Design Basis Accidents at Pressurized-Water Reactors + (10:13:48, 13 March 2020)
- LIC-08-0021, Supplemental Response to Generic Letter 2004-02, Potential Impact of Debris Blockage on Emergency Recirculation During Design Basis Accidents at Pressurized-Water Reactors + (10:15:03, 13 March 2020)
- L-08-036, Supplemental Response to GL-04-002, Potential Impact of Debris Blockage on Emergency Recirculation During Design Basis Accidents at Pressurized Water Reactors + (10:15:15, 13 March 2020)
- RC-08-0031, Supplemental Response to NRC Generic Letter 2004-02: Potential Impact of Debris Blockage on Emergency Recirculation During Design Basis Accidents at Pressurized-Water Reactors + (10:19:29, 13 March 2020)
- SBK-L-08033, Supplemental Response to NRC Generic Letter 2004-02, Potential Impact of Debris Blockage on Emergency Recirculation During Design Basis Accidents at Pressurized-Water Reactors. + (10:23:09, 13 March 2020)
- NL-08-0207, Report of Facility Changes, Tests, and Experiments Safety Evaluation Summaries + (10:24:30, 13 March 2020)
- NL-08-0316, Technical Justification Regarding Scope Expansion for Dissimilar Metal Weld Examination + (10:24:37, 13 March 2020)
- L-PI-08-009, Supplemental Response to Generic Letter 2004-02, Potential Impact of Debris Blockage on Emergency Recirculation During Design Basis Accidents at Pressurized-Water Reactors. + (10:27:15, 13 March 2020)
- NOC-AE-08002266, Nuclear Insurance Protection + (10:36:31, 13 March 2020)
- ULNRC-05472, Response to NRC Bulletin 2007-01, Security Officer Attentiveness. + (10:42:22, 13 March 2020)
- RBG-46788, Response to NRC Bulletin 2007-01, Security Officer Inattentiveness + (10:49:55, 13 March 2020)
- TAC:MA8585 + (10:56:08, 13 March 2020)
- RA-08-013, Company, Llc/Amergen Energy Company, LLC - 60-Day Response to NRC Bulletin 2007-01, Security Officer Attentiveness + (10:58:02, 13 March 2020)
- ML080390256 + (11:05:57, 13 March 2020)
- NOC-AE-08002256, Submittal of Revised Operations Quality Assurance Plan + (11:41:06, 13 March 2020)
- EPID:L-2020-LLA-0005 + (11:50:01, 13 March 2020)
- ML080220327 + (11:54:20, 13 March 2020)
- ML080220270 + (11:54:32, 13 March 2020)
- LR-N07-0304, Request for Extension of Completion Dates for Corrective Actions Required by NRC Generic Letter 2004-02, Potential Impact of Debris Blockage on Emergency Recirculation During Design Basis Accidents at Pressurized-Water Reactors + (12:22:28, 13 March 2020)
- NOC-AE-07002239, Correction of Statements Made in Relief Request RR-ENG-2-15 + (12:26:32, 13 March 2020)
- EPID:L-2020-LLA-0020 + (12:50:27, 13 March 2020)
- ML073270007 + (13:05:25, 13 March 2020)
- NOC-AE-07002208, Proposed Amendment to Technical Specification 3/4.8.2 to Modify Battery Surveillance Requirements + (13:15:51, 13 March 2020)
- 3F1107-04, Drawing P1-305-832, Rev. 5, Feed Water from Heater 6A to Penetration 423. + (13:40:34, 13 March 2020)
- ULNRC-05448, Responses to Requests for Additional Information Regarding Generic Letter 2003-01, Control Room Habitability + (13:42:26, 13 March 2020)
- EPID:L-2020-LLQ-0000 + (13:59:39, 13 March 2020)
- TAC:MD0561 + (15:33:05, 13 March 2020)
- NL-07-1608, Request Relief, RR-55, Temporary Non-Code Repair of Service Water Piping + (15:45:09, 13 March 2020)
- NOC-AE-07002195, Inservice Inspection Summary Report - 2RE12 + (16:51:24, 13 March 2020)