Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20113B178 + (05:24:53, 13 December 2024)
- 05000277/LER-1995-006, :on 951022,offsite Electrical Power Source Lost.Caused by Momentary Deenergization of Several Electrical Distribution Panels.Isolation Logics Reset & Affected Sys Restored + (05:24:54, 13 December 2024)
- 05000341/LER-1996-009, :on 960526,ESF Actuation Occurred.Caused by Plant Operator Attempting to Replace Burned Out Indicating Bulb,Cracked Socket Separated Completely,Resulting in Short Circuit.Lamp Socket Wires Taped + (05:24:56, 13 December 2024)
- NRC-96-0056, Discusses SALP 15 Response & Comments Made by NRC During SALP Meeting on 960521 + (05:24:58, 13 December 2024)
- ML20113B129 + (05:24:58, 13 December 2024)
- ML20113B128 + (05:24:59, 13 December 2024)
- U-602595, Forwards Response to Violations Noted in NRC Insp Rept 50-461/96-03.Corrective Actions:Injector Setting Jack Removed from Twelve Cylinder Diesel Engine & Governor Restored to Normal Configuration + (05:25:00, 13 December 2024)
- ML20113B110 + (05:25:00, 13 December 2024)
- 3F0696-05, Provides Response to Violation Noted in Insp Rept 50-302/96-03.Corrective Actions:Ltr Addressed to All Radiation Workers Reviewing Event Issued + (05:25:01, 13 December 2024)
- ML20113B095 + (05:25:02, 13 December 2024)
- ML20113B089 + (05:25:03, 13 December 2024)
- BSEP-96-0225, Forwards Response to NRC GL 95-07, Pressure Locking & Thermal Binding of Safety-Related Power-Operated Gate Valves + (05:25:04, 13 December 2024)
- L-84-353, Responds to NRC Re Violations Noted in Insp Repts 50-250/84-25 & 50-251/84-26.Corrective Actions:New Training Video Tape Prepared to Address Requirements of Administrative Procedure 0306 + (05:25:05, 13 December 2024)
- 05000293/LER-1996-007, :on 960519,LCO for Operation for Switchyard Battery Exceeded Tech Spec.Caused by Personnel Error.Revised Procedure 8.9.8.4 & Revised Master Surveillance Tracking Program Nodes + (05:25:07, 13 December 2024)
- 05000313/LER-1996-005-02, :on 960519,automatic Reactor Trip on High RCS Pressure Occurred.Caused by Component Failure in a MFW Pump Control Sys.Failed Speed Sensor Replaced + (05:25:10, 13 December 2024)
- 05000318/LER-1996-002-01, :on 960522,fire Watch Missed.Caused by Personnel Error.Counseled Personnel Re Event + (05:25:12, 13 December 2024)
- 05000333/LER-1996-007-01, :on 960522,sys Isolations & Standby Gas Treatment Initiation Occurred.Caused by False High Radiation Trip Signal.Detector Replaced W/Vendor Current Model + (05:25:14, 13 December 2024)
- 0CAN069602, Forwards Response to Violations Noted in Insp Repts 50-313/96-02 & 50-368/96-02.Corrective Actions:Valve Chain Reconfigured & Locked to Preclude Valve Operation + (05:25:15, 13 December 2024)
- ML20113B053 + (05:25:16, 13 December 2024)
- 2CAN069603, 1995 ANO Unit 2 10CFR50.59 Rept, for Period Ending 951120 + (05:25:18, 13 December 2024)
- ML20113B018 + (05:25:19, 13 December 2024)
- ML20113A989 + (05:25:20, 13 December 2024)
- ML20113A988 + (05:25:21, 13 December 2024)
- ML20113A977 + (05:25:22, 13 December 2024)
- ML20113A981 + (05:25:22, 13 December 2024)
- BSEP-96-0209, Submits Owner Data Rept for ISI Activities Conducted at BSEP During Refueling Outage 11 + (05:25:23, 13 December 2024)
- 3F0696-01, Provides 1995 Actual & 1996 Projected Internal Cash Flow Projection for Crystal River Unit 3 Nuclear Power Station + (05:25:24, 13 December 2024)
- ML20113A966 + (05:25:24, 13 December 2024)
- U-602599, Special Rept:On 960516,Loose Parts Monitoring System Declared Inoperable.Caused by Intermittent Alarms.Removed Temporary Mod & Restored Alarm Feature for Channel Three + (05:25:25, 13 December 2024)
- ML20113A904 + (05:25:26, 13 December 2024)
- 05000338/LER-1984-024, :on 841206,five Periodic Tests (PT) Not Performed within Required Surveillance Intervals.Caused by Breakdown in Communications Between Depts.Enhancements to PT Tracking Sys Being Developed + (05:25:28, 13 December 2024)
- U-602591, Proposed Tech Specs,Allowing Utilization of RWP or Equivalent to Control Entry Into High Radiation Area, Clarifying Example Given in TS of Individuals Qualified in Radiation Protection Procedures + (05:25:29, 13 December 2024)
- ML20113A877 + (05:25:30, 13 December 2024)
- ML20113A878 + (05:25:30, 13 December 2024)
- ML20113A871 + (05:25:31, 13 December 2024)
- L-84-326, Responds to NRC Re Violations Noted in Insp Rept 50-389/83-57.Corrective Actions:Formal Interpretation of Sprinkler Design Re Obstructions Requested from NFPA + (05:25:32, 13 December 2024)
- ML20113A864 + (05:25:33, 13 December 2024)
- ML20113A852 + (05:25:34, 13 December 2024)
- ML20113A858 + (05:25:34, 13 December 2024)
- ML20113A850 + (05:25:35, 13 December 2024)
- ML20113A845 + (05:25:36, 13 December 2024)
- ML20113A836 + (05:25:36, 13 December 2024)
- ML20113A835 + (05:25:38, 13 December 2024)
- ML20113A814 + (05:25:39, 13 December 2024)
- ML20113A810 + (05:25:40, 13 December 2024)
- ML20113A811 + (05:25:40, 13 December 2024)
- ML20113A809 + (05:25:41, 13 December 2024)
- ML20113A805 + (05:25:42, 13 December 2024)
- ML20113A799 + (05:25:43, 13 December 2024)
- ML20113A793 + (05:25:44, 13 December 2024)
- ML20113A786 + (05:25:46, 13 December 2024)