Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- 05000454/LER-1985-026, :on 850228,radiation Monitor 1PR11J Left Isolated from Containment Atmosphere After Maint Activity on Valve 1PR001B.Administrative Controls Implemented to Ensure Sys Integrity/Proper Restoration After Maint + (10:49:35, 13 December 2024)
- ML20100H025 + (10:49:37, 13 December 2024)
- 05000395/LER-1996-002, :on 960126,voluntary Entry Into TS 3.0.3 Made to Recover Train a Chillwater Due to Equipment Problem on Chiller a Which Was Supplying Train a ESF Equipment.No Specific Corrective Action for Event Warranted + (10:49:39, 13 December 2024)
- LIC-96-0015, Requests NRC Approval to Implement Provisions of ASME Code Case N-533 in Lieu of Requirements Stated in Article IWA-5242(a),re Insulation Removal for Class 1 pressure- Retaining Bolted Connections + (10:49:40, 13 December 2024)
- 05000446/LER-1996-002, :on 960126,noted That TS Surveillance for Turbine Overspeed Missed Due to Oversight in Rescheduling Required Surveillance by Cognizant Personnel.Test Completed on 960126 & Event Reviewed as Lesson Learned + (10:49:42, 13 December 2024)
- 3F0296-09, Requests Exemption from Section III.G.2 of 10CFR50,App R Re Certain Redundant Cables & Equipment in Reactor Containment Bldg at Facility + (10:49:44, 13 December 2024)
- ML20100G994 + (10:49:45, 13 December 2024)
- ML20100G970 + (10:49:45, 13 December 2024)
- 05000395/LER-1996-001, :on 960119,discovered Condition Not Covered by Plant Operating Emergency Procedures.Caused by Personnel Error.Use of Charging/Si Pump C on ESF Train B Administratively Restricted + (10:49:47, 13 December 2024)
- ML20100G967 + (10:49:49, 13 December 2024)
- ML20100G956 + (10:49:50, 13 December 2024)
- 0CAN029612, Forwards Corrected Page 15 of 17 of Attachment to 960213 180-day Response to GL 95-07, Pressure Locking & Thermal Binding of Safety-Related Power-Operated Gate Valves, Correcting Last Sentence of Last Paragraph as Listed + (10:49:50, 13 December 2024)
- BECO-LTR-96-010, Provides Suppl Info on Reactor Pressure Vessel Augmented Exam Requested by NRC in 951207 Telcon + (10:49:51, 13 December 2024)
- ML20100G938 + (10:49:52, 13 December 2024)
- ML20100G933 + (10:49:53, 13 December 2024)
- ML20100G918 + (10:49:54, 13 December 2024)
- ML20100G927 + (10:49:54, 13 December 2024)
- ML20100G917 + (10:49:55, 13 December 2024)
- ML20100G907 + (10:49:56, 13 December 2024)
- ML20100G887 + (10:49:59, 13 December 2024)
- ML20100G888 + (10:49:59, 13 December 2024)
- ML20100G880 + (10:50:01, 13 December 2024)
- ML20100G885 + (10:50:01, 13 December 2024)
- 05000277/LER-1996-001-01, :on 960118,licensed Thermal Power Slightly Exceeded Due to Unaccounted for CRD Water Flow.Caused by Failure to Consider Impact of Addl Flow on Core Thermal Power.Mod Design Process Will Be Enhanced.W/Undated Ltr + (10:50:03, 13 December 2024)
- ST-HL-AE-5291, Forwards Semiannual FFD Program Performance Rept for STP Units 1 & 2,covering Period Jul-Dec 1995,per 10CFR26.71(d) + (10:50:04, 13 December 2024)
- BECO-LTR-96-011, Provides FFD Program Performance Data for Pilgrim Nuclear Power Station,For Period Jul-Dec 1995 + (10:50:05, 13 December 2024)
- ML20100G861 + (10:50:06, 13 December 2024)
- ML20100G864 + (10:50:06, 13 December 2024)
- BSEP-96-0053, Monthly Operating Repts for Jan 1996 for BSEP Units 1 & 2 + (10:50:07, 13 December 2024)
- 05000331/LER-1985-006, :on 850303,while Resetting Isolations & Alarms Resulting from Instrument Panel a Being Deenergized,Standby Diesel Generator a Which Had Not Been Locked Began to auto-start.Generator Secured + (10:50:09, 13 December 2024)
- ML20100G853 + (10:50:11, 13 December 2024)
- 05000369/LER-1985-009-01, :on 850219,estmated 1 Cubic Ft of Contaminated Spent Resin Released from Vent.Resin Discovered on 850220 on Roof of Auxiliary Bldg & Other Bldgs.Caused by Personnel Error + (10:50:13, 13 December 2024)
- ML20100G836 + (10:50:17, 13 December 2024)
- ML20100G835 + (10:50:18, 13 December 2024)
- ML20100G833 + (10:50:19, 13 December 2024)
- L-2020-064, Exigent License Amendment Request 272, One-Time Extension of TS 6.8.4 Steam Generator Inspection Program - Response to Request for Additional Information + (10:50:20, 13 December 2024)
- ML20100G831 + (10:50:21, 13 December 2024)
- ML20100G826 + (10:50:23, 13 December 2024)
- ML20100G819 + (10:50:23, 13 December 2024)
- ML20100G815 + (10:50:25, 13 December 2024)
- ML20100G800 + (10:50:27, 13 December 2024)
- NRC-96-0008, Forwards Response to Questions on Proposed EDG TS Change + (10:50:28, 13 December 2024)
- B11503, Application for Amend to License DPR-65,revising Tech Specs Re Chlorine Setpoints,Control Room Emergency Ventilation Sys Flow Rate,Insertion of Control Room Monitoring & Elimination of Date Associated W/Reg Guide 1.95.Fee Paid + (10:50:29, 13 December 2024)
- ML20100G770 + (10:50:30, 13 December 2024)
- RBG-20-500, Forwards Proposed Changes to NRC Second Draft of Tech Specs. Brief Description of Proposed Change,Justification for Change & marked-up Pages from Second Draft Also Encl + (10:50:30, 13 December 2024)
- ML20100G764 + (10:50:31, 13 December 2024)
- ML20100G759 + (10:50:32, 13 December 2024)
- ML20100G740 + (10:50:33, 13 December 2024)
- 0CAN029603, Forwards ANO FFD Program Performance Data for Period of Jul-Dec 1995,per 10CFR26.71(d) + (10:50:34, 13 December 2024)
- ML20100G730 + (10:50:35, 13 December 2024)
- ML20100G725 + (10:50:38, 13 December 2024)