Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- NL-15-183, Watts Bar Nuclear Plant, Unit 2, Amendment 114 to Final Safety Analysis Report, Section 14.0 - Initial Test Program + (08:06:11, 13 July 2018)
- NL-15-183, Watts Bar Nuclear Plant, Unit 2, Amendment 114 to Final Safety Analysis Report, Section 13.0 - Conduct of Operations + (08:06:17, 13 July 2018)
- NL-15-183, Watts Bar Nuclear Plant, Unit 2, Amendment 114 to Final Safety Analysis Report, Section 12.0 - Radiation Protection + (08:06:24, 13 July 2018)
- NL-15-183, Watts Bar Nuclear Plant, Unit 2, Amendment 114 to Final Safety Analysis Report, Section 11.0 - Radioactive Waste Management + (08:06:35, 13 July 2018)
- NL-15-183, Watts Bar Nuclear Plant, Unit 2, Amendment 114 to Final Safety Analysis Report, Section 9.0 - Auxiliary Systems, Pages 9.4-1 - 9.5-66 + (08:07:06, 13 July 2018)
- NL-15-183, Watts Bar Nuclear Plant, Unit 2, Amendment 114 to Final Safety Analysis Report, Section 6.0 - Engineered Safety Features, Pages 6.3-1 - 6.9-2 + (08:08:14, 13 July 2018)
- NL-15-183, Watts Bar Nuclear Plant, Unit 2, Amendment 114 to Final Safety Analysis Report, Section 6.0 - Engineered Safety Features, Pages 6-iv - 6.2.6-30 + (08:08:36, 13 July 2018)
- NL-15-183, Watts Bar Nuclear Plant, Unit 2, Amendment 114 to Final Safety Analysis Report, Section 3.0 - Design of Structures, Components, Equipment, and Systems, Pages 3.8.5-1 - 3.12-6 + (08:09:22, 13 July 2018)
- NL-15-183, Watts Bar Nuclear Plant, Unit 2, Amendment 114 to Final Safety Analysis Report, Section 3.0 - Design of Structures, Components, Equipment, and Systems, Pages 3.8.1-1 - 3.8.4-182 + (08:09:27, 13 July 2018)
- NL-15-183, Watts Bar Nuclear Plant, Unit 2, Amendment 114 to Final Safety Analysis Report, Section 3.0 - Design of Structures, Components, Equipment, and Systems, Pages 3.6-1 - 3.7-223 + (08:09:35, 13 July 2018)
- NL-15-183, Watts Bar Nuclear Plant, Unit 2, Amendment 114 to Final Safety Analysis Report, Section 2.5 - Geology, Seismology, and Geotechnical Engineering Summary of Foundation Conditions, Pages 2.5-467 - 2.5-952 + (08:09:53, 13 July 2018)
- NL-15-183, Watts Bar Nuclear Plant, Unit 2, Amendment 114 to Final Safety Analysis Report, Section 2.5 - Geology, Seismology, and Geotechnical Engineering Summary of Foundation Conditions, Pages 2.5-205 - 2.5-466 + (08:10:00, 13 July 2018)
- NL-15-183, Watts Bar Nuclear Plant, Unit 2, Amendment 114 to Final Safety Analysis Report, Section 2.5 - Geology, Seismology, and Geotechnical Engineering Summary of Foundation Conditions, Pages 2.5-1 - 2.5-204 + (08:10:09, 13 July 2018)
- NL-15-183, Watts Bar Nuclear Plant, Unit 2, Amendment 114 to Final Safety Analysis Report, Section 2.4 - Hydrologic Engineering, Pages 2.4A-1 -2.4A-32 + (08:10:15, 13 July 2018)
- NL-15-183, Watts Bar Nuclear Plant, Unit 2, Amendment 114 to Final Safety Analysis Report, Section 2.4 - Hydrologic Engineering, Pages 2.4-254 - 2.4-305 + (08:10:20, 13 July 2018)
- NL-15-183, Watts Bar Nuclear Plant, Unit 2, Amendment 114 to Final Safety Analysis Report, Section 2.4 - Hydrologic Engineering, Pages 2.4-210 - 2.4-253 + (08:10:25, 13 July 2018)
- NL-15-183, Watts Bar Nuclear Plant, Unit 2, Amendment 114 to Final Safety Analysis Report, Section 2.4 - Hydrologic Engineering, Pages 2.4-198 - 2.4-209 + (08:10:29, 13 July 2018)
- NL-15-183, Watts Bar Nuclear Plant, Unit 2, Amendment 114 to Final Safety Analysis Report, Section 2.4 - Hydrologic Engineering, Pages 2.4-186 - 2.4-197 + (08:10:34, 13 July 2018)
- NL-15-183, Watts Bar Nuclear Plant, Unit 2, Amendment 114 to Final Safety Analysis Report, Section 2.4 - Hydrologic Engineering, Pages 2.4-158 - 2.4-171 + (08:10:46, 13 July 2018)
- NL-15-183, Watts Bar Nuclear Plant, Unit 2, Amendment 114 to Final Safety Analysis Report, Section 2.4 - Hydrologic Engineering, Pages 2.4-144 - 2.4-157 + (08:10:50, 13 July 2018)
- NL-15-183, Watts Bar Nuclear Plant, Unit 2, Amendment 114 to Final Safety Analysis Report, Section 2.4 - Hydrologic Engineering, Pages 2.4-1- 2-4-143 + (08:10:58, 13 July 2018)
- NL-15-183, Watts Bar Nuclear Plant, Unit 2, Amendment 114 to Final Safety Analysis Report, Section 1.0 - Introduction and General Description of Plant + (08:11:17, 13 July 2018)
- NL-15-183, Watts Bar Nuclear Plant, Unit 2, Amendment 114 to Final Safety Analysis Report, List of Revised Pages + (08:11:22, 13 July 2018)
- NL-15-183, Submittal of Watts Bar Nuclear Plant, Unit 2, Amendment 114 to Final Safety Analysis Report + (08:11:32, 13 July 2018)
- NL-15-105, Indian Points, Units 1, 2, and 3 - Request to Update Records + (08:54:47, 13 July 2018)
- NL-15-156, Sequoyah Nuclear Plants, Units 1 and 2 - Technical Specifications Conversion to NUREG-1431, Rev. 4.0 (SQN-TS-11-10) - Supplement 3. Part 8 of 9 + (09:17:39, 13 July 2018)
- NL-15-156, Sequoyah Nuclear Plants, Units 1 and 2 - Technical Specifications Conversion to NUREG-1431, Rev. 4.0 (SQN-TS-11-10) - Supplement 3. Part 7 of 9 + (09:17:53, 13 July 2018)
- NL-15-156, Sequoyah Nuclear Plants, Units 1 and 2 - Technical Specifications Conversion to NUREG-1431, Rev. 4.0 (SQN-TS-11-10) - Supplement 3. Part 6 of 9 + (09:18:16, 13 July 2018)
- NL-15-156, Sequoyah Nuclear Plants, Units 1 and 2 - Technical Specifications Conversion to NUREG-1431, Rev. 4.0 (SQN-TS-11-10) - Supplement 3. Part 5 of 9 + (09:18:38, 13 July 2018)
- NL-15-156, Sequoyah Nuclear Plants, Units 1 and 2 - Technical Specifications Conversion to NUREG-1431, Rev. 4.0 (SQN-TS-11-10) - Supplement 3. Part 4 of 9 + (09:19:00, 13 July 2018)
- NL-15-156, Sequoyah Nuclear Plants, Units 1 and 2 - Technical Specifications Conversion to NUREG-1431, Rev. 4.0 (SQN-TS-11-10) - Supplement 3. Part 3 of 9 + (09:19:24, 13 July 2018)
- NL-15-156, Sequoyah Nuclear Plants, Units 1 and 2 - Technical Specifications Conversion to NUREG-1431, Rev. 4.0 (SQN-TS-11-10) - Supplement 3. Part 2 of 9 + (09:19:50, 13 July 2018)
- NL-15-156, Sequoyah Nuclear Plants, Units 1 and 2 - Technical Specifications Conversion to NUREG-1431, Rev. 4.0 (SQN-TS-11-10) - Supplement 3. Part 1 of 9 + (09:20:16, 13 July 2018)
- NL-14-123, Browns Ferry Plant, Units 1, 2 & 3, Sequoyah Units 1 & 2 and Watts Bar Unit 1, Submittal of Central Emergency Control Center Operations Procedure Revision + (09:22:21, 13 July 2018)
- NL-15-128, Sequoyah Nuclear Plants, Units 1 and 2 Technical Specifications Conversion to NUREG-1431, Rev. 4.0 (SQN-TS-11-10) - Supplement 2. Part 7 of 8 + (09:52:39, 13 July 2018)
- NL-15-128, Sequoyah Nuclear Plants, Units 1 and 2 Technical Specifications Conversion to NUREG-1431, Rev. 4.0 (SQN-TS-11-10) - Supplement 2. Part 5 of 8 + (09:52:54, 13 July 2018)
- NL-15-128, Sequoyah Nuclear Plants, Units 1 and 2 Technical Specifications Conversion to NUREG-1431, Rev. 4.0 (SQN-TS-11-10) - Supplement 2. Part 4 of 8 + (09:53:14, 13 July 2018)
- NL-15-128, Sequoyah Nuclear Plants, Units 1 and 2 Technical Specifications Conversion to NUREG-1431, Rev. 4.0 (SQN-TS-11-10) - Supplement 2. Part 3 of 8 + (09:53:35, 13 July 2018)
- NL-15-128, Sequoyah Nuclear Plants, Units 1 and 2 Technical Specifications Conversion to NUREG-1431, Rev. 4.0 (SQN-TS-11-10) - Supplement 2. Part 2 of 8 + (09:53:44, 13 July 2018)
- NL-15-128, Sequoyah Nuclear Plants, Units 1 and 2 Technical Specifications Conversion to NUREG-1431, Rev. 4.0 (SQN-TS-11-10) - Supplement 2. Part 1 of 8 + (09:53:54, 13 July 2018)
- RC-15-0076, VC Summer 2015-301 Initial Examination 2015-301 Final RO Written Exam + (10:04:51, 13 July 2018)
- RC-15-0084, Virgil C. Summer - Final Safety Analysis Report (Fsar)/Fire Protection Evaluation Report (Fper), Updated Through May 31, 2015, Cover + (10:13:45, 13 July 2018)
- ULNRC-06217, Callaway, Unit 1 - Submittal of 2014 Annual Radiological Environmental Operating Report + (11:26:36, 13 July 2018)
- ULNRC-06216, Callaway, Unit 1 - Submittal of 2014 Annual Radioactive Effluent Release Report + (11:26:58, 13 July 2018)
- NL-15-020, Indian Point, Unit 2 - Submittal of Netco Report NET-300067-01, Revision 1, Criticality Safety Analysis of the Indian Point, Unit 2 Spent Fuel Pool with Credit for Inserted Neutron Absorber Panels + (13:03:23, 13 July 2018)
- RC-15-0020, Attachment 4 - First Inservice Inspection for Steam Generator a + (13:05:21, 13 July 2018)
- RC-15-0020, Attachment 3 - Final NDE Inspection Reports + (13:05:27, 13 July 2018)
- RC-15-0020, Attachment 2 - Ihi Southwest Inner Diameter Examination Data, Part 2 of 2 + (13:05:35, 13 July 2018)
- ULNRC-06177, Callaway Nuclear Plant - Operating Quality Assurance Manual, Rev. 031 + (13:32:59, 13 July 2018)
- ULNRC-06177, Callaway Nuclear Plant - Operating Quality Assurance Manual, Rev. 030c + (13:33:10, 13 July 2018)
- RC-14-0191, Enclosure 5 - Alert and Notification System Design Report December 2014 + (14:11:09, 13 July 2018)