Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20111B196 + (06:18:07, 13 December 2024)
- 05000413/LER-1984-025-03, :on 841127,motor Driven Auxiliary Feedwater Pumps Started After Loss of Main Feedwater Pumps When Reactor Trip Breakers Opened to Support Rod Drop Timing Test.Caused by Personnel Error + (06:18:08, 13 December 2024)
- 05000219/LER-1984-017, :on 840627,primary Containment Isolation Valves & Main Steam Valves Inadvertently Repositioned.Caused by Mod Involving Plant Computer Sys.Containment Isolation Valves Modified + (06:18:11, 13 December 2024)
- ML20111B178 + (06:18:12, 13 December 2024)
- ML20111B177 + (06:18:13, 13 December 2024)
- ML20111B175 + (06:18:13, 13 December 2024)
- ML20111B166 + (06:18:14, 13 December 2024)
- 05000413/LER-1984-023-01, :on 841119,motor Driven Auxiliary Feedwater Pumps 1A & 1B Started Due to Emergency Low Suction Flow Signal from Both Main Feedwater Pumps.Caused by Administrative/Procedural Deficiency + (06:18:16, 13 December 2024)
- 05000352/LER-1984-023, :on 841129,reactor Protection Sys Initiated Full Scram While Reactor Vessel Hydrostatic Pressure Test Performed While Reactor Shut Down.Scram Caused by Reactor High Pressure Due to Operator Error + (06:18:18, 13 December 2024)
- RBG-19771, Interim Deficiency Rept DR-266 Re Installation of Clamp Ears & Snubber End Paddle Welds Supplied by Bergen-Paterson.Next Rept Will Be Submitted by 850220 + (06:18:19, 13 December 2024)
- ML20111B136 + (06:18:20, 13 December 2024)
- RBG-19769, Final Deficiency Rept DR-151 Re Partial Penetration Welds for Square groove,butt-welded Joints on HVAC safety-related Ductwork.Initially Reported on 841126.Field Weld Technique Sheet Revised to Indicate Full Penetration Weld + (06:18:21, 13 December 2024)
- ML20111B121 + (06:18:21, 13 December 2024)
- ML20111B120 + (06:18:22, 13 December 2024)
- ML20111B117 + (06:18:23, 13 December 2024)
- 05000354/LER-1996-013, :on 960406,ESFA Occurred Due to Isolation of MSL Drain Inboard Isolation Valve.Replaced & Tested Circuit Board + (06:18:24, 13 December 2024)
- RBG-19770, Interim Deficiency Rept DR-188 Re Hubs on Socket Weld Flanges Supplied by West Jersey Mfg Co.Next Rept Will Be Submitted by 850131 + (06:18:25, 13 December 2024)
- 05000298/LER-1996-004, :on 960409,failed to Perform Surveillance within Required Surveillance Interval.Caused by Mgt/Qa Deficiency.Reviewed Past Surveillances for Similar Occurrences + (06:18:27, 13 December 2024)
- ML20111B113 + (06:18:28, 13 December 2024)
- ML20111B110 + (06:18:29, 13 December 2024)
- ML20111B111 + (06:18:29, 13 December 2024)
- ML20111B108 + (06:18:30, 13 December 2024)
- ML20111B095 + (06:18:31, 13 December 2024)
- 05000364/LER-1984-014-01, :on 841206,containment Purge Supply Fill Line Isolation Valve Found Opened & Line Uncapped.Caused by Personnel Error.Personnel Counseled Re Procedure Adherence + (06:18:33, 13 December 2024)
- 05000454/LER-1984-022-05, :on 841129,boron Dilution Protection Sys (Bdps) Actuations Occurred Four Times Because of Surveillances on Source Range Instruments.Caused by Bdps Not Blocked. Surveillance Revised + (06:18:35, 13 December 2024)
- RBG-19723, Final Deficiency Rept DR-207 Re Cold Soldered Joints & Unsoldered Wires in Eight Auxiliary Trip Assemblies Supplied by GE for Neutron &/Or Process Radiation.Condition Not Reportable Per 10CFR50.55(e).Nonconformance Rept Issued + (06:18:36, 13 December 2024)
- 3F0596-14, Corrects Info Provided by Util Re Reactor Coolant Pump Oil Collection Sys + (06:18:37, 13 December 2024)
- ML20111B084 + (06:18:37, 13 December 2024)
- ML20111B078 + (06:18:38, 13 December 2024)
- BSEP-96-0186, Informs of Relocation of Joint Info Ctr + (06:18:39, 13 December 2024)
- ML20111B066 + (06:18:39, 13 December 2024)
- RBG-42888, Forwards Summary of Startup Physics Testing Conducted on Cycle 7 Core Reload + (06:18:40, 13 December 2024)
- ML20111B064 + (06:18:40, 13 December 2024)
- 3F0596-04, Responds to NRC Bulletin 96-002, Movement of Heavy Loads Over Spent Fuel,Over Fuel in Reactor Vessel or Over Safety-Related Equipment + (06:18:41, 13 December 2024)
- ML20111B050 + (06:18:42, 13 December 2024)
- ML20111B052 + (06:18:42, 13 December 2024)
- 05000327/LER-1984-073, :on 841212,110 Fire Doors Failed to Meet Ul Stds.Caused by Maint & Mods Performed on Doors.Fire Watches Set Per Tech Specs & Mod/Repair Schedule & long-term Maint Being Addessed + (06:18:44, 13 December 2024)
- 05000311/LER-1984-025-01, :on 841126,audit Revealed That Weekly Plant Vent Particulate Sample for 840927 Not Analyzed within Time Required by Tech Specs.Caused by Personnel Error.Procedures Revised + (06:18:46, 13 December 2024)
- ML20111B046 + (06:18:47, 13 December 2024)
- NSD-NRC-96-4704, Forwards Draft TSs 5.1,5.2 & 5.3 for Use in Preliminary Review of SSAR Section 18.7 + (06:18:47, 13 December 2024)
- 05000362/LER-1984-041-01, :on 841126,containment Purge Isolation Sys Train Actuated.Caused by Grounding of Ac Power Cord Damaged by Drawer Removal from Plant Protection Sys.Personnel Cautioned + (06:18:55, 13 December 2024)
- ML20111B036 + (06:18:56, 13 December 2024)
- ML20111B033 + (06:18:57, 13 December 2024)
- 05000454/LER-1984-021-05, :Between 841127 & 1203,main Control Room Process Radiation Monitors Failed Automatic Check Source Tests,Causing Ventilation Sys to Switch to ESF Mode.Caused by Insufficient Tolerance in Setpoints + (06:18:58, 13 December 2024)
- RBG-19761, Interim Deficiency Rept DR-177 Re Installation,Design & Mfg of Coaxial & Instrumentation Cable for Neutron Monitoring Sys.Next Rept Will Be Provided by 850111 + (06:18:59, 13 December 2024)
- RBG-19757, Interim Deficiency Rept DR-225 Re Motor Torque Specified for Motor Operated Valves Supplied by Velan Engineering,Ltd.Next Rept Will Be Provided by 850121 + (06:19:00, 13 December 2024)
- ML20111B022 + (06:19:04, 13 December 2024)
- RBG-19758, Interim Deficiency Rept DR-243 Re Installation of Pacific Scientific Snubbers (PSA 10) & Bergen Paterson Clamps (PT 1001-15).Next Rept Will Be Provided by 850122 + (06:19:05, 13 December 2024)
- ML20111B019 + (06:19:06, 13 December 2024)
- 05000352/LER-1984-017, :on 841127,improper Setpoint for Chlorine Analyzer Trip Switch Found.Caused by Personnel Error.Calibr Performed Immediately & Personnel Counseled Re Procedures + (06:19:07, 13 December 2024)
- ML20111B014 + (06:19:08, 13 December 2024)