Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- B14291, Proposed TS 3/4 6-3.d Increasing Type B & C Surveillance Testing Intervals from 24 Months to 34 Months for Cycle 4 Only + (20:43:07, 12 December 2024)
- ML20127M504 + (20:43:08, 12 December 2024)
- ML20127M506 + (20:43:08, 12 December 2024)
- ML20127M500 + (20:43:09, 12 December 2024)
- ML20127M501 + (20:43:09, 12 December 2024)
- ML20127M498 + (20:43:10, 12 December 2024)
- ML20127M497 + (20:43:11, 12 December 2024)
- ML20127M496 + (20:43:12, 12 December 2024)
- ML20127M495 + (20:43:12, 12 December 2024)
- ML20127M494 + (20:43:16, 12 December 2024)
- 05000293/LER-1985-010, :on 850412,two in-series Secondary Containment Isolation Dampers Would Not Fully Close.Caused by Slippage in Drive Gears & Cracking Due to Aging & Fatigue.Gears Replaced + (20:43:18, 12 December 2024)
- ML20127M492 + (20:43:20, 12 December 2024)
- ML20127M490 + (20:43:21, 12 December 2024)
- ML20127M489 + (20:43:22, 12 December 2024)
- 05000254/LER-1992-026-02, :on 921027,discovered That RCIC Flow Transmitter Out of Calibr,Resulting in Pump Flow Below TS Requirements.Caused by Setpoint Drift.Calibr of Flow Transmitter Verified + (20:43:24, 12 December 2024)
- ML20127M486 + (20:43:26, 12 December 2024)
- AECM-85-0165, Identifies Addl Exceptions to Literal Requirements of 10CFR50,App R for Some Fire Areas as Suppl to 850507 Summary Rept of Findings in Review of Fire Protection.Exceptions Pertain to Fire Barrier Wrapping of Cable Raceways + (20:43:27, 12 December 2024)
- ML20127M482 + (20:43:28, 12 December 2024)
- ML20127M481 + (20:43:29, 12 December 2024)
- 05000354/LER-1992-014-02, :on 921023,RWCU & RHR Sys Isolation Occurred as Result of Partial Loss of Power to Nssss Sys Control Logic. Caused by Design Deficiency.Engineering Evaluation Underway to Determine If Addl Mods Required + (20:43:31, 12 December 2024)
- ML20127M477 + (20:43:33, 12 December 2024)
- ML20127M478 + (20:43:33, 12 December 2024)
- B14347, Application for Amend to License NPF-49,changing TS Section 4.7.10.e,to Extend SR Frequency for Snubber Functional Tests by Allowing one-time Extension to Current 18 Month Surveillance,Plus Addl 25% Allowed by TS 4.0.2 + (20:43:35, 12 December 2024)
- ML20127M471 + (20:43:35, 12 December 2024)
- ML20127M470 + (20:43:36, 12 December 2024)
- B14258, Informs of Commitment to Perform 18-month PORV Stroke Test During Mode 3 or 4 Only When Entering Into Mode 3 or 4 from Higher Mode Operations (Modes 1 or 2),in Response to GL 90-06 & NRC Ltr + (20:43:37, 12 December 2024)
- ML20127M468 + (20:43:38, 12 December 2024)
- ML20127M467 + (20:43:39, 12 December 2024)
- ML20127M464 + (20:43:39, 12 December 2024)
- ML20127M463 + (20:43:40, 12 December 2024)
- ML20127M460 + (20:43:41, 12 December 2024)
- 05000348/LER-1992-005-01, :100% Eddy Current Insps of Available Tubes in All Three SG Determined That 169 Tubes,Previously in Svc, Defective & Require Classification as Category C-3.Caused by Stress Corrosion Cracking.Tubes Plugged + (20:43:45, 12 December 2024)
- ML20127M458 + (20:43:46, 12 December 2024)
- ML20127M457 + (20:43:47, 12 December 2024)
- 05000362/LER-1985-013-01, :on 850408,reactor Shut Down Due to Turbine Trip Initiated by Low Seal oil-to-gas Differential.Caused by Failed Pipe Fitting in Generator Hydrogen Seal Oil Sys. Fitting Removed & Replaced + (20:43:50, 12 December 2024)
- ML20127M452 + (20:43:52, 12 December 2024)
- ML20127M447 + (20:43:53, 12 December 2024)
- 05000353/LER-1992-011-02, :on 921027,established Firewatch Insp for Area Containing Inoperable Fire Barrier Not Performed Per TS 3.3.7.Caused by Cognitive Personnel Error.All Firewatch Personnel Counseled Re Attention to Detail + (20:43:56, 12 December 2024)
- ML20127M445 + (20:43:57, 12 December 2024)
- 05000369/LER-1992-010-02, :on 920916,discovered That Containment Structure Mechanical Penetration M-309 Developed Steam Leak on 840720.Caused by Design Deficiency & Equipment Failure. Station Problem Rept Initiated + (20:43:59, 12 December 2024)
- ML20127M442 + (20:44:00, 12 December 2024)
- 05000374/LER-1992-015-06, :on 921029,RWCU Isolated on Sustained Delta Flow High Signal When RWCU Filter/Demineralizer Deisolated. Caused by Personnel Error.Operators Will Be Trained on Event & RWCU Precoat Procedures Revised + (20:44:02, 12 December 2024)
- ML20127M440 + (20:44:03, 12 December 2024)
- ML20127M439 + (20:44:04, 12 December 2024)
- ML20127M436 + (20:44:05, 12 December 2024)
- ML20127M435 + (20:44:06, 12 December 2024)
- ML20127M434 + (20:44:07, 12 December 2024)
- ML20127M433 + (20:44:07, 12 December 2024)
- 05000348/LER-1992-006-01, :on 921028,inadvertent Actuation of ESF Occurred When Electrician Allowed Jumper to Make Contact W/ Adjacent Terminal Inside Sequencer.Event Discussed W/ Personnel & Electrician Coached + (20:44:10, 12 December 2024)
- ML20127M430 + (20:44:12, 12 December 2024)
- ML20127M431 + (20:44:12, 12 December 2024)