Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- 05000263/LER-1985-004-01, :on 850201,during Quarterly Valve Exercising, Flow Established Through RHR Intertia Line While Reactor in Run Mode.Caused by Improper Procedure.Procedure Revised + (06:39:24, 13 December 2024)
- 05000528/LER-1985-005, :on 850122,containment Purge Isolation & Fuel Bldg Essential Filtration Actuation Signals Actuated Simultaneously.Caused by Spurious Equipment Failure Alarm on Associated Radiation Monitoring Units + (06:39:26, 13 December 2024)
- 05000528/LER-1985-004, :on 850120,containment Purge Isolation & Control Room Essential Filtration Actuation Signals Automatically Actuated.Caused by Spurious Auxiliary Equipment Failure Alarm + (06:39:34, 13 December 2024)
- JPN-96-018, Forwards Response to NRC 960418 RAI Re Proposed T Change Request (JPTS-95-007) ,proposing to Revise Allowed out-of-service Times for Single Inoperable EDGs to Accommodate on-line Maint of EDGs + (06:39:35, 13 December 2024)
- 05000324/LER-1984-011-01, :on 840924,automatic Trip of Channels a & B W/Primary Containment Isolation Sys Occurred Due to Reactor Low Water Level.Caused by Misoperation of RHR Sys.Operator Involved Counseled & Disciplined + (06:39:37, 13 December 2024)
- 3F0496-34, Confirms Notification Made Via ENS on 960419 Retracting Notification Made on 960322 for Reportable Event 30152 Re Suspected Design Basis Issue Involving Charcoal Filtration Efficiency & Air in-leakage (Dose) for CREVS + (06:39:38, 13 December 2024)
- ML20108A391 + (06:39:40, 13 December 2024)
- ML20108A387 + (06:39:40, 13 December 2024)
- ML20108A386 + (06:39:41, 13 December 2024)
- ML20108A380 + (06:39:42, 13 December 2024)
- PY-CEI-NRR-2046, Withdraws 930618 LAR Involving Rev to TS Figure 5.1.1-1 & Various Refs to Figure Throughout Current Ts,Due to Anticipated Implementation of Amend 69 (Improved TS) Changes When Implemented Will Obviate Need to Process Subj LAR + (06:39:42, 13 December 2024)
- RBG-19290, Interim Deficiency Rept DR-223 Re Installation of Mechanical Snubbers Supplied by Pacific Scientific.Next Rept Will Be Submitted by 841211 + (06:39:43, 13 December 2024)
- ML20108A367 + (06:39:46, 13 December 2024)
- ML20108A365 + (06:39:47, 13 December 2024)
- W3P84-2963, Final Rept,Rev 1,on Significant Const Deficiency 84 Re Tube Track Welding.Reevaluation Performed by Ebasco Engineering to Establish Max Stress Levels Expected to Exist at Tube Track Welded Connections + (06:39:48, 13 December 2024)
- ML20108A354 + (06:39:48, 13 December 2024)
- ML20108A348 + (06:39:50, 13 December 2024)
- ML20108A338 + (06:39:51, 13 December 2024)
- ML20108A334 + (06:39:53, 13 December 2024)
- ML20108A330 + (06:39:54, 13 December 2024)
- ML20108A328 + (06:39:55, 13 December 2024)
- W3P84-2976, Interim Rept of Potentially Reportable Deficiency 179 Re Welding Program.Review & Evaluation of Welds Ongoing.Next Rept Will Be Submitted by 841130 + (06:39:56, 13 December 2024)
- ML20108A314 + (06:39:57, 13 December 2024)
- 05000354/LER-1996-012, :on 960320,missed Offgas Sample Resulting in Condition Prohibited by Ts.Caused by Defective Needle Luer Lock Adapter.Needle Luer Lock Adapter on Backup Sample Apparatus Replaced + (06:39:58, 13 December 2024)
- ML20108A307 + (06:39:59, 13 December 2024)
- W3P84-2961, Final Rept of Significant Const Deficiency 78 Re American Bridge Structural Steel.Reinsp of Connections in Steam Generator Framing Performed Scope of American Bridge Work Reviewed & Review of Existing Documentation Performed + (06:40:00, 13 December 2024)
- JPN-96-019, Informs of Extension of Second 10-yr ISI & IST Intervals by Period of Nine Months.Extension Being Applied to Third Period of Second Interval Currently Scheduled to End Sept 1996.Addl Nine Months Extends Interval Through June 1997 + (06:40:01, 13 December 2024)
- ML20108A298 + (06:40:01, 13 December 2024)
- ML20108A288 + (06:40:02, 13 December 2024)
- W3P84-2965, Interim Rept of Significant Const Deficiency 93 Re Charging & Letdown Containment Isolation Valves.Valve Replaced W/New Seats.Further Testing Recommended to Verify Proper Valve Operation.Next Rept Will Be Submitted by Dec 1984 + (06:40:03, 13 December 2024)
- RBG-19292, Interim Deficiency Rept DR-185 Re Placement of Two Isolation Valves Outside Containment for RCIC Turbine Exhaust Line Vacuum Breaker Sys.Interim or Final Status Rept Will Be Provided by 850116 + (06:40:03, 13 December 2024)
- W3P84-2964, Final Rept of Significant Const Deficiency 90 Re Overstressed Electrical Conduit.Revised Design Criteria Based on Analysis Issued.Items Remaining in Balance of Plant Will Be Completed by 841103 + (06:40:04, 13 December 2024)
- ML20108A269 + (06:40:06, 13 December 2024)
- ML20108A258 + (06:40:07, 13 December 2024)
- ML20108A257 + (06:40:07, 13 December 2024)
- ML20108A251 + (06:40:08, 13 December 2024)
- PY-CEI-NRR-1999, Application for Amend to License NPF-58,revising Improved Tech Specs.Changes Either Administrative in Nature or Reflect Minor Technical Errors Discovered During Implementation Process + (06:40:09, 13 December 2024)
- BSEP-84-2107, Forwards Monthly Operating Repts for Sept 1984 & Corrected Feb 1983 Rept.Gross Thermal Energy Gen (Line 16) Incorrect Due to Apparent Software Problem.Problem Being Investigated. W/O Feb 1983 Rept + (06:40:10, 13 December 2024)
- ML20108A239 + (06:40:11, 13 December 2024)
- ML20108A236 + (06:40:11, 13 December 2024)
- ML20108A228 + (06:40:13, 13 December 2024)
- ML20108A212 + (06:40:16, 13 December 2024)
- ML20108A178 + (06:40:22, 13 December 2024)
- 05000255/LER-1984-027, :on 841122 & 1204,charging Pump Could Not Be Started from Control Room or W/Local Start Button.Caused by Closing Coil Failure in Breaker.Breakers Will Be Included in Preventive Maint Program + (06:40:24, 13 December 2024)
- BSEP-85-0106, Responds to NRC Re Violations Noted in Insp Repts 50-324/84-34 & 50-325/84-34.Corrective Actions:Util & GE Demonstrated That Cracks in 28-inch Weld Would Have Been Detected + (06:40:25, 13 December 2024)
- ML20108A150 + (06:40:26, 13 December 2024)
- ML20108A143 + (06:40:26, 13 December 2024)
- ML20108A131 + (06:40:27, 13 December 2024)
- ML20108A125 + (06:40:29, 13 December 2024)
- ML20108A129 + (06:40:29, 13 December 2024)
- ML20108A117 + (06:40:30, 13 December 2024)
- ML20108A111 + (06:40:31, 13 December 2024)