Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20092K203 + (16:06:49, 13 December 2024)
- ML20092K197 + (16:06:50, 13 December 2024)
- ML20092K199 + (16:06:50, 13 December 2024)
- ML20092K192 + (16:06:51, 13 December 2024)
- 05000336/LER-1995-034, :on 950822,TS Surveillance Was Missed Due to Personnel Error.Performed Surveillance Shortly After Time Interval Had Expired + (16:06:53, 13 December 2024)
- 0CAN068410, Ack Receipt of 840511 Request That Next Annual FSAR Update Include Details of Operator Replacement & Requalification Program,Per Generic Ltr 84-14.Issue Will Be Addressed in 1984-85 FSAR Update to Be Submitted by 850722 + (16:06:54, 13 December 2024)
- BECO-LTR-95-098, Provides Status on Possible Closure of South Weymouth Naval Air Station & Impact on Emergency Planning Efforts at Plant + (16:06:55, 13 December 2024)
- W3P84-1737, Responds to Generic Ltr 83-28,Items 4.2.3 & 4.2 4 Re Life Cycle Testing & Periodic Replacement Requirements for Reactor Trip Breakers.Util Will Provide Program & Schedule to Complete Section Requirements by 841130 + (16:06:55, 13 December 2024)
- RC-95-0232, Advises That Util Has Not Received Written Response to & Has Performed Addl Reviews of Issue of Spurious Closure of Valves XVG-8133A or B & Determeined That C/As Not Justified Considering Cost Vs Possible Safety Benefit + (16:06:56, 13 December 2024)
- ML20092K162 + (16:06:57, 13 December 2024)
- ML20092K164 + (16:06:57, 13 December 2024)
- 2CAN029205, Monthly Operating Rept for Jan 1992 for Arkansas Nuclear One Unit 2 + (16:06:58, 13 December 2024)
- ML20092K119 + (16:06:59, 13 December 2024)
- ML20092K146 + (16:06:59, 13 December 2024)
- RBG-18070, Final Deficiency Rept DR-121 Re Motor Control Ctr Equipment Wiring & Intermittent 49X Relay Contact Supplied by Gould, Inc.Wiring Difference Does Not Affect Safe Operation. Condition Not Reportable Per 10CFR50.55(e) + (16:07:00, 13 December 2024)
- ML20092K107 + (16:07:01, 13 December 2024)
- ML20092K105 + (16:07:02, 13 December 2024)
- ML20092K095 + (16:07:03, 13 December 2024)
- ML20092K094 + (16:07:03, 13 December 2024)
- 05000366/LER-1984-005, :on 840525,standby Liquid Control Sys Prvs Lifted at Lower than Expected Pressure When Bench Tested. Design Change Initiated to Replace Existing Prvs W/Prvs of Different Model.One Prv Replaced Thus Far + (16:07:05, 13 December 2024)
- PY-CEI-NRR-1985, Provides Suppl Info Re License Amend Application to Revise License to Reflect Proposed Merger of Operating Companies + (16:07:06, 13 December 2024)
- ML20092K085 + (16:07:07, 13 December 2024)
- ML20092K072 + (16:07:08, 13 December 2024)
- ML20092K076 + (16:07:08, 13 December 2024)
- NG-95-2236, Requests for Relief from ASME Section XI requirements:NDE- 012 Through NDE-018 + (16:07:09, 13 December 2024)
- PLA-7853, Ninety-Day Response to Request for Additional Information Regarding Proposed License Amendment Requesting Application of Advanced Framatome Methodologies PLA-7853 + (16:07:10, 13 December 2024)
- ML20092K061 + (16:07:11, 13 December 2024)
- ML20092K056 + (16:07:12, 13 December 2024)
- ML20092K058 + (16:07:12, 13 December 2024)
- ML20092K048 + (16:07:13, 13 December 2024)
- NG-95-2805, Monthly Operating Rept for Aug 1995 for Daec + (16:07:14, 13 December 2024)
- ML20092K046 + (16:07:14, 13 December 2024)
- ML20092K040 + (16:07:15, 13 December 2024)
- L-20-118, CFR 50.55a Request Number SRR-1, Revision 0, Snubber Testing + (16:07:16, 13 December 2024)
- ML20092K027 + (16:07:17, 13 December 2024)
- 05000259/LER-1984-024-01, :on 840602,increase in Conductance of Stator Cooling Water Teflon Insulating Connector Tubing Caused Turbine Generator Trip.Probably Caused by Interior Deposits of Iron & Copper.Sys Flushed + (16:07:19, 13 December 2024)
- ML20092K020 + (16:07:20, 13 December 2024)
- ML20092K006 + (16:07:21, 13 December 2024)
- ML20092K000 + (16:07:21, 13 December 2024)
- ML20092J999 + (16:07:22, 13 December 2024)
- ML20092J988 + (16:07:23, 13 December 2024)
- ML20092J989 + (16:07:23, 13 December 2024)
- ML20092J981 + (16:07:24, 13 December 2024)
- ML20092J977 + (16:07:24, 13 December 2024)
- ML20092J966 + (16:07:25, 13 December 2024)
- ML20092J962 + (16:07:26, 13 December 2024)
- ML20092J949 + (16:07:27, 13 December 2024)
- ML20092J947 + (16:07:27, 13 December 2024)
- ML20092J946 + (16:07:28, 13 December 2024)
- ML20092J945 + (16:07:28, 13 December 2024)
- ML20092J943 + (16:07:29, 13 December 2024)