Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- L-12-331, Technical Specification 5.6.6.1 - Steam Generator Inspection Report + (02:35:47, 12 January 2025)
- ML12299A081 + (02:35:50, 12 January 2025)
- PLA-6917, Registration for the Use of Dry Fuel Storage Module E-3 + (02:35:53, 12 January 2025)
- PLA-6919, 90 Day Response to NRC Bulletin 2012-01 + (02:35:56, 12 January 2025)
- ML12299A071 + (02:35:57, 12 January 2025)
- ML12299A056 + (02:35:58, 12 January 2025)
- ML122990318 + (02:35:59, 12 January 2025)
- ML122990315 + (02:36:00, 12 January 2025)
- IR 05000254/2012201 + (02:36:01, 12 January 2025)
- IR 05000269/2012404 + (02:36:03, 12 January 2025)
- NRC 2012-0091, Response to NRC Bulletin 2012-01 Design Vulnerability in Electric Power System + (02:36:04, 12 January 2025)
- ULNRC-05926, 90-Day Response to NRC Bulletin 2012-01, Design Vulnerability in Electric Power System + (02:36:06, 12 January 2025)
- ML12298A506 + (02:36:07, 12 January 2025)
- NL-12-124, Supplement to Proposed Change to the Technical Specification Requirement for Containment Sump Level Indication + (02:36:08, 12 January 2025)
- ET 12-0023, 10 CFR 50.46 Thirty Day Report of ECCS Model Changes + (02:36:09, 12 January 2025)
- IR 05000302/2012004 + (02:36:10, 12 January 2025)
- ML12298A500 + (02:36:12, 12 January 2025)
- IR 05000397/2012502 + (02:36:13, 12 January 2025)
- ML12298A446 + (02:36:18, 12 January 2025)
- ML12298A430 + (02:36:19, 12 January 2025)
- ML12298A428 + (02:36:20, 12 January 2025)
- ML12298A401 + (02:36:21, 12 January 2025)
- ML12298A384 + (02:36:22, 12 January 2025)
- ML12298A362 + (02:36:24, 12 January 2025)
- CP-201201258, Spent Fuel Pool Criticality Analysis + (02:36:25, 12 January 2025)
- RNP-RA/12-0108, Replacement Enclosure Cover Page for Request for Technical Specification (TS) Changes Regarding TS 3.1.4 Rod Group Alignment Limits and TS 3.1.7 Rod Position Indication + (02:36:26, 12 January 2025)
- LR-N12-0328, Loss of Coolant Accident Peak Cladding Temperature Margin Tracking - 30 Day Report + (02:36:27, 12 January 2025)
- BSEP 12-0100, Annual Report of Emergency Core Cooling System Evaluation Model Changes and Errors + (02:36:28, 12 January 2025)
- 05000285/LER-2012-019, Regarding Traveling Screen Sluice Gates Found with Dual Indication + (02:36:32, 12 January 2025)
- NL-12-2144, Southern Nuclear Operating Companys Initial Status Report in Response to March 12, 2012 Commission Order Modifying Licenses with Regard to Reliable Hardened Containment Vents (Order Number EA-12-050) + (02:36:34, 12 January 2025)
- NL-12-2151, Southern Nuclear Operating Companys Initial Status Report in Response to 3/12/2012 Commission Order Modifying Licenses with Regard to Requirements for Reliable Spent Fuel Pool Instrumentation (Order No. EA-12-051) + (02:36:39, 12 January 2025)
- NL-12-2150, Southern Nuclear Operating Companys Initial Status Report in Response to March 12, 2012 Commission Order Modifying Licenses with Regard to Requirements for Reliable Spent Fuel Pool Instrumentation + (02:36:46, 12 January 2025)
- NL-12-2152, Southern Nuclear Operating Companys Initial Status Report in Response to March 12, 2012 Commission Order Modifying Licenses with Regard to Requirements for Reliable Spent Fuel Pool Instrumentation (Order Number EA-12-051) + (02:36:52, 12 January 2025)
- NL-12-2147, Southern Nuclear Operating Companys Initial Status Report in Response to March 12, 2012 Commission Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events + (02:36:58, 12 January 2025)
- NL-12-2146, Southern Nuclear Operating Companys Initial Status Report in Response to March 12, 2012 Commission Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events + (02:37:03, 12 January 2025)
- NL-12-2145, Southern Nuclear Operating Companys Initial Status Report in Response to March 12, 2012 Commission Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events + (02:37:07, 12 January 2025)
- Press Release-12-119, NRC to Hold Public Scoping Meetings for Waste Confidence Environmental Study Nov. 14 in Rockville, MD + (02:37:12, 12 January 2025)
- ML12298A221 + (02:37:13, 12 January 2025)
- Press Release-12-118, ASLB to Hear Oral Arguments Nov. 5-6 on Contention Regarding Cracks in Davis-Besse Shield Building + (02:37:14, 12 January 2025)
- ML12298A179 + (02:37:16, 12 January 2025)
- ML12298A172 + (02:37:17, 12 January 2025)
- IR 05000346/2012004 + (02:37:38, 12 January 2025)
- ML12298A166 + (02:37:45, 12 January 2025)
- Regulatory Guide 1.42 + (02:37:47, 12 January 2025)
- Regulatory Guide 1.58 + (02:38:22, 12 January 2025)
- Regulatory Guide 1.48 + (02:38:25, 12 January 2025)
- Regulatory Guide 1.46 + (02:38:27, 12 January 2025)
- ML12298A122 + (02:38:29, 12 January 2025)
- ML12298A120 + (02:38:31, 12 January 2025)
- ML12298A119 + (02:38:32, 12 January 2025)
- ML12298A118 + (02:38:35, 12 January 2025)