Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- RBG-43157, Monthly Operating Rept for Jul 1996 for River Bend Station Unit 1 + (03:10:13, 13 December 2024)
- ML20116N209 + (03:10:16, 13 December 2024)
- 05000331/LER-1992-016, :on 921022,control Bldg Chiller B Tripped & Could Not Be Promptly Restarted,Resulting in Loss of Control Bldg Air Conditioning.Caused by Air Bubble in Chilled Water Piping.Air Purged & Circuitry Verified Intact + (03:10:18, 13 December 2024)
- 05000302/LER-1992-022, :on 921015,discovered That RCP Lube Oil Collection Drain Tanks Exhibited Fluid Level of 19%.Caused by Accumulation of Over 65 Gallons of Water in Tanks.Fluid Drained from Lube Oil Collection Drain Tanks + (03:10:20, 13 December 2024)
- ML20116N198 + (03:10:22, 13 December 2024)
- 05000302/LER-1992-015, :on 920717,EFIC Sys Actuation Occurred Due to Low OTSG Level.Plant Startup Procedure Will Be Revised to Assure That Both Main Feedwater Pumps Are Capable of Controlling Main Feedwater Flow + (03:10:23, 13 December 2024)
- LD-85-022, Responds to 841126 Request for Addl Info Re Modified Acceptance Criteria for CESSAR-F Section 14.2.12.5.17 on Main & Emergency Feedwater Sys Test.Listed Criterion Will Be Added to Future Amend + (03:10:24, 13 December 2024)
- 05000354/LER-1991-010, :on 910515,discovered ESF Actuation & Automatic Closure of RCIC Torus Vaccum Breaker Inboard Isolation Valve During Functional Testing.Cause Not Determined.Procedure Revised + (03:10:26, 13 December 2024)
- HL-3032, Forwards Util to State of Ga,Dept of Natural Resources Requesting Transfer of NPDES Permit from Georgia Power Co to Southern Nuclear Operating Co in Conjunction W/ Proposed Amends to Licenses,Changing Plant Ownership + (03:10:27, 13 December 2024)
- ML20116N185 + (03:10:28, 13 December 2024)
- ML20116N183 + (03:10:29, 13 December 2024)
- RBG-37748, Requests That Correspondence Previously Addressed to Jc Deddens Be Addressed to PD Graham & Lists Organizational Changes at Rgs,Effective 921116 + (03:10:30, 13 December 2024)
- ML20116N181 + (03:10:31, 13 December 2024)
- 05000456/LER-1992-013-06, :on 921023,spurious Safety Injection Signal Occurred.Cause Unknown.Addl Troubleshooting Performed on Train B + (03:10:33, 13 December 2024)
- 05000423/LER-1996-005-03, :on 960321,design Noncompliance Noted for High Temp Automatic Start Feature of SWS Booster Pumps.Caused by Weakness in Design Control Process.Operating Procedures Revised + (03:10:35, 13 December 2024)
- ML20116N168 + (03:10:36, 13 December 2024)
- 05000263/LER-1992-010-01, Forwards LER 92-010-01,modifying Root Cause of First Event, Based on Investigation Delineated in LER 92-012-00 + (03:10:39, 13 December 2024)
- HL-3024, Responds to NRC Re Exercise Weaknesses Noted in Insp Repts 50-321/92-19 & 50-366/92-19.Corrective Actions: Remedial Fire Drill Will Be Performed & Critiqued During Planned Facility Activation Exercise on 921211 + (03:10:40, 13 December 2024)
- B11532, Forwards Responses to Core Performance Branch 850307 Request for Addl Info Re three-loop Operation + (03:10:41, 13 December 2024)
- ML20116N162 + (03:10:41, 13 December 2024)
- ML20116N155 + (03:10:42, 13 December 2024)
- 05000373/LER-1992-012-07, :on 921102,required TS Fire Watch of 690-ft Elevation of Offgas Bldg Not Performed.Caused by Miscommunication Between Individuals Performing Fire Watch During Turnover.Fire Watch Performed + (03:10:44, 13 December 2024)
- ML20116N152 + (03:10:45, 13 December 2024)
- ML20116N147 + (03:10:46, 13 December 2024)
- ML20116N148 + (03:10:46, 13 December 2024)
- 05000354/LER-1996-020, :on 960719,south Plant Vent Radioactive Gaseous Effluent Monitor Declared Inoperable.Caused by Failure to Perform Actions for Inoperable Instrumentation.Frequency of Grab Samples Flow Estimations Increased + (03:10:48, 13 December 2024)
- ML20116N134 + (03:10:49, 13 December 2024)
- 05000317/LER-1992-005-01, :on 921016,MSSV Lift Settings Were in Excess of TS Allowable Limits.Caused by Inaccurate K Factors in Calculation of as-left Relief Valve Lifting Pressures for Affected Valves.Procedures Re K Factor Revised + (03:10:51, 13 December 2024)
- ML20116N131 + (03:10:52, 13 December 2024)
- ML20116N120 + (03:10:53, 13 December 2024)
- U-602619, Proposed Tech Specs 5.0, Administrative Controls, Deleting Examples Currently Included in Parentheses + (03:10:53, 13 December 2024)
- ML20116N119 + (03:10:54, 13 December 2024)
- ML20116N115 + (03:10:55, 13 December 2024)
- ML20116N114 + (03:10:55, 13 December 2024)
- RBG-20775, Interim Deficiency Rept DR-295 Re AKD-6 480-volt Switchgear Supplied by Ge.Interim on Final Rept Will Be Provided by 850514 + (03:10:56, 13 December 2024)
- ML20116N110 + (03:10:57, 13 December 2024)
- RBG-20776, Interim Deficiency Rept DR-292 Re Control Relay Contacts for CRD Backup Scram Valves Supplied by Ge.Interim or Final Rept Will Be Provided by 850515 + (03:10:57, 13 December 2024)
- ML20116N104 + (03:10:58, 13 December 2024)
- ML20116N107 + (03:10:58, 13 December 2024)
- ML20116N102 + (03:10:59, 13 December 2024)
- ML20116N098 + (03:11:00, 13 December 2024)
- RBG-20774, Interim Deficiency Rept DR-293 Re Structural Steel Supplied by Interstate Steel Supply Co.Interim or Final Rept Will Be Provided by 850515 + (03:11:00, 13 December 2024)
- ML20116N097 + (03:11:01, 13 December 2024)
- 05000321/LER-1996-011, :on 960719,periodic Valve Position Check Required by Unit TS SR Had Not Been Performed.Caused by Inadequate Procedures.Procedures Revised to Include Periodic Position Check + (03:11:03, 13 December 2024)
- ST-HL-AE-1242, Second Interim Deficiency Rept Re Potential Failure of Nonseismic Tank Level & Flow Switches During Earthquake. Initially Reported on 850207.Component Cooling Water Surge Tank Level Switches Provided.Next Rept Expected by 850712 + (03:11:04, 13 December 2024)
- DCL-85-174, Suppl 1 to Startup Test Rept, for Nov 1984 - Jan 1985 + (03:11:05, 13 December 2024)
- ML20116N087 + (03:11:06, 13 December 2024)
- 05000361/LER-1985-022, :on 850330,during Monthly Surveillance on Pressurizer Pressure Low,Technician Removed Bypass from Channels A,C & D.Caused by Personnel Error.Technician Disciplined + (03:11:07, 13 December 2024)
- U-602624, Application for Amend to License NPF-62,changing TS to Incorporate Revised SLMCPR as Calculated by GE for CPS Cycle 7 + (03:11:08, 13 December 2024)
- 05000454/LER-1985-042, :on 850329 & 0410,reactor Tripped Due to Four Shutdown Bank a Group 1 Rods Losing Gripper Coil Current & Falling Into Core.Caused by Faulty Circuit Card in CRD Logic Cabinet.Card Replaced + (03:11:10, 13 December 2024)
- ML20116N078 + (03:11:11, 13 December 2024)