Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20092P234 + (15:51:47, 13 December 2024)
- ML20092P227 + (15:51:48, 13 December 2024)
- W3P84-1811, Agrees to Complete Continuing Study of Single Failures of Control Sys & Correct Resulting Deficiencies Prior to Startup Following First Refueling.Action Should Close Out SER Open Item 7.1.2(6) + (15:51:49, 13 December 2024)
- ML20092P225 + (15:51:49, 13 December 2024)
- ML20092P220 + (15:51:51, 13 December 2024)
- ML20092P221 + (15:51:51, 13 December 2024)
- ML20092P218 + (15:51:52, 13 December 2024)
- ML20092P216 + (15:51:53, 13 December 2024)
- ML20092P211 + (15:51:54, 13 December 2024)
- ML20092P210 + (15:51:54, 13 December 2024)
- ML20092P209 + (15:51:55, 13 December 2024)
- ML20092P208 + (15:51:56, 13 December 2024)
- ML20092P205 + (15:51:56, 13 December 2024)
- ML20092P204 + (15:51:57, 13 December 2024)
- AECM-84-0181, Responds to NRC Re Violations Noted in IE Insp Repts 50-416/84-01 & 50-417/84-02.Corrective Actions: Emergency Plan Procedure 10-S-01-05, General Emergency, Revised + (15:51:58, 13 December 2024)
- 05000280/LER-1984-015, :on 840613,control Room Operator Observed Loss of Main Feed Pump a & Lowering of Steam Generator Water Levels.Caused by Loosening of Bearing Capscrews.Capscrew & Bolt Torque Specified in Maint Procedure + (15:52:00, 13 December 2024)
- AECM-84-0127, Responds to NRC Re Violations Noted in IE Insp Repts 50-416/84-01 & 50-417/84-02.Corrective Actions:Rev to Emergency Plan Procedure 10-S-01-05, General Emergency, Prepared for Issuance by 840615 + (15:52:01, 13 December 2024)
- ML20092P182 + (15:52:01, 13 December 2024)
- W3P84-1805, Forwards Proposed FSAR Chapter 14 Changes Re Venting of Sys During Hydrostatic Testing & Testing of nonsafety-related Supplementary Chilled Water Sys.Changes Will Be Incorporated in Future FSAR Amend + (15:52:02, 13 December 2024)
- ML20092P177 + (15:52:03, 13 December 2024)
- ML20092P167 + (15:52:03, 13 December 2024)
- ML20092P164 + (15:52:04, 13 December 2024)
- ML20092P162 + (15:52:05, 13 December 2024)
- ML20092P161 + (15:52:05, 13 December 2024)
- ML20092P159 + (15:52:06, 13 December 2024)
- ML20092P156 + (15:52:07, 13 December 2024)
- AECM-84-0326, Describes Design Change Problems & Provides Commitment Dates for Resolution of Tech Spec Problem Sheets,Per Review + (15:52:08, 13 December 2024)
- PLA-2229, Ro:On 840528,turbine Bypass Valve Malfunctioned,Causing Reactor to Exceed Max Allowable Power of 5% by 0.9%.Caused by Debris Found in Turbine Bypass Valve.Control Rods Inserted + (15:52:08, 13 December 2024)
- ML20092P153 + (15:52:09, 13 December 2024)
- ML20092P151 + (15:52:10, 13 December 2024)
- ML20092P097 + (15:52:14, 13 December 2024)
- ML20092P095 + (15:52:14, 13 December 2024)
- ML20092P092 + (15:52:15, 13 December 2024)
- RS-20-046, Emergency License Amendment Request - Increase Technical Specifications Allowable MSIV Leakage Rates in TS 3.6.1.3 + (15:52:16, 13 December 2024)
- ML20092P056 + (15:52:16, 13 December 2024)
- ML20092P027 + (15:52:17, 13 December 2024)
- ML20092N999 + (15:52:18, 13 December 2024)
- ML20092P025 + (15:52:18, 13 December 2024)
- ML20092N976 + (15:52:26, 13 December 2024)
- ML20092N962 + (15:52:27, 13 December 2024)
- ML20092N961 + (15:52:27, 13 December 2024)
- ML20092N941 + (15:52:28, 13 December 2024)
- NLS8400092, Repsonds to NRC Re Violations Noted in IE Insp Rept 50-298/83-28.Corrective Actions Withheld (Ref 10CFR73.21) + (15:52:29, 13 December 2024)
- ML20092N930 + (15:52:29, 13 December 2024)
- ML20092N929 + (15:52:30, 13 December 2024)
- ML20092N921 + (15:52:31, 13 December 2024)
- ML20092N922 + (15:52:31, 13 December 2024)
- 0CAN058402, Annual Environ Radiological Monitoring Rept,1983 + (15:52:32, 13 December 2024)
- ML20092N917 + (15:52:33, 13 December 2024)
- 0CAN058412, Submits Updated Status of Efforts to Implement Final Phase of Upgrade to Security Sys.Original Schedule Submitted on 830219.Addl 60 man-months Required to Complete Software Development + (15:52:34, 13 December 2024)
- ML20092N901 + (15:52:34, 13 December 2024)
- ML20092N894 + (15:52:35, 13 December 2024)