Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20096E036 + (12:59:31, 13 December 2024)
- ML20096E035 + (12:59:32, 13 December 2024)
- ML20096E029 + (12:59:33, 13 December 2024)
- ML20096E024 + (12:59:34, 13 December 2024)
- ML20096E016 + (12:59:35, 13 December 2024)
- ML20096E015 + (12:59:35, 13 December 2024)
- ML20096E014 + (12:59:36, 13 December 2024)
- ML20096E013 + (12:59:37, 13 December 2024)
- ML20096E007 + (12:59:37, 13 December 2024)
- ML20096E004 + (12:59:38, 13 December 2024)
- ML20096E001 + (12:59:38, 13 December 2024)
- JAFP-92-0390, Monthly Operating Rept for Apr 1992 for Ja Fitzpatrick Nuclear Power Plant + (12:59:39, 13 December 2024)
- PY-CEI-NRR-1493, Monthly Operating Rept for Apr 1992 for Perry Unit 1.W/ + (12:59:40, 13 December 2024)
- ML20096D998 + (12:59:40, 13 December 2024)
- U-601978, Monthly Operating Rept for Apr 1992 for Clinton Power Station Unit 1 + (12:59:41, 13 December 2024)
- ML20096D990 + (12:59:43, 13 December 2024)
- ML20096D964 + (12:59:43, 13 December 2024)
- ML20096D961 + (12:59:44, 13 December 2024)
- JAFP-92-0316, Special Rept:On 920406,electric Driven Pump Was Out of Service for Approx 16 Days & 5 H.Caused by Extended Overhaul Time.Electric Motor Was Removed,Overhauled,Tested,Found Satisfactory & Returned to Plant + (12:59:45, 13 December 2024)
- 2CAN059202, Advises That 29 Tubes Were Plugged & 392 Tubes Were Sleeved in 2E-24A Sg.In 2E-24B,11 Tubes Were Plugged & 56 Tubes Were Sleeved.Subj Tubes Plugged or Sleeved During Forced Outage. Tables Re Tubes That Were Plugged/Sleeved Encl + (12:59:45, 13 December 2024)
- ML20096D919 + (12:59:47, 13 December 2024)
- ML20096D915 + (12:59:48, 13 December 2024)
- 05000271/LER-1992-014, :on 920412,reactor Scram & ECCS Initiation Received as Result of Valve Operation in Improper Sequence & False Low Water Level Signal Received.Caused by Personnel Error.Training Provided + (12:59:50, 13 December 2024)
- ML20096D911 + (12:59:51, 13 December 2024)
- ML20096D912 + (12:59:51, 13 December 2024)
- 05000413/LER-1992-004, :on 920314,discovered That Limit Switch Contacts in Incorrect Position on AF Sys motor-driven Pump B Discharge to SG 1C Isolation Valve.On 920302 Design Defect Noted W/Circuit.Valve Replaced + (12:59:53, 13 December 2024)
- ML20096D908 + (12:59:54, 13 December 2024)
- BSEP-96-0015, Informs NRC of Rev in Schedule for Completing Unit 2 Core Spray Sys Sparger Repair Bracket Seal Weld Application + (12:59:55, 13 December 2024)
- ML20096D894 + (12:59:55, 13 December 2024)
- ML20096D889 + (12:59:56, 13 December 2024)
- ML20096D882 + (12:59:57, 13 December 2024)
- ML20096D887 + (12:59:57, 13 December 2024)
- AECM-84-0436, Informs That Permanent Installation of Temp Indicators to Provide Data on Exhaust Gas Temp in Region of Turbocharger Inlet Completed for Divs 1 & 2 Engines,Per 840802 Commitments + (12:59:58, 13 December 2024)
- ML20096D881 + (12:59:58, 13 December 2024)
- ML20096D875 + (12:59:59, 13 December 2024)
- ML20096D872 + (13:00:00, 13 December 2024)
- ML20096D853 + (13:00:01, 13 December 2024)
- ML20096D851 + (13:00:02, 13 December 2024)
- ML20096D848 + (13:00:03, 13 December 2024)
- 05000416/LER-1992-004, :on 920414,discovered That Both Divs of Drywell Purge Sys Inoperable.Caused by Incomplete Component Designation Stencilled on Valve.Incomplete Stencil Corrected & Operator Training Program Revised + (13:00:04, 13 December 2024)
- ML20096D846 + (13:00:06, 13 December 2024)
- ML20096D842 + (13:00:07, 13 December 2024)
- ML20096D841 + (13:00:07, 13 December 2024)
- ML20096D838 + (13:00:08, 13 December 2024)
- ML20096D837 + (13:00:09, 13 December 2024)
- ML20096D833 + (13:00:10, 13 December 2024)
- ML20096D828 + (13:00:11, 13 December 2024)
- ML20096D821 + (13:00:12, 13 December 2024)
- 05000440/LER-1992-008, :on 920415,loss of Administrative Control of Containment Isolation Valve Resulted in TS Violation.Caused by Inadequate Procedures.Standing Order Issued to All Licensed & Nonlicensed Operators + (13:00:13, 13 December 2024)
- ML20096D801 + (13:00:14, 13 December 2024)
- ML20096D795 + (13:00:15, 13 December 2024)