Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20132B840 + (15:19:50, 12 December 2024)
- ML20132B841 + (15:19:50, 12 December 2024)
- ML20132B838 + (15:19:51, 12 December 2024)
- ML20132B837 + (15:19:52, 12 December 2024)
- ML20132B835 + (15:19:53, 12 December 2024)
- ML20132B834 + (15:19:54, 12 December 2024)
- ML20132B833 + (15:19:55, 12 December 2024)
- TAC:54321 + (15:19:58, 12 December 2024)
- ML20132B831 + (15:19:59, 12 December 2024)
- RBG-21443, Forwards Revs to FSAR & Tech Specs in Response to Auxiliary Sys Branch Concern Re Standby Liquid Control Sys Discussed During Tech Spec Review + (15:20:00, 12 December 2024)
- RBG-21485, Forwards Revs to FSAR Section 8.3 Re Final Loading Info for Standby Diesel Generators.No Addl Impact Expected on FSAR or Proposed Tech Specs.Revs Will Be Included in Future FSAR Amend + (15:20:00, 12 December 2024)
- ML20132B827 + (15:20:01, 12 December 2024)
- TAC:54344 + (15:20:01, 12 December 2024)
- ML20132B826 + (15:20:03, 12 December 2024)
- ML20132B821 + (15:20:05, 12 December 2024)
- RBG-21487, Forwards Final Response to NRC 850430 Request for Addl Info Re Feedwater Line Break Outside Containment.Confirmatory Analysis Encl to Suppl Util 850520 Response,Per Discussion W/Mechanical Engineering Branch + (15:20:05, 12 December 2024)
- ML20132B819 + (15:20:07, 12 December 2024)
- ML20132B820 + (15:20:07, 12 December 2024)
- RBG-21442, Forwards Rev to FSAR Sections 3.6A & App 3C.Revs Result of Completion of Equipment Installation,Final Walkdowns of Equipment Location & Verification of Final Stress Calculations.Info Suppls Submittals Re SER Open Item 3 + (15:20:08, 12 December 2024)
- 05000423/LER-1996-046, Fowards LER 96-046-00.Licensee Commitments Listed,Including Containment Fuel Drop Radiation Monitor Design Reviewed & TS Change Request Will Be Submitted to NRC for Approval + (15:20:09, 12 December 2024)
- ML20132B815 + (15:20:09, 12 December 2024)
- ML20132B813 + (15:20:10, 12 December 2024)
- ML20132B810 + (15:20:10, 12 December 2024)
- ML20132B808 + (15:20:11, 12 December 2024)
- ML20132B807 + (15:20:14, 12 December 2024)
- ST-HL-AE-5514, Fowards Annual Rept of ECCS Model Revs During 1996 + (15:20:15, 12 December 2024)
- ML20132B803 + (15:20:17, 12 December 2024)
- ML20132B804 + (15:20:17, 12 December 2024)
- LIC-96-0197, Informs That Tl Patterson Has Resigned from Util Effective 961213 + (15:20:18, 12 December 2024)
- ML20132B802 + (15:20:18, 12 December 2024)
- ML20132B797 + (15:20:19, 12 December 2024)
- ML20132B796 + (15:20:20, 12 December 2024)
- PNO-II-85-086A, on 850830,Hurricane Elena Located Near Latitude 28.0 North & Longitude 87.5 West,Approx 160 Miles South of Pensacola,Fl.Utils Aware of Location & Prepared to Implement Appropriate Procedures + (15:20:20, 12 December 2024)
- 05000336/LER-1996-035-02, :on 961009,failed to Perform Periodic Surveillance Testing for Interlock Function of Ms Isolation Sys Function of Esas.Caused by Inadequate Training. Surveillance Procedure Revised & I&C Personnel re-trained + (15:20:22, 12 December 2024)
- RBG-21505, Forwards Revs to FSAR Section 14.2.12.1, Preoperational Test Procedures. Effect of Revs on SER & Proposed Tech Specs Discussed.Revs Will Be Included in Future FSAR Amend + (15:20:23, 12 December 2024)
- ML20132B792 + (15:20:24, 12 December 2024)
- LIC-96-0190, Informs NRC of Application of Interim Operability Criteria for Determining Operability of Two Pipe Supports + (15:20:25, 12 December 2024)
- ML20132B791 + (15:20:25, 12 December 2024)
- ML20132B787 + (15:20:26, 12 December 2024)
- ML20132B785 + (15:20:26, 12 December 2024)
- ML20132B784 + (15:20:27, 12 December 2024)
- ML20132B782 + (15:20:28, 12 December 2024)
- ML20132B783 + (15:20:28, 12 December 2024)
- ML20132B781 + (15:20:30, 12 December 2024)
- ML20132B779 + (15:20:31, 12 December 2024)
- ML20132B780 + (15:20:31, 12 December 2024)
- ML20132B776 + (15:20:32, 12 December 2024)
- ML20132B778 + (15:20:32, 12 December 2024)
- LIC-96-0195, Forwards Certificate as Evidence of Util Continuation of Nuclear Energy Liability Insurance Policies of CY97 + (15:20:33, 12 December 2024)
- ML20132B773 + (15:20:34, 12 December 2024)
- ML20132B772 + (15:20:34, 12 December 2024)