Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20099C842 + (11:42:47, 13 December 2024)
- ML20099C836 + (11:42:48, 13 December 2024)
- ML20099C841 + (11:42:48, 13 December 2024)
- ML20099C834 + (11:42:49, 13 December 2024)
- TAC:54351 + (11:42:50, 13 December 2024)
- B11453, Forwards Addl Info Re SER Confirmatory Item 70 Concerning 260 Series Questions on QA Program During Operational Phase, Per Discussion During 850129 Telcon.Item Resolved + (11:42:52, 13 December 2024)
- ML20099C832 + (11:42:52, 13 December 2024)
- AECM-84-0465, Forwards Response to Generic Ltr 83-28,Items 1.1 & 1.2 Re post-trip Review Program Description & Procedure & Data & Info Capability,Respectively + (11:42:53, 13 December 2024)
- ML20099C824 + (11:42:54, 13 December 2024)
- ML20099C802 + (11:42:55, 13 December 2024)
- ML20099C812 + (11:42:55, 13 December 2024)
- IR 05000456/2020501 + (11:42:56, 13 December 2024)
- ML20099C790 + (11:42:57, 13 December 2024)
- ML20099C786 + (11:42:57, 13 December 2024)
- ML20099C784 + (11:42:58, 13 December 2024)
- ML20099C775 + (11:42:59, 13 December 2024)
- ML20099C778 + (11:42:59, 13 December 2024)
- ML20099C774 + (11:43:00, 13 December 2024)
- ML20099C762 + (11:43:01, 13 December 2024)
- ML20099C767 + (11:43:01, 13 December 2024)
- 1CAN028510, Forwards Response to 840423 Request for Addl Info Re Generic Ltr 81-21 Concerning Natural Circulation Cooldown Analysis.Natural Circulation Cooldown Procedure Will Be Revised to Reflect Cooldown Method Modeled in Analysis + (11:43:02, 13 December 2024)
- ML20099C758 + (11:43:03, 13 December 2024)
- ML20099C754 + (11:43:03, 13 December 2024)
- ML20099C747 + (11:43:04, 13 December 2024)
- ML20099C746 + (11:43:05, 13 December 2024)
- RBG-20-312, Submits Revised Response to Item 9 of SER Table 1.3,changing Info Provided in Je Booker .Revised FSAR Table 1.5-12 Re Indication of Bypass/Inoperability Due to Auxiliary/Support Sys,Encl + (11:43:06, 13 December 2024)
- ML20099C742 + (11:43:07, 13 December 2024)
- AECM-84-0460, RO 84-035/0:on 840912,during Routine Calibr Check of Portable instrument,152 Uci Calibr Source Found Leaking. Caused by Breached Mylar Coating on Sealed Calibr Source. Source Disposed of as Radwaste & Lockers Inspected + (11:43:08, 13 December 2024)
- B11471, Submits Partial Response to SER Open Item 10 Re Structural Capability of Refueling Cavity Wall.Fsar Table 6.2-43 Encl Showing That Refueling Cavity Wall Designed to Withstand Uniform Pressure of 11.6 Psid + (11:43:09, 13 December 2024)
- ML20099C725 + (11:43:09, 13 December 2024)
- ML20099C715 + (11:43:10, 13 December 2024)
- 05000327/LER-1984-066, :on 841009,breaker Manually Opened W/O Supplying Alternate Power to Loads,Resulting in Loss of Control Power to Diesel Generator 2A-A Emergency Start Relay.Caused by Personnel Error.Breaker Closed + (11:43:12, 13 December 2024)
- ML20099C706 + (11:43:13, 13 December 2024)
- ML20099C703 + (11:43:13, 13 December 2024)
- ML20099C702 + (11:43:14, 13 December 2024)
- ML20099C700 + (11:43:15, 13 December 2024)
- ML20099C698 + (11:43:16, 13 December 2024)
- ML20099C697 + (11:43:16, 13 December 2024)
- ML20099C694 + (11:43:17, 13 December 2024)
- ML20099C689 + (11:43:18, 13 December 2024)
- ML20099C683 + (11:43:19, 13 December 2024)
- 05000382/LER-2019-005-01, Automatic Reactor Scram Due to Steam Generator 1 High Level Resulting from a Main Turbine Trip and Subsequent Reactor Power Cutback Due to Failed Diode Modules with the Main Exciter + (11:43:21, 13 December 2024)
- ML20099C679 + (11:43:22, 13 December 2024)
- ML20099C664 + (11:43:23, 13 December 2024)
- ML20099C662 + (11:43:24, 13 December 2024)
- ML20099C659 + (11:43:24, 13 December 2024)
- JAFP-84-1040, Monthly Operating Rept for Oct 1984 + (11:43:25, 13 December 2024)
- ML20099C651 + (11:43:26, 13 December 2024)
- ML20099C650 + (11:43:28, 13 December 2024)
- A04533, Forwards Response to SER Open Item 3 Re Protection Against Postulated High Energy Line Breaks Outside Containment. Subgroup Formed to Address Impact of Superheated Steam Blowdowns from High Energy Line Breaks Outside Containment + (11:43:29, 13 December 2024)
- ML20099C639 + (11:43:29, 13 December 2024)