Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20092M821 + (15:56:52, 13 December 2024)
- DCL-20-021, Submittal of 2020 Annual Statement of Insurance for Pacific Gas and Electric Companys Diablo Canyon Power Plant and Humboldt Bay Power Plant + (15:56:53, 13 December 2024)
- ML20092M817 + (15:56:56, 13 December 2024)
- 05000483/LER-1992-003, :on 920123,during Startup,Closure of Feedwater Bypass Control Valves to Control SG Level Led to Turbine Trip.Caused by Attempt to Maintain Reactor/Turbine Power at Low Loads.Ts 3.2.2 to Be Revised + (15:56:58, 13 December 2024)
- 05000220/LER-1981-055-03, /03L-0:on 810605,visual Insp of Doors & Access Openings for Adequacy of Sealing Documented,But No Record Made of Test Using DOP & Freon.Caused by Vagueness in Procedure NI-RTP-38.Procedure Revised + (15:57:00, 13 December 2024)
- ML20092M802 + (15:57:01, 13 December 2024)
- ML20092M801 + (15:57:02, 13 December 2024)
- ML20092M787 + (15:57:03, 13 December 2024)
- ML20092M799 + (15:57:03, 13 December 2024)
- ML20092M785 + (15:57:04, 13 December 2024)
- ML20092M781 + (15:57:05, 13 December 2024)
- ML20092M769 + (15:57:05, 13 December 2024)
- ML20092M768 + (15:57:06, 13 December 2024)
- ML20092M767 + (15:57:07, 13 December 2024)
- ML20092M764 + (15:57:07, 13 December 2024)
- ML20092M757 + (15:57:08, 13 December 2024)
- BSEP-84-1482, Special Rept 2-SR-84-8:on 840519,fire Barrier Limiting Condition for Operation Issued to Permit Removal of Fire Barrier Located at Seal SW-3-022.Specified Time Frame Exceeded.Fire Watches Established Until Work Completed + (15:57:10, 13 December 2024)
- ML20092M752 + (15:57:10, 13 December 2024)
- ULNRC-03270, Submits Westinghouse Alloy 600 Re Steam Generator Mechanical Plugs.Util Currently Plans to Replace or Repair Plugs During Refuel 8 or Refuel 9 + (15:57:11, 13 December 2024)
- ML20092M747 + (15:57:12, 13 December 2024)
- ML20092M744 + (15:57:13, 13 December 2024)
- ML20092M736 + (15:57:13, 13 December 2024)
- ML20092M733 + (15:57:14, 13 December 2024)
- ML20092M730 + (15:57:18, 13 December 2024)
- 1CAN068406, Monthly Operating Rept for May 1984 + (15:57:19, 13 December 2024)
- U-602496, Forwards Proposed Change to QA Program Description Re Method Proposes to Use to Meet Procedure Adherence Guidelines Contained in ANSI N18.7-1976, Administrative Controls & QA for Operational Phase of Nuclear Power Plants + (15:57:22, 13 December 2024)
- BSEP-95-0501, Forwards Revs to Plant Emergency Procedures & Rev 42 to Radiological Emergency Response Plan + (15:57:23, 13 December 2024)
- 05000397/LER-1984-048, :on 840530,fuses Used in Class IE 250-volt Dc Sys Discovered Inappropriately Applied.Portions of Fuses Required to Return 250-volt Sys to within Design Basis Immediately Replaced.Balance Fuses Rescheduled + (15:57:24, 13 December 2024)
- ML20092M711 + (15:57:25, 13 December 2024)
- ML20092M710 + (15:57:26, 13 December 2024)
- ML20092M707 + (15:57:27, 13 December 2024)
- 05000220/LER-1982-024-03, /03L-0:on 840521,discovered That Documentation of Reactor Bldg Emergency Ventilation Sys Surveillance Test on 821019 Indicated Visual Insp Only of Doors & Access Openings for Sealing Adequacy + (15:57:28, 13 December 2024)
- ML20092M702 + (15:57:30, 13 December 2024)
- RBG-18073, Deficiency Rept DR-195 Re Insulation for Motors of Valves Supplied by Velan Engineering,Limited.Interim or Final Rept Will Be Provided by 840912 + (15:57:30, 13 December 2024)
- ML20092M695 + (15:57:31, 13 December 2024)
- ML20092M698 + (15:57:31, 13 December 2024)
- ML20092M686 + (15:57:35, 13 December 2024)
- ML20092M687 + (15:57:35, 13 December 2024)
- ML20092M684 + (15:57:37, 13 December 2024)
- RBG-18076, Interim Deficiency Rept DR-159 Re Standby Liquid Control Sys Explosive Valve Circuit Fuses.Next Rept Will Be Submitted by 840719 + (15:57:38, 13 December 2024)
- 05000220/LER-1984-007, :on 840521,during Refueling Outage,After Control Rod Scram Time Testing Performed,Two High Pressure Reactor Scrams Occurred.Cause Not Stated.Procedural Changes Incorporated + (15:57:39, 13 December 2024)
- ML20092M677 + (15:57:43, 13 December 2024)
- ML20092M676 + (15:57:43, 13 December 2024)
- ML20092M672 + (15:57:44, 13 December 2024)
- ML20092M674 + (15:57:44, 13 December 2024)
- ML20092M670 + (15:57:45, 13 December 2024)
- ML20092M668 + (15:57:46, 13 December 2024)
- ML20092M669 + (15:57:46, 13 December 2024)
- ML20092M663 + (15:57:47, 13 December 2024)
- AECM-84-0308, Submits Partial Response to IE Bulletin 83-08, Electrical Circuit Breakers W/Undervoltage Trip Feature in Use in Safety-Related Applications Other than Reactor Trip Sys. Eight Breakers Used in Unit 1 Electrical Assemblies + (15:57:48, 13 December 2024)
- ML20092M649 + (15:57:50, 13 December 2024)