Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML12215A004 + (04:15:51, 12 January 2025)
- ML12215A003 + (04:15:52, 12 January 2025)
- ML12215A002 + (04:15:53, 12 January 2025)
- ML12214A607 + (04:15:54, 12 January 2025)
- ML12214A594 + (04:15:55, 12 January 2025)
- L-PI-11-085, Initial License Examination Reference Materials Transmission Letter + (04:15:56, 12 January 2025)
- ML12214A586 + (04:15:57, 12 January 2025)
- ML12214A583 + (04:15:58, 12 January 2025)
- ML12214A584 + (04:15:58, 12 January 2025)
- ML12214A581 + (04:15:59, 12 January 2025)
- ML12214A578 + (04:16:00, 12 January 2025)
- ML12214A574 + (04:16:01, 12 January 2025)
- ML12214A572 + (04:16:02, 12 January 2025)
- ML12214A553 + (04:16:03, 12 January 2025)
- ML12214A548 + (04:16:04, 12 January 2025)
- ML12214A487 + (04:16:05, 12 January 2025)
- IR 05000440/2012003 + (04:16:19, 12 January 2025)
- ML12214A483 + (04:16:20, 12 January 2025)
- ML12214A480 + (04:16:21, 12 January 2025)
- ML12214A470 + (04:16:23, 12 January 2025)
- ML12214A467 + (04:16:24, 12 January 2025)
- IR 05000289/2012003 + (04:16:25, 12 January 2025)
- ML12214A461 + (04:16:26, 12 January 2025)
- ML12214A458 + (04:16:28, 12 January 2025)
- IR 05000352/2012003 + (04:16:30, 12 January 2025)
- Press Release-12-089, NRC Completes Reintegration of Security Into Reactor Oversight Process Assessments + (04:16:31, 12 January 2025)
- ML12214A439 + (04:16:32, 12 January 2025)
- 05000259/LER-2012-007, Cable Routing Error Would Result in Failure of Direct Current Control Power to Credited 4kV Shutdown Board 3EA During an Appendix R Event + (04:16:36, 12 January 2025)
- 05000482/LER-2012-005, Regarding Calculation Assumptions Lead to Inadequate Procedure, Resulting in LCO 3.0.3 Entry Due to Non- Functional Class 1 E Electrical Equipment Air Conditioning Unit + (04:16:39, 12 January 2025)
- L-2012-301, In-Service Inspection Program, ISI Fourth Interval - Second Period - SLI-24 Owners Activity Report (OAR-1) + (04:16:39, 12 January 2025)
- RA-12-033, Independent Spent Fuel Storage Installations - NRC Correspondence Distribution List Update + (04:16:42, 12 January 2025)
- AEP-NRC-2012-52, Response to Regulatory Issue Summary 2012-07 Preparation and Scheduling of Operator Licensing Examinations + (04:16:43, 12 January 2025)
- 05000293/LER-2012-002, Regarding Manual Reactor Scram Due to Degraded Condenser Vacuum + (04:16:45, 12 January 2025)
- LR-N12-0220, Loss of Coolant Accident Peak Cladding Temperature Margin Tracking - Annual Report + (04:16:46, 12 January 2025)
- 05000272/LER-2012-003, Regarding a Train a Safety Injection and Reactor Trip + (04:16:48, 12 January 2025)
- 05000237/LER-2012-002, Regarding Inlet Steam Drain Pot Drain Line Leaks Result in HPCI Inoperabilities + (04:16:52, 12 January 2025)
- ML12214A397 + (04:16:52, 12 January 2025)
- 05000410/LER-2012-002, Regarding Loss of Isolation Function on RHR Shutdown Cooling Suction Line Due to Breaker Trip + (04:16:55, 12 January 2025)
- ML12214A373 + (04:16:56, 12 January 2025)
- ML12214A395 + (04:16:56, 12 January 2025)
- ML12214A369 + (04:16:57, 12 January 2025)
- ML12214A359 + (04:16:58, 12 January 2025)
- ML12214A358 + (04:16:59, 12 January 2025)
- IR 05000461/2012007 + (04:17:05, 12 January 2025)
- ML12214A347 + (04:17:06, 12 January 2025)
- ML12214A335 + (04:17:06, 12 January 2025)
- Press Release-12-088, NRC Issues Safety Evaluation Report with Open Items for Limerick Nuclear Plant License Renewal Application + (04:17:07, 12 January 2025)
- ML12214A318 + (04:17:08, 12 January 2025)
- ML12214A317 + (04:17:10, 12 January 2025)
- ML12214A310 + (04:17:10, 12 January 2025)
- SVP-12-081, Provisional Variance (IEPA-12-19) from National Pollutant Discharge Elimination System (NPDES) Permit No. IL0005037 + (04:17:11, 12 January 2025)