Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20099L554 + (11:16:19, 13 December 2024)
- ML20099L544 + (11:16:20, 13 December 2024)
- ML20099L543 + (11:16:21, 13 December 2024)
- ML20099L540 + (11:16:22, 13 December 2024)
- ML20099L538 + (11:16:25, 13 December 2024)
- ML20099L537 + (11:16:26, 13 December 2024)
- ML20099L530 + (11:16:26, 13 December 2024)
- ML20099L526 + (11:16:27, 13 December 2024)
- ML20099L529 + (11:16:27, 13 December 2024)
- ML20099L524 + (11:16:29, 13 December 2024)
- RBG-19-489, Forwards Rev to FSAR Section 3.8.2.7.1.1 Re Initial Structure Acceptance Test of Containment Vessel.Rev Will Be Included in Future Amend + (11:16:32, 13 December 2024)
- ML20099L517 + (11:16:33, 13 December 2024)
- U-602531, Forwards Rev 20 of Physical Security Plan for Clinton Power Station,Unit 1. Plan Withheld + (11:16:34, 13 December 2024)
- 05000219/LER-1984-023, :on 841023,containment Isolation Valves V-27-1, 2,3 & 4 Did Not Close Upon Loss of Instrument Air.Caused by Inadequate Design Spec of Valves.Valve Air Lines Disconnected.Valves Locked Closed + (11:16:36, 13 December 2024)
- PLA-4399, Forwards Change I to Ses Security Training & Qualification Plan. Plan Withheld + (11:16:37, 13 December 2024)
- ML20099L502 + (11:16:38, 13 December 2024)
- ML20099L500 + (11:16:39, 13 December 2024)
- ML20099L497 + (11:16:40, 13 December 2024)
- ML20099L496 + (11:16:41, 13 December 2024)
- ML20099L494 + (11:16:42, 13 December 2024)
- ML20099L491 + (11:16:44, 13 December 2024)
- B15484, Provides NRC Staff W/Update to Schedule for Performing Baseline Testing of Motor Control Ctr & Rod Control Area Air Conditioning Heat Exchangers,Per GL 89-13 + (11:16:45, 13 December 2024)
- ML20099L484 + (11:16:45, 13 December 2024)
- 05000278/LER-1995-007-02, :on 951202,main Turbine Trip Occurred Caused by Full Reactor Scram.Replaced Mechanical Trip Solenoid Valve Terminal Strip That Caused Initial Ground + (11:16:47, 13 December 2024)
- ML20099L479 + (11:16:48, 13 December 2024)
- 05000298/LER-1995-019, :on 951124,CR Emergency Filter Sys (CREFS) Was Inoperable Due to EDG Being Unavailable.Restored CREFS to Operability + (11:16:50, 13 December 2024)
- AECM-84-0525, Forwards Revised Vols 1-4, Tdi Diesel Generator Design Review & Quality Revalidation Rept. Rept Provides Addl Basis for Conclusion That Tdi Diesel Generators Presently Installed Capable of Performing Intended Safety Function + (11:16:51, 13 December 2024)
- ML20099L475 + (11:16:51, 13 December 2024)
- ML20099L467 + (11:16:52, 13 December 2024)
- BSEP-84-1557, Suppls Response to Insp Repts 50-324/83-26 & 50-325/83-26 Re Incomplete Revised Fire Protection Sys Drawings & Procedures Due to Unexpected Scope of Project & Vol of outage-related Work.Completion Anticipated by 850315 + (11:16:53, 13 December 2024)
- ML20099L462 + (11:16:54, 13 December 2024)
- ML20099L460 + (11:16:55, 13 December 2024)
- ML20099L461 + (11:16:55, 13 December 2024)
- ML20099L456 + (11:16:57, 13 December 2024)
- ML20099L454 + (11:16:57, 13 December 2024)
- ML20099L451 + (11:16:58, 13 December 2024)
- ML20099L450 + (11:16:59, 13 December 2024)
- ML20099L448 + (11:16:59, 13 December 2024)
- ML20099L447 + (11:17:00, 13 December 2024)
- RBG-20432, Forwards Rev 1 to Environ Qualification Document. Rev Addresses 850215 Environ Qualification Portion of SER Outstanding Item 5 + (11:17:00, 13 December 2024)
- B11349, Forwards Response to ACRS Questions Re Turbine Generator Overspeed Tests & PORV + (11:17:01, 13 December 2024)
- PY-CEI-NRR-0206, Forwards Addl Info Re Stiff Pipe Clamps,Per NRC 850219 Request.Support Stiffness Will Not Be Adversely Affected by Clamp Installation Practice + (11:17:02, 13 December 2024)
- ML20099L441 + (11:17:03, 13 December 2024)
- ML20099L442 + (11:17:03, 13 December 2024)
- ML20099L439 + (11:17:04, 13 December 2024)
- ML20099L433 + (11:17:05, 13 December 2024)
- ML20099L438 + (11:17:05, 13 December 2024)
- ML20099L431 + (11:17:06, 13 December 2024)
- ML20099L430 + (11:17:10, 13 December 2024)
- ML20099L429 + (11:17:11, 13 December 2024)
- 05000374/LER-1984-071-01, :on 841027,scram Occurred Due to APRM hi-hi Flux Signal on Reactor Protection Sys Channels a & B.Caused by Vessel Level Transient When Reactor Recirculation Flow Control Valve Lost Feedback & Ramped Open + (11:17:12, 13 December 2024)
- ML20099L424 + (11:17:14, 13 December 2024)