Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- 05000335/LER-1984-005-01, :on 840626,reactor Tripped Due to Failed Msiv. Caused by Failure of Rupture Disc in Air Supply to Valve Operator.Rupture Disk Replaced & Valve Tested & Returned to Svc + (15:00:44, 13 December 2024)
- ML20094A416 + (15:00:45, 13 December 2024)
- ML20094A405 + (15:00:46, 13 December 2024)
- ML20094A396 + (15:00:48, 13 December 2024)
- ML20094A384 + (15:00:49, 13 December 2024)
- ML20094A393 + (15:00:49, 13 December 2024)
- ML20094A373 + (15:00:50, 13 December 2024)
- ML20094A358 + (15:00:51, 13 December 2024)
- ML20094A331 + (15:00:52, 13 December 2024)
- 05000220/LER-1984-011, :on 840603,scram Occurred When Reactor Mode Switch Changed to Shutdown.Caused by Improper Connection on Reactor Protection Sys (RPS) Channel 11.RPS Channel Removed & Checked + (15:00:53, 13 December 2024)
- ML20094A322 + (15:00:54, 13 December 2024)
- ML20094A318 + (15:00:57, 13 December 2024)
- PLA-2088, Responds to NRC Re Violations Noted in IE Insp Repts 50-387/83-30 & 50-388/83-25.Corrective actions:Q-list Revised & S-list Will Be Revised by 840428 to Provide Programmatic Control for Safety Impact Item Program + (15:00:58, 13 December 2024)
- ML20094A310 + (15:00:58, 13 December 2024)
- ML20094A295 + (15:00:59, 13 December 2024)
- ML20094A283 + (15:01:00, 13 December 2024)
- ML20094A281 + (15:01:01, 13 December 2024)
- ML20094A277 + (15:01:02, 13 December 2024)
- ML20094A274 + (15:01:03, 13 December 2024)
- ML20094A270 + (15:01:03, 13 December 2024)
- ML20094A267 + (15:01:04, 13 December 2024)
- NRC-95-4578, Forwards AP600 Rtnss Focused PRA Sensitivity Study Electronic Computer Files.Copy of Encls Sent Separately to D Jackson to Be Forwarded to N Siu of Inel + (15:01:05, 13 December 2024)
- NG-95-2971, 1995 Cyclic Rept of Facility Changes,Tests & Experiments & Fire Plan Changes, Covering Period from 940101 - 951001.W/ + (15:01:06, 13 December 2024)
- ML20094A249 + (15:01:07, 13 December 2024)
- ML20094A243 + (15:01:07, 13 December 2024)
- 3F1095-21, Rescinds 1-h non-emergency Rept (NRC Event 29384) Re Two Valves,When Opened Simultaneously,Comprising Operation Outside Design Basis of Plant + (15:01:08, 13 December 2024)
- ML20094A237 + (15:01:09, 13 December 2024)
- PY-CEI-NRR-0126, Forwards Summary Forms on Equipment for Sqrt & Pump & Valve Operability Review Team Audits by Equipment Qualification Branch.Floor Response Spectra & Valve Qualification Program Description Encl + (15:01:10, 13 December 2024)
- ML20094A230 + (15:01:10, 13 December 2024)
- ML20094A228 + (15:01:11, 13 December 2024)
- ML20094A226 + (15:01:12, 13 December 2024)
- ML20094A221 + (15:01:13, 13 December 2024)
- ML20094A214 + (15:01:14, 13 December 2024)
- 05000316/LER-1984-026, :on 840821,control Room Cable Vault Supply Fan Fire Damper 2-HV-ACES-2 Closed But Not Latched.Caused by Clearance Between Latch Bolt & Housing Being Greater than Necessary.Personnel Reinstructed + (15:01:19, 13 December 2024)
- 05000315/LER-1984-024-01, :on 841002,during Surveillance Test,Spent Fuel Pool Exhaust Ventilation Sys Dampers Did Not Change Position to Direct Air Flow Through Charcoal Adsorbers.Cause Unknown.Investigation Revealed No Reason + (15:01:21, 13 December 2024)
- ML20094A209 + (15:01:22, 13 December 2024)
- LIC-95-0205, Forwards Rev 1 to EPIP-TSC-2,EPIP Index,Pages 1,2 & 3 & Rev 8 to Radiological Emergency Response Plan, Section P + (15:01:23, 13 December 2024)
- BSEP-84-2235, RO-2-84-11:on 840924,reactor Scram Occurred Due to Reactor Vessel Low Water Level.Ler Will Be Submitted by 841107 + (15:01:24, 13 December 2024)
- 05000373/LER-1984-058-01, :on 841001, Emergency make-up Train B Inadvertently Initiated.Caused by Personnel Being Unaware of Train Status.Train Immediately Secured & Control Switch Taken to pull-to-lock Position + (15:01:26, 13 December 2024)
- ML20094A200 + (15:01:27, 13 December 2024)
- ML20094A202 + (15:01:27, 13 December 2024)
- 2CAN109503, Forwards Rev 0 to 95-R-2003-01, Entergy Operations ANO-2 COLR for Cycle 12 + (15:01:28, 13 December 2024)
- ML20094A198 + (15:01:28, 13 December 2024)
- ML20094A177 + (15:01:29, 13 December 2024)
- ML20094A176 + (15:01:30, 13 December 2024)
- ML20094A172 + (15:01:31, 13 December 2024)
- ML20094A167 + (15:01:31, 13 December 2024)
- ML20094A166 + (15:01:32, 13 December 2024)
- ULNRC-03281, Forwards Revised TS Pages,Relocating Audit Frequencies in Former TS 6.5.2.9 to Operational QA Manual,In Response to NRC & 951010 Telcon W/Nrc + (15:01:33, 13 December 2024)
- NLS8400265, Forwards Revised Page 137A to Proposed Rev 14 to Tech Specs Re Primary Containment Surveillance Instrumentation + (15:01:33, 13 December 2024)
- ML20094A154 + (15:01:34, 13 December 2024)