Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20113D536 + (05:17:45, 13 December 2024)
- ML20113D541 + (05:17:45, 13 December 2024)
- ML20113D516 + (05:17:46, 13 December 2024)
- ML20113D513 + (05:17:47, 13 December 2024)
- ML20113D511 + (05:17:48, 13 December 2024)
- ML20113D507 + (05:17:48, 13 December 2024)
- ML20113D503 + (05:17:49, 13 December 2024)
- ML20113D502 + (05:17:49, 13 December 2024)
- W3P84-3020, Advises That Util Will Post Security Guards at Doors D128 & D194 Until Replacement of Security Lock Cores Completed,Per IE Circular 77-04.Completion Anticipated by Late Nov W/O Adversely Impacting Full Load Schedule,Per 10CFR73.2 + (05:17:50, 13 December 2024)
- ML20113D494 + (05:17:51, 13 December 2024)
- ML20113D491 + (05:17:51, 13 December 2024)
- ML20113D490 + (05:17:52, 13 December 2024)
- ML20113D482 + (05:17:54, 13 December 2024)
- ST-HL-AE-1219, Forwards Responses to NRC 850211 Questions.Procedures & Sys Review Branch Questions Will Be Answered by Amend to FSAR Section 14.2 by 850601.W/22 Oversize Drawings.Aperture Cards Available in PDR + (05:17:55, 13 December 2024)
- 3F0485-08, Forwards Annual Schedule Update for Commitments Re Proposed Schedule for Implementation of Emergency Response Capability Requirements,Per Suppl 1 to NUREG-0737,Items 1.C.1,1.D.1, I.D.2,III.A.1.2 & II.A.2.2 + (05:17:57, 13 December 2024)
- ML20113D471 + (05:18:01, 13 December 2024)
- ML20113D470 + (05:18:02, 13 December 2024)
- ML20113D466 + (05:18:03, 13 December 2024)
- ML20113D461 + (05:18:03, 13 December 2024)
- ML20113D460 + (05:18:04, 13 December 2024)
- ML20113D450 + (05:18:05, 13 December 2024)
- ML20113D443 + (05:18:05, 13 December 2024)
- ML20113D438 + (05:18:06, 13 December 2024)
- W3P84-3360, Verifies That Design,Const & Testing Essentially Completed. Unit Ready to Load Fuel.List of Items That Will Be Completed During Low Power Testing & Prior to Exceeding 5% Power Encl + (05:18:07, 13 December 2024)
- ML20113D429 + (05:18:08, 13 December 2024)
- 05000334/LER-1996-008, :on 960531,reactor Trip Occurred.Caused by Test Circuit Applying More Test Current than Amount Required to Test Solenoid Coil.Performed Mod to Reduce Test Current for This Circuit to Lowest Practical Value + (05:18:10, 13 December 2024)
- ML20113D420 + (05:18:11, 13 December 2024)
- ML20113D413 + (05:18:12, 13 December 2024)
- ML20113D417 + (05:18:12, 13 December 2024)
- ML20113D409 + (05:18:13, 13 December 2024)
- ML20113D401 + (05:18:14, 13 December 2024)
- ML20113D398 + (05:18:15, 13 December 2024)
- ML20113D400 + (05:18:15, 13 December 2024)
- ML20113D386 + (05:18:16, 13 December 2024)
- ML20113D385 + (05:18:17, 13 December 2024)
- 05000370/LER-1984-032, :on 841205,notification Received of Event at Korean Unit 5 Re CRD Mechanism Design Similar to Mechanism Installed at Facility.Safety Implications of Continued Operation Evaluated & Interim Actions Taken + (05:18:18, 13 December 2024)
- RBG-20568, Responds to NRC Re Violations Noted in Insp Rept 50-458/84-38.Corrective Actions:Testing of Emergency Diesel Generators a & B Will Be Completed on 850417 Using Test Procedures SST-24-1 & SST-24-2,respectively + (05:18:19, 13 December 2024)
- ML20113D366 + (05:18:20, 13 December 2024)
- ML20113D358 + (05:18:21, 13 December 2024)
- ML20113D365 + (05:18:21, 13 December 2024)
- ML20113D351 + (05:18:22, 13 December 2024)
- GO2-83-959, Forwards Updated Const Status Repts as of 830930.One Oversize Figure Encl.Aperture Card Available in PDR + (05:18:23, 13 December 2024)
- ML20113D349 + (05:18:23, 13 December 2024)
- W3P85-0151, Informs of Delay of Approx 10 Days in Achieving Mode 4 (Hot Shutdown) Milestone Event.Delay Due to Replacement of Reactor Coolant Pump Seals & Rework of in-core Detector Thermocouple Cables.Operation Date of 850108 Unchanged + (05:18:24, 13 December 2024)
- ML20113D334 + (05:18:25, 13 December 2024)
- ML20113D330 + (05:18:25, 13 December 2024)
- ML20113D327 + (05:18:26, 13 December 2024)
- RBG-20632, Forwards marked-up FSAR Figure 13.1-5,representing Shift Compliment.Figure Will Be Included in Future FSAR Amend, Providing Option to Use Separate Shift Technical Advisor If No Shift Senior Reactor Operator Qualified + (05:18:27, 13 December 2024)
- ML20113D323 + (05:18:28, 13 December 2024)
- ML20113D322 + (05:18:28, 13 December 2024)
- ML20113D319 + (05:18:29, 13 December 2024)