Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20118C014 + (02:16:16, 13 December 2024)
- ML20118C013 + (02:16:17, 13 December 2024)
- 05000265/LER-1992-018, :on 920529,HPCI Sys Manuually Isolated Due to Inadequate Procedure.Caused by Spurious HPCI High Area Temp Alarm.Temp Switches Calibr & Functionally Tested + (02:16:19, 13 December 2024)
- ML20118C008 + (02:16:20, 13 December 2024)
- ML20118C010 + (02:16:20, 13 December 2024)
- ML20118C006 + (02:16:21, 13 December 2024)
- NRC-92-0093, Application for Amend to License NPF-43,updating Stds Used to Specify Test Methods for EDG Fuel Oil from ASTM D4057-81 to ASTM D4057-88 + (02:16:21, 13 December 2024)
- ML20118C002 + (02:16:24, 13 December 2024)
- NRC-92-0114, Provides Implementation Dates for Approved License Amends for Fermi 2,as Requested by Tg Colburn to Update NRC Documen Tracking Sys.Amends Cover Crefs,Radiological Effluent TS, Snubber Visual Insp & RCS Pressure Isolation Valves + (02:16:25, 13 December 2024)
- ML20118B995 + (02:16:26, 13 December 2024)
- ML20118B994 + (02:16:27, 13 December 2024)
- ML20118B993 + (02:16:27, 13 December 2024)
- 05000458/LER-1992-009, :on 920618,determined That Discrepancy in TS 3.6.1.3,Table 3.6.1.3-1 Resulted in Failure to Perform Surveillance Tests on post-accident Sampling Sys Valves. Caused by Inadequate Diagram.Diagram Revised + (02:16:29, 13 December 2024)
- ML20118B960 + (02:16:31, 13 December 2024)
- ML20118B959 + (02:16:31, 13 December 2024)
- ML20118B954 + (02:16:32, 13 December 2024)
- ML20118B957 + (02:16:32, 13 December 2024)
- ML20118B952 + (02:16:33, 13 December 2024)
- ML20118B940 + (02:16:34, 13 December 2024)
- ML20118B939 + (02:16:34, 13 December 2024)
- ML20118B935 + (02:16:35, 13 December 2024)
- ML20118B933 + (02:16:42, 13 December 2024)
- ML20118B926 + (02:16:43, 13 December 2024)
- ML20118B930 + (02:16:43, 13 December 2024)
- ML20118B919 + (02:16:45, 13 December 2024)
- ML20118B918 + (02:16:45, 13 December 2024)
- ML20118B916 + (02:16:47, 13 December 2024)
- TXX-9247, Final Deficiency Rept CP-86-41 Re Effect of Small Break LOCA During Mode 4 Operation.Initially Reported on 860528. Westinghouse Owners Group Program Modified to Eliminate Use of leak-before-break Methodology + (02:16:47, 13 December 2024)
- 05000413/LER-1992-011-01, :on 920830,unexpected ESF Actuation Occurred, Resulting in Auxiliary Feedwater Sys Autostart When DG Load Sequencer 1B Reset.Caused by Use of Defective Procedure. Train B Reset & SG Blowdown Realigned + (02:16:49, 13 December 2024)
- HL-2922, Comment on Proposed Rule Misc (92-3) Re Alternative Means of Dispute Resolution.Util Agrees W/Numarc Comments Entirely + (02:16:50, 13 December 2024)
- ML20118B904 + (02:16:51, 13 December 2024)
- 2CAN099209, Forwards Rev to 901009 Application for Amend to License NPF-6,changing TS Re Emergency Power Sys - DG to Incorporate GL 84-15,per Util 920512 Response to NRC Request for Addl Info + (02:16:52, 13 December 2024)
- 05000263/LER-1992-008, :on 920624,1-inch Conduit Fire Barrier Declared Inoperable & on 920831,4-inch Conduit Fire Barrier Declared Inoperable Based on Review of NRC Bulletin 92-001 & Suppl 1. Continuous Fire Watch Established + (02:16:53, 13 December 2024)
- 05000302/LER-1992-019, :on 920902,both Chemical Addition Sys Boric Acid Pumps Declared Inoperable Due to Undersized Thermal Overload Elements.Thermal Overload Elements Replaced W/ Elements Sized to Prevent Tripping + (02:16:56, 13 December 2024)
- NRC-92-0102, Comment Supporting Review of Reactor Licensee Reporting Requirements.Endorses NUMARC Comments + (02:16:56, 13 December 2024)
- 05000328/LER-1992-012-01, :on 920904,fire Reported at B-phase Main Transformer Neutral Bushing to Main Cr,Resulting in Closing of Isolation Valves as Result of Hi Hi Heater Levels.Caused by Sys Perturbation.Plant Power Reduced + (02:17:02, 13 December 2024)
- ML20118B859 + (02:17:03, 13 December 2024)
- ML20118B858 + (02:17:04, 13 December 2024)
- TXX-9245, Submits Inservice Insp Special Rept on full-length Exams of 4,153 SG Tubes Performed During First Refueling Outage.No Tubes Exceeding 40% through-wall Plugging Limit Noted.Three Tubes Recovered.No Tubes Plugged + (02:17:05, 13 December 2024)
- 05000325/LER-1990-013, :on 900725,determined That Cad/Containment Atmosphere Dilution Subsystem Design Did Not Meet FSAR Re Redundancy of Power Supply for Vaporizer Trains.Caused by Changing Regulatory Commitments.Sys Reviewed + (02:17:07, 13 December 2024)
- ML20118B837 + (02:17:08, 13 December 2024)
- ML20118B843 + (02:17:08, 13 December 2024)
- ML20118B836 + (02:17:09, 13 December 2024)
- ML20118B834 + (02:17:10, 13 December 2024)
- ML20118B831 + (02:17:11, 13 December 2024)
- ML20118B832 + (02:17:11, 13 December 2024)
- NRC-92-0116, Responds to Suppl 1 to NRC Bulletin 92-001, Failure of Thermo-Lag 330 Fire Barrier Sys to Perform Specified Fire Endurance Function. Eleven Areas in Plant Identified W/Subj Matl.Roving Hourly Fire Watch Patrol Established + (02:17:12, 13 December 2024)
- ML20118B829 + (02:17:13, 13 December 2024)
- 05000333/LER-1992-042, :on 920901,discovered That Fire Watch Posts Not Being Maintained Due to Personnel Error.Posts re-established W/Other Qualified Fire Watch Personnel & Reinforcement of Relevant Requirements Will Be Reviewed + (02:17:14, 13 December 2024)
- 05000423/LER-1992-021-01, :on 920831,discovered That Testing for Loop Stop Valve Not Adequate.Caused by Incomplete Review When Preparing Containment Electrical Penetration Protection Drawing.Backup Breakers for Valves Verified + (02:17:17, 13 December 2024)
- 05000440/LER-1992-016-05, :on 920906,identified That Fhb HVAC Supply Fan B Tripped Due to Instrumentation Drift of Differential Pressure Switch.Caused by Equipment Failure.Fhb Exhaust Switches Will Be Shortened from 24 to 3 Months + (02:17:19, 13 December 2024)
- ML20118B750 + (02:17:20, 13 December 2024)