Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20099H563 + (11:28:17, 13 December 2024)
- ML20099H561 + (11:28:18, 13 December 2024)
- ML20099H559 + (11:28:18, 13 December 2024)
- ML20099H549 + (11:28:20, 13 December 2024)
- ML20099H553 + (11:28:20, 13 December 2024)
- ML20099H547 + (11:28:21, 13 December 2024)
- ML20099H542 + (11:28:22, 13 December 2024)
- ML20099H536 + (11:28:23, 13 December 2024)
- ML20099H531 + (11:28:24, 13 December 2024)
- 05000397/LER-1984-111, :on 841018,discovered Battery Surveillance Test Not Performed.Caused by Computer Program Being Incorrectly Set Up.Computer Program Fault Corrected & Surveillance Program Reexamined + (11:28:26, 13 December 2024)
- ML20099H527 + (11:28:27, 13 December 2024)
- AECM-84-0491, Informs That 840226 Commitment to Submit Limited Risk Assessment for Loss of Ac Power Withdrawn Since Diesel Engines Inspected to Address Adequacy of Tdi Diesel Engines & Expdedite Issuance of Full Power OL + (11:28:28, 13 December 2024)
- ML20099H523 + (11:28:28, 13 December 2024)
- ML20099H511 + (11:28:29, 13 December 2024)
- ML20099H508 + (11:28:30, 13 December 2024)
- ML20099H504 + (11:28:30, 13 December 2024)
- ML20099H502 + (11:28:31, 13 December 2024)
- ML20099H500 + (11:28:32, 13 December 2024)
- ML20099H498 + (11:28:32, 13 December 2024)
- JPN-92-044, Forwards Application for Amend to License DPR-59,changing TS Re Offgas Sys Steam Dilution Flow Isolation Setpoints to Increase Offgas Dilution Steam Low Flow & High Flow Isolation Setpoints to 6,300 & 7,900 Lbs Per H,Respectively + (11:28:33, 13 December 2024)
- BECO-LTR-92-098, Monthly Operating Rept for Jul 1992 for Pilgrim Nuclear Power + (11:28:34, 13 December 2024)
- ST-HL-AE-4177, Suppls 920710 Response to Exercise Weaknesses Noted in Insp Repts 50-498/92-09 & 50-499/92-09.Date to Determine Revised Needs for round-the-clock Emergency Medical Care at Facilities Extended from 920805 to 920915 + (11:28:34, 13 December 2024)
- ML20099H476 + (11:28:35, 13 December 2024)
- 05000458/LER-1992-011, :on 920713,routine Review of Surveillance Test Procedures (Stps) Revealed That STP Was Overdue.Caused by Personnel Error.Supervisor Counseled & Surveillance Test Scheduling Priority Rept Posted + (11:28:37, 13 December 2024)
- ML20099H471 + (11:28:38, 13 December 2024)
- PLA-2349, Monthly Operating Repts for Oct 1984 + (11:28:39, 13 December 2024)
- ML20099H454 + (11:28:40, 13 December 2024)
- 05000362/LER-1992-004, :on 920720,manual Initiation of Emergency FW Actuation Sys Occurred in Response to Trip of Mfpt.Caused by Low Bearing Lube Oil Pressure Condition of Associated MFP 3P062.PRV 3PCV-4270 Adjusted + (11:28:41, 13 December 2024)
- 05000251/LER-1984-023-01, :on 841016,reactor Trip Occurred.Caused by Detector on Nis N-32 Channel Failing & Generating High Level Signal.Nis Channel N-32 Taken Out of Svc & Detector Replaced + (11:28:43, 13 December 2024)
- ML20099H431 + (11:28:45, 13 December 2024)
- ML20099H427 + (11:28:46, 13 December 2024)
- 0CAN089206, Advises That TS Changes to Address Operational & SR for Main Steam Line Radiation Monitors,Per Commitment in , Delayed from 920831 to 920930,based on Rescheduling of Safety Review Committee Meeting from mid-Aug to mid-Sept + (11:28:48, 13 December 2024)
- NLS8400274, Forwards Addl Fee for 830427 Application for Amend to License DPR-46,changing Tech Specs,Per 841106 Request + (11:28:49, 13 December 2024)
- ML20099H405 + (11:28:49, 13 December 2024)
- ML20099H394 + (11:28:50, 13 December 2024)
- ML20099H384 + (11:28:51, 13 December 2024)
- ML20099H381 + (11:28:52, 13 December 2024)
- ML20099H376 + (11:28:53, 13 December 2024)
- ML20099H361 + (11:28:54, 13 December 2024)
- ML20099H366 + (11:28:54, 13 December 2024)
- ML20099H357 + (11:28:55, 13 December 2024)
- RBG-19-255, Forwards Summary Rept, Detailed Control Room Design Review, Methodology & Approach,Human Engineering Discrepancy Results, Per Generic Ltr 82-33, Suppl 1 to NUREG-0737 - Requirements for Emergency Response Capability + (11:28:56, 13 December 2024)
- ML20099H354 + (11:28:56, 13 December 2024)
- RA-20-0116, Special Report 2020-002-00 for Catawba Nuclear Station, Units 1 and 2, Meteorological Instrumentation Annual Data Recovery + (11:28:57, 13 December 2024)
- 05000373/LER-1985-014-01, :on 850204,vacuum Breaker Valve Opened & Reclosed to Equalize Pressure Between Suppression Pool & Drywell.Caused by Adding Nitrogen to Reduce Drywell Oxygen Concentration.Procedure Will Be Revised + (11:28:59, 13 December 2024)
- ML20099H340 + (11:29:00, 13 December 2024)
- ML20099H339 + (11:29:00, 13 December 2024)
- U-602031, Monthly Operating Rept for Jul 1992 for CPS Unit 1 + (11:29:01, 13 December 2024)
- RBG-20-314, Requests Meeting W/Emergency Preparedness Team Leader & Applicable Team Members on 850315 in Arlington,Tx.Proposed Agenda Items Consist of Prompt Notification Sys,Transient Population Info & Discussion of Insp Repts + (11:29:02, 13 December 2024)
- ML20099H335 + (11:29:02, 13 December 2024)
- 05000364/LER-1985-006, :on 850201,Train B wide-range Containment Sump Level Recorder Had Ink Cartridge Installed for Only Blue Pen,Making Recorder Inoperable.Caused by Personnel Error. Personnel Counseled + (11:29:04, 13 December 2024)