Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20099E943 + (11:36:45, 13 December 2024)
- B14014, Proposed TS Table 3.6-2 Re Containment Isolation Valves + (11:36:46, 13 December 2024)
- B14041, Application for Amend to License DPR-65,changing TS Table 3.6-2 to Include Addition of Bypass Lines & Associated Containment Isolation Valves 2-MS-458 & 2-MS-459 to Provide Drainage Path for Condensate During Plant Startup + (11:36:47, 13 December 2024)
- 1CAN089202, Requests 30-day Extension of Submittal Date for Inservice Insp Outage Summary Rept Due to Be Submitted on 920807. Extension Required Due to Heavy Workload Following Tenth Refueling Outage Which Ended on 920509 + (11:36:47, 13 December 2024)
- ML20099E932 + (11:36:48, 13 December 2024)
- RBG-37295, Informs That Util Will Revise Vendor Interface Program to Reflect Contact w/safety-related Vendors on Once Per Cy Basis,Per 900928 Response to Generic Ltr 90-03, Vendor Interface for Safety-Related Components + (11:36:49, 13 December 2024)
- ML20099E928 + (11:36:49, 13 December 2024)
- ML20099E918 + (11:36:50, 13 December 2024)
- ML20099E912 + (11:36:51, 13 December 2024)
- ML20099E904 + (11:36:52, 13 December 2024)
- ML20099E907 + (11:36:52, 13 December 2024)
- B14211, Requests Temporary Waiver of Compliance from TS 3.7.13 Re Fire Rated Assemblies to Allow Facility to Operate While Concerns of NRC Bulletin 92-001 on Failure of Thermo-Lag 330 Fire Barrier Sys Addressed Inside Containment + (11:36:56, 13 December 2024)
- ML20099E892 + (11:36:57, 13 December 2024)
- ML20099E889 + (11:36:58, 13 December 2024)
- ML20099E882 + (11:37:02, 13 December 2024)
- ML20099E884 + (11:37:02, 13 December 2024)
- LIC-92-0145, Requests one-time Waiver of Compliance from TS 3.17(3)(iii)3 Re Unscheduled Insps of SG Per First Sample Insp Specified in Table 3-13.Waiver Requested to Preclude Delay in Startup Due to 920703-04 RCS Pressure Transient + (11:37:03, 13 December 2024)
- ML20099E879 + (11:37:04, 13 December 2024)
- ML20099E872 + (11:37:05, 13 December 2024)
- ML20099E869 + (11:37:06, 13 December 2024)
- ML20099E858 + (11:37:06, 13 December 2024)
- ML20099E853 + (11:37:07, 13 December 2024)
- ML20099E847 + (11:37:09, 13 December 2024)
- ML20099E834 + (11:37:11, 13 December 2024)
- ML20099E824 + (11:37:12, 13 December 2024)
- ST-HL-AE-4164, Responds to NRC Ltr Re Violations Noted in Insp Repts 50-498/92-01 & 50-499/92-01.Corrective Actions: Responsibility for Safeguards Info Program Transferred & Safeguards Info Training Will Be Enhanced + (11:37:13, 13 December 2024)
- 05000352/LER-1992-015, :on 920707,HPCI Sys Turbine Stop Valve Closed & Reopened Several Times.Caused by Malfunction of Hydraulic Mechanical Ovespeed Trip Mechanism.Hpci Sys Maint Procedures Will Be Revised & Sys Flushed + (11:37:15, 13 December 2024)
- 05000368/LER-1992-002, :on 920309,primary-to-secondary Leak in SG a Detected.Caused by Cognitive Personnel Error & Lack of Training in Eddy Current Analysis.Training & Testing of Analysts Completed & Tube 67-109 Plugged + (11:37:17, 13 December 2024)
- ML20099E797 + (11:37:18, 13 December 2024)
- RBG-37324, Responds to Violations Noted in Insp Rept 50-458/92-18 on 920412-0523.Corrective Actions:Outboard Isolation Valve Closed & Tagged & 920412 Containment Breach Reviewed W/ Operators During Shift Briefings + (11:37:18, 13 December 2024)
- ML20099E786 + (11:37:19, 13 December 2024)
- JSP-377-92, Responds to SALP 11 for Feb 1991 Through Apr 1992.Items Needing Addl NRC Clarification Re Engineering/Technical Support & Safety Assessment/Quality Verification Listed on Encl + (11:37:20, 13 December 2024)
- ML20099E784 + (11:37:20, 13 December 2024)
- ML20099E775 + (11:37:21, 13 December 2024)
- ML20099E772 + (11:37:22, 13 December 2024)
- ML20099E771 + (11:37:22, 13 December 2024)
- ML20099E764 + (11:37:24, 13 December 2024)
- ML20099E756 + (11:37:25, 13 December 2024)
- ML20099E749 + (11:37:26, 13 December 2024)
- 05000482/LER-1992-012, :on 920707,discovered That Sp to Demonstrate Operability of Containment Personnel Airlock & Containment Emergency Escape Airlock Not Performed by 920526 & 0321, Respectively.Caused by Computer Error + (11:37:27, 13 December 2024)
- 05000339/LER-1984-011-02, :on 841019 & 22,emergency Diesel Generator 2H Tripped on High Jacket Coolant Temp.Following Calibr of Temp Switch,Diesel Tripped on High Crankcase Pressure on 841102. Caused by Spurious Instrumentation Problems + (11:37:30, 13 December 2024)
- ML20099E733 + (11:37:31, 13 December 2024)
- TXX-4367, Forwards Rev 1 to Program Plan & Issue-Specific Action Plans, Per 841019 & 23 Meetings W/Nrc.Rev Adds Two non-util Members to Senior Review Team & Replaces All Issue Team Leaders w/non-util Experts + (11:37:31, 13 December 2024)
- ML20099E730 + (11:37:32, 13 December 2024)
- 05000373/LER-1984-066-01, :on 841015,train a ammonia-chloride Alarm Received.Faulty Tape Removed + (11:37:34, 13 December 2024)
- ML20099E720 + (11:37:35, 13 December 2024)
- ML20099E709 + (11:37:36, 13 December 2024)
- ML20099E706 + (11:37:36, 13 December 2024)
- ML20099E705 + (11:37:37, 13 December 2024)
- AECM-84-0508, Forwards Response to Items 2.1 & 2.2.2 of Generic Ltr 83-28 Re Equipment Classification of Reactor Trip Sys Components & Vendor Interface Program,Respectively.Programs in Place Meet Intent of Proposed Vendor Interface Program + (11:37:38, 13 December 2024)
- ML20099E699 + (11:37:38, 13 December 2024)