Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20094G701 + (14:33:51, 13 December 2024)
- ML20094G699 + (14:33:52, 13 December 2024)
- ML20094G698 + (14:33:53, 13 December 2024)
- ML20094G693 + (14:33:53, 13 December 2024)
- ML20094G691 + (14:33:54, 13 December 2024)
- ML20094G680 + (14:33:55, 13 December 2024)
- ML20094G686 + (14:33:55, 13 December 2024)
- ML20094G677 + (14:33:56, 13 December 2024)
- ML20094G675 + (14:33:56, 13 December 2024)
- BECO-92-017, Responds to 920115 Supplemental Safety Evaluation Requesting Schedule for Implementation of Recommendations in Original Safety Evaluation Re Station Blackout Rule.Subjs Include cross-tie Circuit Testing + (14:33:57, 13 December 2024)
- ML20094G672 + (14:33:58, 13 December 2024)
- ML20094G662 + (14:33:58, 13 December 2024)
- ML20094G660 + (14:33:59, 13 December 2024)
- ML20094G658 + (14:33:59, 13 December 2024)
- ML20094G656 + (14:34:00, 13 December 2024)
- ML20094G647 + (14:34:01, 13 December 2024)
- ML20094G653 + (14:34:01, 13 December 2024)
- ML20094G641 + (14:34:02, 13 December 2024)
- ML20094G634 + (14:34:03, 13 December 2024)
- ML20094G639 + (14:34:03, 13 December 2024)
- ML20094G628 + (14:34:04, 13 December 2024)
- ML20094G601 + (14:34:05, 13 December 2024)
- ML20094G597 + (14:34:06, 13 December 2024)
- AECM-84-0379, Special Rept 84-028/0:on 840627,Div 1 Diesel Generator Tripped of 50% Load.Caused by Grounding of Phase B Linear Reactor of Voltage Transformer.Div 1 Diesel Generator A,B & C Phase Reactors Replaced + (14:34:07, 13 December 2024)
- ML20094G595 + (14:34:07, 13 December 2024)
- ML20094G585 + (14:34:08, 13 December 2024)
- 2CAN088401, Summarizes 840712 Meeting W/Nrc,Technology for Energy Corp & Scan Power in Bethesda,Md Re Inadequate Core Cooling Instrument Installation.Supporting Documentation Encl + (14:34:09, 13 December 2024)
- AECM-84-0387, Updated Special Rept 84-022/1:on 840429,auxiliary Main Steam Tunnel Temps Exceeded 125 F Limit of Tech Spec 3.7.8. Task Cards Will Be Issued to Track New Qualified Life of Each Affected Component + (14:34:09, 13 December 2024)
- ML20094G573 + (14:34:10, 13 December 2024)
- ML20094G569 + (14:34:11, 13 December 2024)
- ML20094G572 + (14:34:11, 13 December 2024)
- ML20094G563 + (14:34:12, 13 December 2024)
- ML20094G543 + (14:34:15, 13 December 2024)
- ML20094G553 + (14:34:15, 13 December 2024)
- ML20094G540 + (14:34:16, 13 December 2024)
- ML20094G538 + (14:34:17, 13 December 2024)
- ML20094G530 + (14:34:19, 13 December 2024)
- ML20094G524 + (14:34:20, 13 December 2024)
- ML20094G519 + (14:34:20, 13 December 2024)
- ML20094G518 + (14:34:21, 13 December 2024)
- ML20094G516 + (14:34:22, 13 December 2024)
- ML20094G517 + (14:34:22, 13 December 2024)
- ML20094G514 + (14:34:23, 13 December 2024)
- BSEP-84-1730, Special Rept 2-SR-84-10:on 840629,fire Barrier Limiting Condition for Operation Initiated for Fire Door 303.Door Would Not Properly Open Due to Problems W/Hinges & Interlock Device.Door Repaired + (14:34:24, 13 December 2024)
- ML20094G501 + (14:34:32, 13 December 2024)
- ML20094G491 + (14:34:33, 13 December 2024)
- 05000237/LER-1984-012-04, :on 840709,reactor Scrammed.Caused by Instrument Mechanic Mistakenly Turning Reactor Protective Sys Channel B Instead of Channel a Hydrogen Addition Switch to Off + (14:34:34, 13 December 2024)
- ML20094G482 + (14:34:35, 13 December 2024)
- ML20094G466 + (14:34:40, 13 December 2024)
- ML20094G459 + (14:34:41, 13 December 2024)
- ML20094G458 + (14:34:42, 13 December 2024)
- B11268, Clarifies SER of Amend 95 to License DPR-65 Re Spacing Discrepancy in Reed Switches in CEA Position Indication Sys + (14:34:43, 13 December 2024)